KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN HISHAMUDDIN, KUALA LUMPUR.
JABATAN KERJA RAYA MALAYSIA
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR.
SENARAI KUANTITI |
Kami seperti nama syarikat di bawah mengesahkan tawaran harga yang tersenarai di dalam senarai kuantiti ini adalah sama sepertimana di dalam Borang Tender yang dihasilkan di dalam sistem dan sebarang percanggahan akan menyebabkan tawaran kami ditolak. |
A. | Nama Syarikat: | Nama Petender |
B. | CIDB/UPKJ/PUKONSA No.: | No.Pendaftaran Petender |
C. | Xxxxx Xxxxxxx: | Xxxxx Xxxxxxx Xxxxxxxx |
No. Xxxx Xxxxxx: | JKR/CKUB/23745/2024 |
D.
E. | Tarikh Cipta Senarai Kuantiti: | 22/11/2024 |
Senarai kuantiti ini dikeluarkan oleh BBA1/CKUB. Sebarang pertanyaan boleh berhubung dengan pegawai yang menyediakan tender dan maklumat pegawai untuk dihubungi boleh didapati di laman iklan. |
JABATAN KERJA RAYA MALAYSIA |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR. |
SENARAI KUANTITI |
Adendum bil. 1 |
No. Tender: JKR/CKUB/23745/2024 |
RINGKASAN TENDER
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR.
ITEM | DESCRIPTION | PAGE NO. | AMOUNT(RM) |
A B C D E F G | |||
PRELIMINARIES AND GENERAL CONDITIONS OF CONTRACT | A/SUM/1 | ||
DEMOLITIONS WORKS | |||
B1 - BANGUNAN SULAIMAN (ALL PROVISIONAL) | B1/SUM/1 | ||
B2 - BANGUNAN PAVILION (ALL PROVISIONAL) | B2/SUM/1 | ||
BUILDING WORKS | |||
C1 - UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL) | C1/SUM/1 | ||
C2 - UPGRADING OF BANGUNAN PAVILION (ALL PROVISIONAL) | C2/SUM/1 | ||
MECHANICAL WORKS | D/SUM/1 | ||
ELECTRICAL WORKS | E/SUM/1 | ||
EXTERNAL WORKS (ALL PROVISIONAL) | F/SUM/1 | ||
PROVISIONAL SUM | G/SUM/1 | ||
Jumlah di bawa ke Borang Tender | - |
RT/1
JABATAN KERJA RAYA MALAYSIA |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR. |
SEKSYEN II |
SENARAI KUANTITI |
BILL NO. A - PRELIMINARIES |
Item | Description |
A | GENERAL INFORMATION TO BILL OF QUANTITIES |
1.0 | GENERAL |
1.1 | The Works contained in the Contract shall include the provision of all labour, materials, |
constructional plant, temporary or permanent works as required in the Contract. | |
1.2 | The Bill of Quantities shall be read in conjunction with the Conditions of Contract, the |
Specification and the Drawings in the Contract Documents. | |
1.3 | The items as set out in the Bill of Quantities shall apply to the whole of the Works contained in |
the Contract and the Contractor shall allow for compliance with the same and for any cost | |
incurred in connection therewith. | |
1.4 | Headings are not comprehensive and do not necessarily reflect or modify the meaning of the |
items in the B.Q. The exact nature and extent of the work to be carried out shall be | |
ascertained by reference to the Contract as a whole, in particular the Conditions of Contract, | |
the Specification and the Drawings. It shall be read together with the relevant “Method of | |
Payment”. | |
1.5 | The amounts inserted by the Contractor for such items shall be deemed to apply to the whole |
of the Works carried out under this Contract. | |
1.6 | Each item shall be individually priced. Bulk pricing for sections, trades, groups or pages of |
items shall not be allowed and no subsequent claims for loss or expense and/or profit shall be | |
entertained for failure to comply with this clause. | |
1.7 | The rates and prices inserted in the Bill of Quantities shall include cost of the works described, |
all risks, liabilities and obligations set forth or implied in the Contract Document and shall be | |
deemed to include the following, unless expressly stated otherwise: | |
a) the provision of labour and all costs in connection therewith; | |
b) the supply of materials, goods, equipment and storage thereof including delivery to | |
site and all costs in connection therewith; | |
c) taking delivery of materials, goods and equipment necessary for the Works and | |
including those supplied by others, loading and unloading, storage and all costs in | |
connection therewith; | |
d) the usage of plants and machineries and all costs in connection therewith; | |
e) the fixing, erecting and installing or placing in position of materials, goods | |
and equipment including around obstruction, tolerances, penetration, working | |
space, over-breaks etc. and all costs in connection therewith; | |
f) the provision of all temporary works and all costs in connection therewith unless | |
separately provided for in the Bill of Quantities; |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL
A/1
Item | Description |
g) the phasing requirements of the Works including the effect on the programming | |
of the Works of all traffic and drainage diversions, special structural | |
requirements, earthwork restrictions, alterations to services and street lighting | |
(executed under the Contract or in conjunction with it) and all other requirements of | |
the Contract and all costs in connection therewith; | |
h) all cost of testing to show proof of compliance with the Specification on materials | |
and workmanship inclusive of samples of materials and submission of tests results. | |
Should the frequency of testing and sampling no t specified, then it shall be in | |
accordance with the relevant Malaysian/British Standards and Codes of Practice. | |
Where there is no such relevant Standards and Codes of Practice for reference, it shall | |
then be as instructe by the S.O.; | |
i) all royalties and dues which the Contractor may be required to pay; | |
j) wastage; | |
k) establishment charges, overheads and profit; | |
l) whatsoever method of construction the Contractor may adopt. | |
1.8 | Where any priced item in the B.Q. but has not been executed on site by the Contractor, the |
cost of such priced item shall accordingly be deducted from the Contract Sum. | |
1.9 | All items priced shall be deemed to include compliance with the provisions of the contract, |
statutes, regulation, by-laws or any order or directive issued by public authority or public | |
service company and other related legislation currently in force. | |
2.0 | MEASUREMENT |
2.1 | Quantities in the Bills of Quantities are measured in accordance with the Malaysian Standard |
Method of Measurement of Building Works (2nd Edition Metric 2000). Where eparture have | |
been made from the standards mentioned, the method adopted in the Bills shall be adhered to | |
for the purposes of ascertaining the value of all variations and measurements. | |
3.0 | UNPRICED ITEMS |
3.1 | Where any item is left unpriced, it shall be deemed that the cost of such item has been |
allowed for elsewhere within this document. No subsequent claims arising out of expense | |
and/or loss incurred against such unpriced item shall be entertained. |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL
A/2
Item | Description |
4.0 | GENERAL ATTENDANCE FOR NOMINATED SUB-CONTRACTORS AND NOMINATED |
SUPPLIERS | |
4.1 | Attendance and facilities for Nominated Sub-contractors and nominated suppliers shall |
include: | |
a) in the case of works or services executed : for allowing the use of existing | |
working space, access, temporary roads, erected scaffolding, sanitary, welfare | |
and other facilities existing on Site and the provision of protection, water, | |
electricity for lighting and clearing away rubbish and debris arising from the work; | |
b) in the case of goods, materials or services supplied : for taking delivery, | |
unloading, storing, protection and returning crates, cartons and packing materials, | |
all as specified in the specification. | |
5.0 | PHASING SEQUENCE OF OPERATIONS AND METHODS OF CONSTRUCTION |
5.1 | The rates and prices shall, unless otherwise stated, include for the costs of compliance with |
any restrictions imposed on the programming of the Works by the Government and Local | |
Authorities and other relevant authorities dealing with phasing sequence of operations, | |
method of construction, safety and health and liaison and access. | |
6.0 | TRIALS, SAMPLES, TESTS AND INSPECTION |
6.1 | The rates and prices shall include for a testing laboratory or laboratory approved by SIRIM or |
accredited by Department of Standard Malaysia (JSM), equipment and staff for carrying out | |
the tests, tests and the effects on the progress of the Works for the carrying out of all trials, | |
sampling and tests whether specified in the Contract Document or otherwise in order to | |
ensure compliance with the requirements of the Specification except where separately | |
itemised in the Bill of Quantities. | |
7.0 | EXISTING SERVICES AND MAINS |
7.1 | The Contractor shall include in his rates and prices for taking measures to locate the actual |
position and provide support and full protection of existing services and mains and other | |
equipment and machineries during the progress of the Works. The Contractor shall inform the | |
S.O. of all arrangements with all Statutory and Public Utility Authorities. | |
8.0 | WORK UNDER WATER |
8.1 | The rates shall include any costs arising from and in connection with the execution of work |
under water wherever required unless otherwise stated. |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL
A/3
Item | Description |
9.0 | PHRASEOLOGY |
9.1 | Differences in the method of billing and in phraseology used in various parts of the Bill of |
Quantities and/or Schedule of Rates shall not be a basis of any claim for an increase in the | |
rates and prices. | |
10.0 | PROVISIONAL SUMS |
10.1 | All provisional sums included in the Bill of Quantities are intended to be approximate |
indications only of the amounts to be expended in respect of the work described and may be | |
omitted entirely or substantially varied without entitling the Contractor to any claim for | |
compensation. No part of the Contractor’s overhead, expenses or profit should be included in | |
these sums when the bill is priced unless items for profit and attendance are specifically | |
allowed for. | |
11.0 | CURRENCY OF PAYMENT |
11.1 | Pricing of the Contract shall be in Malaysian Ringgit to two decimal place. Payment to the |
Contractor under the Contract shall be in Malaysian Ringgit. | |
12.0 | TEMPORARY DIVERSIONS |
12.1 | Work in connection with the temporary diversion and relocation of existing overhead and |
underground services, whether detailed in the Contract or not shall be covered by the | |
appropriate Lump Sum Items in Bill No. A : Preliminaries and General Conditions unless | |
separately measured in other parts of the Bill of Quantities. | |
13.0 | ABBREVIATIONS |
13.1 | The following abbreviations or symbols are generally used in the Contract Document and shall |
be read as follows: | |
a) mm : milimetre | |
b) m : metre | |
c) m2 : square metre | |
d) m3 : cubic metre | |
e) kg : kilogramme | |
f) tonne : metric ton | |
g) No. : Number | |
h) L.S. : Lump Sum | |
i) P.C. Sum : Prime Cost Sum | |
j) P.S. : Provisional Sum | |
k) RM : Ringgit Malaysia |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL
A/4
Item | Description |
14.0 | SCOPE OF WORKS |
The works included under this Contract comprises : | |
BILL A - PRELIMINARIES AND GENERAL CONDITIONS | |
BILL B - DEMOLITION WORKS | |
BILL B1 - BANGUNAN SULAIMAN (ALL PROVISIONAL) | |
BILL B2 - BANGUNAN PAVILION (ALL PROVISIONAL) | |
BILL C - BUILDING WORKS | |
BILL C1 - UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL) | |
BILL C2 - UPGRADING OF BANGUNAN PAVILION (ALL PROVISIONAL) | |
BILL D - MECHANICAL WORKS | |
BILL E - ELECTRICAL WORKS | |
BILL F - EXTERNAL WORKS (ALL PROVISIONAL) | |
XXXX X - PROVISIONAL SUM | |
15.0 | LOCATION OF SITE |
15.1 | The site for the proposed Works is located at Bangunan Sulaiman, Jalan Sultan Hishamuddin, |
Kampung Attap, 50000 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur. |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL
A/5
Item | Description | Amount (RM) | |
A B C D E | GENERAL INFORMATION TO BILL OF QUANTITIES | ||
Project Signboard | |||
The Contractor shall provide, erect, paint and maintain a project signboard as directed by the S.O. The signboard shall be erected at a prominent position at the Site as approved by the S.O. and shown in drawing no JKR/CA/P-PTB1M/30/PEL16/003/01C, JKR/CA/PPTB1M/30/PEL16/003/02C and JKR/CA/PPTB1M/30/PEL16/003/03C. | |||
Site Survey and Setting Out | |||
The Contractor shall employ a licensed surveyor to carry out site surveys before commencement and setting out of the Works. | |||
For the purpose of complying with Tenaga Nasional Berhad’s (TNB) requirement, the Contractor shall prepare 15 sets of pre-computation plan which comprised of the survey plan for the TNB Substation. The said pre- computation plan shall be based on the overall certified survey plan by a Licensed Land Surveyor engaged by the Contractor for the project (measured separately). The pre-computation plan shall be prepared and certified by a Licensed Land Surveyor engaged by the Contractor and submitted to the S.O. for approval. | |||
Dilapidation Survey | |||
The Contractor shall carry out dilapidation survey as directed by the S.O. | |||
Temporary Diversion and Relocation of Existing Overhead and Underground Services | |||
The Contractor shall enquire from the various authorities and make arrangements for the disconnection, removal, relocation and reconnection of services and pay all necessary cost and fees in connection therewith and make good all damage as specified. | |||
Construction Plan | |||
The Contractor shall submit to the S.O. for his approval the following as specified : | |||
a) Programme of Works | |||
b) Method statements | |||
c) Contractor's organisation chart | |||
d) Schedules | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
A/6
Item | Description | Amount (RM) | |
A B C | GENERAL INFORMATION TO BILL OF QUANTITIES | ||
e) Quality Assurance Plan for Works Contract worth RM10 Million and above | |||
i) Provide a quality Assurance Team full time on Site for the institution, administration and maintenance of the Quality Assurance Plan and the preparation and submission of all Quality Assurance Reports as specified, throughout the duration of the contract. | |||
ii) The Contractor shall appoint a suitably qualified and experienced person to act solely as a Quality Assurance Officer full time on site to lead Quality Assurance Team. (Refer Addendum to specification for project worth RM 10 Million and above). | |||
Contractor's Plant | |||
The Contractor shall provide, erect, keep insured, maintain and remove on completion all requisite scaffolding, hoist, cranage, construction plant, ladder, staging, tarpaulins, tools, vehicles, tackles and other plants and apparatus (excluding piling and pile testing equipment), as necessary for the execution of the Works as specified. | |||
Temporary Water And Power Supplies For The Works | |||
The Contractor shall provide adequate power and water supplies for the execution of the works including paying all associated costs and fees as specified. | |||
Site Security | |||
The Contractor shall provide all necessary personnel and lighting for the security of the site at all times until completion of the whole Works as specified. | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
A/7
Item | Description | Amount (RM) | |
A B C D E F G H | GENERAL INFORMATION TO BILL OF QUANTITIES | ||
Temporary Access And Maintenance Of Existing Roads | |||
The Contractor shall provide and maintain all necessary temporary roads, culverts, tracks, bridges, et cetera for access to and within the Site as specified as long as required to the approval of the S.O. as specified. | |||
The Contractor shall maintain all access including existing roads, bridges, drains, culverts, roadside furniture, and all other appurtenances and services on such roads throughout the construction period. The Contractor shall make good any above mentioned item damaged by any work carried out by him. | |||
The Contractor shall reinstate the same to their original condition to the satisfaction of S.O. and provide support and full protection of existing services and mains during the progress of the Works. The Contractor shall inform the S.O. of all arrangements with the various authorities. | |||
Control Of Workmen, Plant And Machinery At Site | |||
The Contractor shall ensure the safety, health and welfare at work of all his workmen as specified. | |||
Contractor's Temporary Accommodation And Facilities For Workmen Living On Site | |||
The Contractor shall provide and maintain temporary accommodation including all necessary facilities and services for water supply, drainage, sanitation and lighting for his staff as specified. | |||
Contractor's Office And Storage | |||
The Contractor shall provide and maintain Contractor’s office and storage on the Site in positions as approved by the S.O. and as specified. | |||
Care And Protection Of Materials And Works | |||
The Contractor shall provide and maintain everything necessary for proper protection of materials and Works from any damage by weather, carelessness or otherwise. Any damage caused shall be made good at the Contractor’s own cost to the approval of the S.O. | |||
Shop Drawings, Samples And Mock-ups | |||
The Contractor shall submit relevant shop drawings, samples of materials or workmanship and mock-ups units, manufacturer’s specifications, et cetera for the S.O.’s approval as specified. | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
A/8
Item | Description | Amount (RM) | |
A B C D E F G H J | GENERAL INFORMATION TO BILL OF QUANTITIES | ||
Progress Photographs | |||
The Contractor shall take progress photographs at monthly intervals or more frequent as directed by the S.O. and submit to the S.O. as specified. | |||
Material Testing Laboratory And Staff | |||
The Contractor shall provide/erect a testing laboratory within the site or rent a premise or propose an accredited laboratory approved by SIRIM or accredited by Department of Standard Malaysia (JSM). The Laboratory shall be equipped with the necessary equipment and staff required to carry out the tests as identified in APPENDIX A/4 (List of Laboratory Equipment). | |||
Office Accommodation For S.O. | |||
The Contractor shall provide and maintain a site office or relocatable site office or rent a premise for the use of the JKR supervisory staff which shall meet the requirement of the JKR design as specified. | |||
Telephone For S.O. | |||
The Contractor shall provide a permanent telephone at the S.O.’s site office for the sole use of the S.O. and his representatives as specified. | |||
Survey Instruments And Personnel | |||
The Contractor shall provide all such instruments, equipment and survey personnel as specified until thirty (30) days after the issuance of the Certificate of Practical completion as per S.O. required. | |||
Site Items For S.O./Office Equipment And Facilities | |||
The Contractor shall provide all Personal Protective Equipment required for the use of the S.O. and his supervisory staff complete as specified and complying with DOSH requirements. | |||
The Contractor shall provide suitable types of fire extinguishers as specified. | |||
The Contractor shall provide the equipment and facilities as listed as specified in APPENDIX A/2 for the use of the S.O., his representatives and staff throughout the Contract Period. | |||
The Contractor shall provide suitable transportation service by means of vehicle(s) including licensed and competent driver(s) as specified in APPENDIX A/3 throughout the duration of the original Contract Period. | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
A/9
Item | Description | Amount (RM) |
A B C D E F G H | GENERAL INFORMATION TO BILL OF QUANTITIES Safe Working Area The Contractor shall supply, erect, maintain and remove on completion of the Works, scaffolding and working platform with safety nettings, catch platforms, safety barricades, fencing, railing, screen wire netting and toe board, guardrails or board fences and sufficient illuminations, all as specified. The Contractor shall supply, erect, maintain and remove on completion of the Works, adequate, protective and security hoarding, scaffolding and working platform with safety nettings and such other safety measures necessary to ensure the safety of the workers, personnel, public and others at or within the vicinity of the Site, all as specified. Safety, Health And Welfare The Contractor shall ensure the safety, health and welfare at work site as specified including but not limited to : a) Provision of First Aid Kit b) Pest control including keeping the site clean and dry to prevent breeding of mosquitoes, rodents, insects and vermin of any kind. c) Fogging at regular intervals *The Contractor shall employ a Safety and Health Officer (SHO) registered with DOSH for the entire contract period to be stationed fulltime at the site (for works exceeding RM 20 million contract value. * Delete if not applicable The Contractor shall employ a Site Safety Supervisor (SSS) registered with DOSH to be stationed a minimum of 15 hours a week at the site for the entire duration of the construction period. The Contractor shall submit 5 copies of Safety and Health Plan (S- Plan) as required in APPENDIX A/5 as specified. The Contractor shall submit 5 copies of monthly Safety and Health Report as required in APPENDIX A/6 as specified. The Contractor shall provide and maintain adequate traffic safety and control including signages, warning lights and flagmen as necessary. | |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
A/10
Item | Description | Amount (RM) |
A B C D | GENERAL INFORMATION TO BILL OF QUANTITIES Keeping The Site Tidy The Contractor shall make every effort to keep the Site in a reasonably clean and tidy condition for the duration of the Works as specified. Coordination of Mechanical and Electrical (M & E) Services The Contractor shall be responsible for coordinating the implementation of all M & E works as specified and appoint M&E Services Coordinator based on project cost as follows : Project Cost (RM) Minimum Requirement of M&E Coordinator Below 10 million 1 COW Between 10 to 50 million 1 Engineer & 1 COW More than 50 million 1 Engineer & 2 COW As-Built Drawings Pursuant to the terms of the contract, the Contractor shall provide approved As-built drawings as follows: 1. Four (4) sets of As-built drawings as actually constructed pertaining to the Works including all services and facilities systems and all supporting documents such as Operation and Maintenance Manual, Testing and Commissioning Certificates. 2. Four (4) sets of Digital Copies in AutoCAD (.dwg) or any other compatible format to be stored in compact discs or removable storage; and 3. Four (4) sets of Digital Copies in Acrobat (.pdf) or any other compatible format to be stored in compact discs or removable storage. The As-built documentation and drawings supplied shall be submitted by the Contractor to the satisfaction of the S.O. as to allow for a complete understanding of the Works as they were actually built. Clearing, Cleaning and Making Good on Completion The Contractor shall clear and clean the Works including existing roads, drains bounding the Site of any debris, earth, et cetera, and making good all damages upon completion as specified. | |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
A/11
Item | Description | Amount (RM) |
A B C D E F | GENERAL INFORMATION TO BILL OF QUANTITIES Form of Contract The Contractor shall refer to the Standard Form of Contract for further information. The Contractor may price here for all expenses involved in complying with the terms of this Clauses, otherwise such expenses are deemed to be included elsewhere. Clause No. 13 – Performance Bond / Performance Guarantee Sum Performance Bond For due observance and performance of this contract the Contractor shall have to provide: i) Performance Bond in the form of an approved Bank or Insurance Guarantee equal to five percent (5%) of the contract sum to be deposited with the Government as a condition precedent to the commencement of any work under this contract. ii) The Performance Bond shall remain valid and effective for the duration as specified in the Contract. Clause No.15 Insurance Against Personal Injuries and Damages to Property Clause No. 16 Indemnities to Government in Respect of Claim by Workmen Clause No. 17 Employees' Social Security Act 1969 Clause No. 18 Insurance of Works | |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
A/12
Item | Description | Amount (RM) | |
A B C D E F | GENERAL INFORMATION TO BILL OF QUANTITIES | ||
Clause No. 22 – Design | |||
Sub-clause No. 22.2 - Design Guarantee Bond Design Guarantee Bond substantially in the form of Bank Guarantee for Design Guarantee Bond (PWD DGB 1/2011) appended in the Tender Document. | |||
Clause No.35 – Materials, Goods and Workmanship | |||
Opening up of work for inspection or testing of materials or goods. | |||
Clause No. 59 - Site Agent And Assistants | |||
The Contractor shall keep constantly on the Site for the full duration of the Contract a competent, efficient, suitably qualified, experienced and good character Site Agent and his assistants in each trade as may be necessary, who must be capable of receiving instructions in Bahasa Malaysia, and in default it shall be the responsibility of the Contractor to provide replacement for them and all wages and other expenses in connection with the employment of such replacement site agent and assistants. Any directions, explanations or instructions given to such site agent by the S.O. shall be deemed to have been given to the Contractor under this contract provide all necessary superintending order. | |||
Traffic Management Plan (TMP) | |||
The contractors shall prepare traffic management plan (TMP) to the approval of the S.O. | |||
Visual Condition Survey and Defect Mapping Works | |||
The Contractor shall investigate and carry out Visual Condition Survey and Defect Mapping Works including submittals and reporting in accordance to the Term of Reference (TUB-09/2024), to cover the following building/blocks : | |||
Bangunan Sulaiman | |||
Bangunan Pavilion | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
A/13
Item | Description | Amount (RM) |
A | GENERAL INFORMATION TO BILL OF QUANTITIES KERJA KONSERVASI PERIHAL KERJA KONSERVASI BANGUNAN Justifikasi adalah merujuk kepada pembaikan kerosakan bangunan yang telah dipulihara pada 2016 Nota: Ulasan yang diberikan adalah secara umum yang meliputi Perihal Kerja sahaja. Butiran Kuantiti dan Kadar Harga hendaklah dirujuk kepada kuantiti sebenar di tapak, kadar semasa dan amalan terbaik kerja pemuliharaan Sebarang kerja perlu dirujuk kepada Konservator Berdaftar Kerajaan terlebih dahulu sebelum kelulusan oleh Pegawai Penguasa. Pihak kami tidak akan bertanggungjawab ke atas sebarang tindakan yang tidak dirujuk kepada pejabat ini. YURAN IKTISAS Keperluan-keperluan dalam syarat-syarat pelantikan Konservator Berdaftar Xxxxxxxx kerja yang dilaksanakan oleh kontraktor hendaklah mematuhi Akta Warisan Kebangsaan 2005 (Akta 645) dan Garis Panduan Pemuliharaan Bangunan Warisan. Kontraktor hendaklah mengemukakan:- i) Penyata kaedah (method statement) bagi semua kerja pemuliharaan untuk kelulusan P.P dan konservator dalaman sebelum semua kerja dilaksanakan. ii) Penyediaan, Kajian, Dokumentasi dan mengemukakan Laporan Dilapidasi, kajian kerosakan dan cadangan pembaikan yang dilulus JWN dan kelulusan P.P) iii) Memantau dan memastikan setiap Method Statement dan kerja pembaikan perlu di semak oleh konservator dan diluluskan kaedah sebelum di laksana ditapak. | |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
A/14
Item | Description | Amount (RM) |
A B | GENERAL INFORMATION TO BILL OF QUANTITIES Pelantikan Konservator Berdaftar dan lain-lain kehendak i) Pihak kontraktor hendaklah melantik konservator berdaftar kategori fizikal yang masih aktif tempoh sah laku (validity) perkhidmatan bagi menjalankan peranan dan tanggungjawabnya seperti yang dinyatakan di dalam Garis Panduan Pemuliharaan Bangunan Warisan. ii) Kontraktor hendaklah mengemukakan CV terkini bagi konservator berdaftar kategori Fizikal yang dicadangkan bersama-sama dengan pengemukaan sebutharga/tender yang menerangkan pengalaman yang berkaitan (yang terdahulu dan semasa). iii) Konservator kontraktor hendaklah bertanggungjawab sepenuhnya ke atas kaedah-kaedah bagi kerja-kerja yang dilaksanakan. Konservator perlu berada di tapak sepenuh masa bagi menyelia kerja-kerja yang dilaksanakan serta semasa lawatan tapak oleh Pegawai Penguasa dan wakilnya. Konservator hendaklah menghadiri semua mesyuarat dan pemeriksaan di tapak sepanjang tempoh kontrak. PENYEDIAAN DOKUMENTASI, ANALISA DAN YANG BERKAITAN Kerja-kerja dokumentasi perlu disediakan dan dikemukakan oleh konservator kontraktor seperti berikut: i)Laporan Sebelum Kerja Pemuliharaan Historical Architectural Building Survey (HABS I) -Draf laporan dikemukakan selewat-lewatnya 1 bulan selepas Surat Setuju Terima (SST) dikeluarkan. ii)Laporan Semasa Kerja Pemuliharaan Historical Architectural Building Survey (HABS II) -Draf laporan dikemukakan secara berperingkat dalam tempoh yang dipersetujui bersama P.P dan konservator. iii) Laporan Selepas Kerja Pemuliharaan Historical Architectural Building Survey (HABS III) -Draf laporan dikemukakan selewat-lewatnya 1 bulan selepas Sijil Perakuan Siap Kerja (CPC) dikeluarkan. iv) Laporan Akhir Kerja Pemuliharaan -Draf laporan dikemukakan selewat-lewatnya 1 bulan selepas Sijil Perakuan Siap Kerja (CPC) dikeluarkan. Laporan final dikemukakan selewat-lewatnya 1 bulan setelah Sijil Perakuan Siap Memperbaiki Kecacatan (CMGD) dikeluarkan. v) Rakaman video (videografi) kerja-kerja sebelum, semasa dan selepas dilaksanakan (30 minit) - dikemukakan bersama-sama Laporan HABS I, II dan III. | |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
A/15
Item | Description | Amount (RM) |
A | GENERAL INFORMATION TO BILL OF QUANTITIES vi) Video Korporat berkualiti tinggi berdurasi 3 - 5 minit untuk tujuan promosi. vii)Penyediaan 'Coffee Book Table' sebanyak 20 salinan bewarna dengan kertas berkualiti Penyediaan Lukisan Terukur (3D Thermal Laser Scanning) keseluruhan tapak bangunan yang disemak dan disahkan oleh Perunding bertauliah Penyediaan kerja awalan untuk pelindungan menyeluruh kepada bangunan dan tapak sekitar sepanjang kerja agar dapat mengawal kerosakan binaan sedia ada, kerja penyerapan air dalam dinding, kerja water proofing keperluan ruang penyimpanan barang, pengukuhan struktur dan lain-lain kerja berkaitan. | |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
A/16
Item | Description | Amount (RM) |
GENERAL INFORMATION TO BILL OF QUANTITIES COLLECTION FROM PAGE NO. A/6 FROM PAGE NO. A/7 FROM PAGE NO. A/8 FROM PAGE NO. A/9 FROM PAGE NO. A/10 FROM PAGE NO. A/11 FROM PAGE NO. A/12 FROM PAGE NO. A/13 FROM PAGE NO. A/14 FROM PAGE NO. A/15 FROM PAGE NO. A/16 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Ringkasan Tender : |
A/17
APPENDIX A/1A
LIST OF ESTIMATED QUANTITY FOR S.O’S PERSONAL PROTECTIVE EQUIPMENT (PPE)
No. | Items | Cost of Projects | |||
< RM 5 Mil | RM 5 Mil - RM 20 Mil | > RM 20 mil. – RM50 mil. | > RM 50 mil. | ||
1 | Safety Boots | 5 pairs | 10 pairs | 15 pairs | 20 pairs |
2 | Safety Helmets | 5 pcs | 10 pcs | 15 pcs | 20 pcs |
3 | Full Body Harness (for working at height) If required | If required | If required | If required | If required |
4 | Protective gloves | If required | If required | If required | If required |
5 | Safety Goggles | If required | If required | If required | If required |
6 | Safety Jackets of reflective type | If required | If required | If required | If required |
7 | Ear plugs and muffs | If required | If required | If required | If required |
8 | Dust masks | If required | If required | If required | If required |
9 | Head lamp | If required | If required | If required | If required |
10 | ….. (insert other item if required) | ||||
* The Contractor shall provide necessary space/ furniture for storage
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, KL
A/18 Adendum bil.1 bertarikh22/11/2024 - 10:40 AM
APPENDIX A/2
LIST OF S.O.'S FACILITIES AND EQUIPMENT
BIL | ITEM | QUANTITY |
TIDAK BERKENAAN |
Notes: |
All software to be supplied under this Contract shall be original and legal copies. The software shall be registered under the name of the Contractor. The Contractor shall submit all documentation evidence of the originality and legality of the software. The Contractor shall pay for all related license renewal fees and charges, warranty, maintaining functionality of operations for all software provided throughout the contract period. |
KERJA PEMBAIKAN KEROSAKAN
DI BANGUNAN SULAIMAN, KL A/19 Adendum bil.1 bertarikh22/11/2024 - 10:40 AM
APPENDIX A/3
LIST OF S.O.'S TRANSPORT SERVICES
BIL | ITEM | QUANTITY |
TIDAK BERKENAAN |
APPENDIX A/4
LIST OF LABORATORY EQUIPMENT
BIL | ITEM | QUANTITY | |
TIDAK BERKENAAN | |||
APPENDIX A/5
REQUIREMENTS OF SAFETY AND HEALTH PLAN (S-PLAN)
1. |
2. |
3. |
4. |
5. |
6. |
7. |
8. |
9. |
10. |
11. |
12. |
13. |
14. |
Project Introductions. Management Responsibility. OSH Programme.
Hazard Identification, Risk Assessment and Determining Control (HIRADC). Safety and Health Control Form 6. Permit to Work (PTW).
Fire Precaution and Protection and Emergency Respond. Safety Operation Procedure.
Investigation and Incident Report.
Occupational Safety and Health Statistics and Record. Employee Health Examination.
Safety, Health and Welfare.
List of Machines, Equipment and Plant. Traffic Control at Construction Site.
Personnel Protective Equipment (PPE).
Whenever there is any dispute arise, item listed as per Prosedur Kawalan Keselamatan dan Kesihatan Pekerjaan XXX.XX(O).04B (Format Pelan Keselamatan dan Kesihatan Pekerjaan, S- PLAN) under the latest version of Sistem Pengurusan Bersepadu (SPB), JKR shall be referred.
APPENDIX A/6
REQUIREMENTS OF SAFETY AND HEALTH REPORT
1. Introductions.
2. OSH Programme.
3. OSH Statistics and Record.
4. OSH Complaints and Notices.
5. Status of S-Plan.
6. Status of HIRADC.
7. Employee and Worker's Registrations.
8. Registration of Machineries, Equipment and Plants.
9. Traffic and safety controls.
10. Occupational Safety and Health Committee.
Whenever there is any dispute arises, item listed as per Prosedur Kawalan Keselamatan dan Kesihatan Pekerjaan XXX.XX(O).04B (Format Laporan Keselamatan Dan Kesihatan Pekerjaan), under the latest version of Sistem Pengurusan Bersepadu (SPB), JKR shall be referred.
SD200824 APPENDIX A/7 |
TABLE A2 : ENVIRONMENTAL QUALITY STANDARDS TO BE COMPLIED WITH BY THE CONTRACTOR |
Aspects | Parameter | JKR Minimum Requirement for Non-EIA Projects. | Environment Quality (Sewage) Regulations, 2009 | National Water Quality Standards (NWQS) | ||
Standard A | Standard B | Class IIA | Class IIB | |||
Soil | Soil loss | Minimum earthwork Phase construction ≤ 6 berms/benches for slopes (≤ 6m per berm) Reuse topsoil | ||||
Water 1,2 | Turbidity | ≤ 200 NTU | - | - | ≤ 50 NTU | |
Suspended Solid | ≤ 100 mg/l | ≤ 50 mg/l | ≤ 100 mg/l | ≤ 50 mg/l | ||
Biochemical Oxygen Demand 5 @ 20°C (BOD)5 | ≤ 50 mg/l | ≤ 20 mg/l | ≤ 50 mg/l | ≤ 3 mg/l | ||
Chemical Oxygen Demand (COD) | ≤ 100 mg/l | ≤ 120 mg/l | ≤ 200 mg/l | ≤ 25 mg/l | ||
pH | 5.5 - 9 | 6 - 9 | 5.5 - 9 | 6 - 9 | ||
E-Coli | ≤ 400 counts / 100 ml | - | - | ≤ 100 counts/ 100ml | ≤ 400 counts/ 100ml | |
Dissolved Oxygen (DO) | ≥ 4 mg/l | - | - | 5 - 7 mg/l | ||
Oil and Grease | ≤ 10 mg/l | ≤ 5 mg/l | ≤ 10 mg/l | ≤ 40 µg/l, N | ||
Ammoniacal Nitrogen (river) | - | ≤ 10 mg/l | ≤ 20 mg/l | ≤ 0.3 mg/l | ||
Silt trap and sediment basin discharge | Turbidity | ≤ 250 NTU | ||||
Total Suspended Solid | ≤ 50 mg/l |
APPENDIX A/7 |
TABLE A2 : ENVIRONMENTAL QUALITY STANDARDS TO BE COMPLIED WITH BY THE CONTRACTOR [Cont'd] |
Air 3 | Particulate Matter (PM10) (24hr) | ≤ 120 µg/m3/day |
Particulate Matter (PM2.5) (24hr) | ≤ 50 µg/m3/day | |
Noise 4 | Equivalent Noise Level (Leq), L10, L90 | Receiving Land Use (residential) |
Day time (7.00 am - 7.00 pm) | ||
L90 60 dBA; L10 ≤ 75 dBA; Lmax ≤ 90 dBA | ||
Evening time (7.00 pm - 10.00 pm) | ||
L90 ≤ 55 dBA; L10 ≤ 70 dBA; Lmax ≤ 85 dBA | ||
Night time (10.00 pm - 7.00 am) | ||
Noise Sensitive Areas : LAeq≤ 40 dBA | ||
Suburban Areas : LAeq≤ 45 dBA | ||
Urban Areas : LAeq ≤ 50 dBA | ||
Vibration 5 | Vertical Vibration Peak Velocity (mm/s) | Not more than 3 mm/s at receiver location or |
across real property boundary |
Reference: |
1) 2nd Schedule (regulation 7), Environmental Quality (Sewage) Regulations 2009, Environmental Quality Act 1974. |
(i) Standard A: For location with downstream water intake |
(ii) Standard B: For location with no downstream water intake |
2) National Water Quality Standards for Malaysia |
(i) Class IIA: Water Supply II - conventional treatment required |
a) Fishery II - sensitive aquatic species |
(ii) Class IIB: Recreational use with body contact |
3) Recommended Malaysian Guidelines on Ambient Air Quality |
4) Schedule 1 & Schedule 6, Planning Guidelines for Environmental Noise Limits & Control, )(DOE, 2004) |
5) Planning Guidelines for Vibration Limits and Control of the Environment (DOE, 2004) |
Note: N - No visible floatable materials or debris or no objectionable odour, or no objectionable taste. |
For EIA Projects, all requirements should comply with Conditions of Approval (CoA) stipulated by DOE or other relevant authorities. |
JABATAN KERJA RAYA MALAYSIA |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR. |
SEKSYEN II |
SENARAI KUANTITI |
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL) |
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G H | DEMOLITION WORKS | ||||
GENERAL NOTES: | |||||
Demolition works generally shall be carried out in such manner that there will be a minimum of inconvenience to adjoining owners or the public. The safety of the adjoining buildings and the public shall be of paramount importance during the execution of the demolition works and all necessary precaution shall be taken. The Contractor will be held responsible and is to indemnify the building owner for any claim or series of claims which may arise out of the demolition works. | NOTE | ||||
The Contractor shall examine the drawings, visit the site, inspect the existing premises and satisfy himself as to the nature and extent of the works to be demolish and also the working conditions to be encountered. No claims for extra payment in this respect will be entertained. | NOTE | ||||
The Contractor shall ascertain for himself the actual quantities required including the wastages and etc. | NOTE | ||||
The Contractor shall allow for protection and temporary supports of all works which may be affected by the repair works. | NOTE | ||||
The Contractor shall be required to repair or replace at his own expenses any parts or complete items which in the opinion of the S.O. have been damaged as a result of insufficient care of removing, handling and protecting. | NOTE | ||||
All prices for demolish or repair works shall be inclusive of making good surrounding and any works disturbed and carefully removing and carting away all debris off site. | NOTE | ||||
All works shall be strictly in compliance to Specifications provided and/or product manufacturers instruction and to the approval of the S.O. | NOTE | ||||
Rates to include supply all the necessary labours, materials, tools, safety measures, temporary access and supervision to rectify defects. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/1
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G | DEMOLITION WORKS | ||||
Any item not indicated in the Summary of Tender but is shown in the Tender Drawing is deemed to be included in the Bills of Quantities. | NOTE | ||||
The contractor shall before commencement of any works regarding relocation works, propose to the S.O a method statement for work to be done. The work can only be proceed subject to the approval of the method statement by the S.O. | NOTE | ||||
The contractor shall, all passages shall be fully enclosed, clean and totally free from dust, dirt, debris and the like at all times during the construction process and to the reasonable satisfaction of the S.O | NOTE | ||||
The Contractor shall allow for protection and supports of all works which may be affected by the demolition works. | NOTE | ||||
CONDITION SURVEY AND DISCONNECTION OF SERVICES | |||||
Before removal works is carried out, the contractor is required to carry out a comprehensive condition survey of all mechanical and electrical services within the work area and terminate such services as directed by the S.O. and or as shown on their respective drawings. The contractor shall also arrange mechanical and electrical services to be, which come to be removed, to be disconnected and diverted so that they may be entirely self-contained within any portion of the premises which is to remain. | NOTE | ||||
REMOVE OF DEBRIS OR RUBBISH | |||||
All debris arising from demolition, renovation, and upgrading works, as well as the works themselves, shall be placed in appropriate waste bags and removed from the site daily, using RORO containers approved by local authorities. | NOTE | ||||
The rubbish is to be sprinkled with water to prevent dust arising and all proper screens and protection provided to the satisfaction os S.O. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/2
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G | DEMOLITION WORKS | ||||
The debris/rubbish can only be removed after the official working hours or after 6.00 pm or depending S.O's instruction. | NOTE | ||||
All waste bags must be removed from the respective floors direct to the truck or mobile rubbish container. | NOTE | ||||
Accumulation of debris or rubbish within or outside the building premises is nor permitted. | NOTE | ||||
No debris of whatsoever form shall be thrown down from the respective floors but carefully brought down and loaded direct to the trucks mobile rubbish container immediately. | NOTE | ||||
All debris and the like shall be cut or reduced to managable sizes before loading into lift cars and to prevent damages to existing works. | NOTE | ||||
REINSTATEMENT | |||||
All pulling down as hereafter described is to be carried out without damage to the remaining parts of the structure / works adjoing property. If damage occurs in the carrying out of the demolition the contractor shall reinstate and make good at his own expense. All making out and making good is to be executed with materials and workmanship to match in every respect the surronding work and is to be properly bonden to it. | NOTE | ||||
MATERIAL FROM DEMOLITION/REPAIRING WORKS | |||||
All material arising from the demolition are to remain the property of the contractor and is to be carted away from the site and the contractor is to make due allowance in his tender for the value of any sound materials so acquired or residual scarp value arising. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/3
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | DEMOLITION WORKS | ||||
OVERLOAD EXISTING STRUCTURE | |||||
The contractor shall, all materials arising from the demolition must not be stacked or allowed to accumulate on existing structures in such away as to endanger their stability. The demolition contractor will held entirely responsible for the damage arising from the cause. | NOTE | ||||
SEQUENCE OF REMOVAL WORKS | |||||
The Contractor is to take note that he shall not assume that the whole works can be carried out in one continous operation but subject to the approval of the S.O. Allow herein for carrying out works in parts or in sections as may be directed by the S.O. from time to time and for any disruptions therein in the flow of the works throughout. | NOTE | ||||
APPROVAL OF METHOD STATEMENT PRIOR TO EXECUTION OF WORKS | |||||
Before any removal works commence, the Contractor is required to submit his method statement of how the works to be executed for approval by the S.O. | NOTE | ||||
PROTECTION WORKS | |||||
Allow for an adequate temporary protection to non disturbed be provided to existing materials, services area and other related area and new material which has been installed on site with approved materials by the S.O. (designated for construction use) including removal upon completion to its original condition at the point of official take over. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/4
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C | DEMOLITION WORKS | ||||
DEMOLITION OF BANGUNAN SULAIMAN | |||||
(ALL QUANTITIES ARE PROVISIONAL) | |||||
The work in this section comprises the demolish, remove, scrapping and cleaning work. | |||||
Information : | |||||
The contractor is required to visit the site to make a quantity measurement again to get the actual size and measurements etc. to be demolished and replaced with new works etc. | NOTE | ||||
All demolition or upgrading works in this BQ shall be read together with Laporan Pemeriksaan Kerosakan Arkitek as per attached in Section III (Spesifikasi Dan Pengukuran Dan Faktor Menghargakan Senarai Kuantiti), Part A (i) Laporan & Terma Rujukan. | NOTE | ||||
CLEANING OR REMOVING DIRT ON THE SURFACE OF THE EXISTING FLAT ROOF | |||||
Cleaning or removing dirt on the surface of the existing flat roof; make good affected structure and finishes including temporary works related in accordance with the method statement provided by registered conservators; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing No. JKR/CA/14/10/101/W24/018/BS/P/02 | |||||
Tepi Tangga Lift (approximate area 92m2) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/5
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C | DEMOLITION WORKS | ||||
DEMOLISH EXISTING WINDOW | |||||
Demolish the existing window, frame, and all accessories, along with any other necessary associated works, including temporary works. Make good any defects resulting from the disturbance caused by the removal of the window. The contractor must also propose and carry out the repair works in accordance with the method statement provided by registered conservators, cart away debris to the contractor's own dump, and prepare the surface to receive new finishes/works as instructed by the S.O. as shown in the drawing no. JKR/CA/14/10/101/W24/018/BS/J/01. | |||||
Lobi Lift 1 (approximate quantity 3 nos) | ITEM | ||||
REMOVE EXISTING SILICON RUBBER | |||||
Demolish/Remove the existing Silicon Rubber around the window glass panel and other necessary associated works including temporary works related in accordance with the method statement provided by registered conservators; making good any defects to work disturbed; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing no. JKR/CA/14/10/101/W24/018/BS/R/01. | |||||
Tingkap di Lift Lobi Belakang (approximate quantity 174m) | ITEM | ||||
DEMOLISH/REMOVE EXISTING LOUVERS | |||||
Demolish/Remove existing louvers, frame, all accesories and other necessary associated works including temporary works related in accordance with the method statement provided by registered conservators; making good any defects to work disturbed; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing. | |||||
Menara 1 (approximate quantity 4 nos louvers; size 1200mm x 1200mm) (JKR/CA/14/10/101/W24/018/BS/W/01) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/6
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G | DEMOLITION WORKS | ||||
Menara 2 & 3 (approximate quantity 8 nos | |||||
louvers; size 1200mm x 1500mm) (JKR/CA/14/10/101/W24/018/BS/Y/01) | ITEM | ||||
Fasad Tengah (approximate quantity 14 nos | |||||
louvers) (JKR/CA/14/10/101/W24/018/BS/X/01) | ITEM | ||||
Menara 4, 5 & 6 (approximate quantity 9 nos | |||||
louvers; size 1200mm x 1500mm) (JKR/CA/14/10/101/W24/018/BS/V/01) | ITEM | ||||
DEMOLISH EXISTING DOOR | |||||
Demolish the existing door, frame, all accesories | |||||
and other necessary associated works including | |||||
temporary works related in accordance with the | |||||
method statement provided by registered | |||||
conservators; making good any defects to work | |||||
disturbed; cart away debris to contractor's own | |||||
dump and prepare surface to receive new | |||||
finishes/works as instructed by the S.O as shown | |||||
in the drawing no. | |||||
JKR/CA/14/10/101/W24/018/BS/T/01. | |||||
Pejabat AIAC (approximate quantity 1 nos) | ITEM | ||||
DEMOLISH/REMOVE EXISTING FLOOR | |||||
FINISHES | |||||
Demolish/Remove all types of floor finishes, | |||||
including screeding or underlay and all other | |||||
necessary associated works including temporary | |||||
works related in accordance with the method | |||||
statement provided by registered conservators; | |||||
make good any defects to work disturbed; cart | |||||
away debris to contractor's own dump and | |||||
prepare surface to receive new finishes/works as | |||||
instructed by the S.O as shown in the drawing. | |||||
Tangga Tepi (Bilik Pam) (approximate area | |||||
40m2). (JKR/CA/14/10/101/W24/018/BS/E/01) | ITEM | ||||
Drop Off Porch (approximate area 60m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/I/01) | ITEM | ||||
Tandas Lelaki Tengah (approximate area 25m2) (JKR/CA/14/10/101/W24/018/BS/O/01) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/7
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F | DEMOLITION WORKS | ||||
RESURFACING OF EXISTING FLOOR | |||||
FINISHES | |||||
Demolish the existing cement render flooring until | |||||
to the waterproof layer and all other necessary | |||||
associated works including temporary works | |||||
related in accordance with the method statement | |||||
provided by registered conservators; make good | |||||
any defects to work disturbed; cart away debris to | |||||
contractor's own dump and prepare surface to | |||||
receive new finishes/works as instructed by the | |||||
S.O as shown in the drawing No. | |||||
JKR/CA/14/10/101/W24/018/BS/M/01 | |||||
Rumah Pam Chiller (approximate area 54m2) | ITEM | ||||
DEMOLISH EXISTING CEILING FINISHES | |||||
Demolish all types of ceiling finishes, including | |||||
framing and temporary works related in | |||||
accordance with the method statement provided | |||||
by registered conservators. Make good any | |||||
affected structure and finishes, cart away debris | |||||
to the contractor's own dump, and prepare the | |||||
surface to receive new finishes/works as | |||||
instructed by the S.O and as shown in the | |||||
drawing. | |||||
Control Room Regent Auditorium | |||||
(approximate area 40m2) (JKR/CA/14/10/101/W24/018/BS/Q/01) | ITEM | ||||
Tandas lelaki & perempuan (approximate area | |||||
50m2) (JKR/CA/14/10/101/W24/018/BS/U/01) | ITEM | ||||
Luar Kafeteria (Near Pool) (approximate area | |||||
80m2) (JKR/CA/14/10/101/W24/018/BS/G/01) | ITEM | ||||
Tandas OKU (approximate area 5m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/L/01) | ITEM | ||||
Bilik Kompresor (approximate area 41m2) (JKR/CA/14/10/101/W24/018/BS/N/01) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/8
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | DEMOLITION WORKS | ||||
Tepi Tangga Lift (approximate area 90m2) (JKR/CA/14/10/101/W24/018/BS/P/01) | ITEM | ||||
Menara 4, 5 & 6 (approximate area 139m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/V/01) | ITEM | ||||
SCRAPE OFF EXISTING CEILING FINISHES | |||||
Scrape off loose paint, clean the structure and all | |||||
other necessary associated works including | |||||
temporary works related in accordance with the | |||||
method statement provided by registered | |||||
conservators; make good affected structure and | |||||
finishes; cart away debris to contractor's own | |||||
dump and prepare surface to receive new | |||||
finishes/works as instructed by the S.O as shown | |||||
in the drawing No. | |||||
JKR/CA/14/10/101/W24/018/BS/S/01 | |||||
Siling Ruang Pejabat (approximate area 480m2) | ITEM | ||||
DEMOLISH EXISTING CEILING FINISHES (All | |||||
Spaces Involved In The Conversion Of Fire | |||||
Protection System And Electrical Works) | |||||
Demolish all types of ceiling finishes including | |||||
framing; make good affected structure and | |||||
finishes including temporary works related in | |||||
accordance with the method statement provided | |||||
by registered conservators; cart away debris to | |||||
contractor's own dump and prepare surface to | |||||
receive new finishes/works as instructed by the | |||||
S.O as shown in the drawing. | |||||
All Spaces Involved In The Conversion Of Fire | |||||
Protection System And Electrical Works | |||||
(approximate area 4830m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/H/01), | |||||
(JKR/CA/14/10/101/W24/018/BS/H/03), (JKR/CA/14/10/101/W24/018/BS/H/05), | ITEM | ||||
(JKR/CA/14/10/101/W24/018/BS/H/07) and | |||||
(JKR/CA/14/10/101/W24/018/BS/H/09) | |||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/9
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B | DEMOLITION WORKS | ||||
DEMOLISH EXISTING BOXED-UP RAIN WATER DOWN PIPE (RWDP) | |||||
Demolish the existing boxed-up and rain water down pipe connection system; make good affected structure and finishes including temporary works related related in accordance with the method statement provided by registered conservators; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing No. JKR/CA/14/10/101/W24/018/BS/B/01 | |||||
Dinding & Tiang Grid E2/ES sehingga E2/EC (approximate 14nos. ; size each boxed-up 1000mm x 400mm x 300mm(H)) | ITEM | ||||
Demolish the existing boxed-up structure; make good any disturbed structures and finishes, including temporary works related in accordance with the method statement provided by registered conservators; cart away debris to the contractor's own dump, and prepare the surface to receive new finishes/works as instructed by the S.O. and as shown in the drawing No.(JKR/CA/14/10/101/W24/018/BS/F/01 | |||||
Koridor Luar (Kitchen) (approximate 1nos.) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/10
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G H J | DEMOLITION WORKS | ||||
SCRAPE OFF EXISTING WALL FINISHES | |||||
Scrape off loose paint, clean the structrure and all | |||||
other necessary associated works including | |||||
temporary works related in accordance with the | |||||
method statement provided by registered | |||||
conservators; make good affected structure and | |||||
finishes; cart away debris to contractor's own | |||||
dump and prepare surface to receive new | |||||
finishes/works as instructed by the S.O as shown | |||||
in the drawing. | |||||
Private Dining Room (approximate area 327m2) (JKR/CA/14/10/101/W24/018/BS/C/01) | ITEM | ||||
Dinding & Tiang Grid E2/ES Sehingga E2/EC | |||||
(approximate area 448m2) (JKR/CA/14/10/101/W24/018/BS/A/01) | ITEM | ||||
Dinding Tangga 3 (approximate area 69m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/D/01) | ITEM | ||||
Lobi Lift 1 (approximate area 220m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/K/01) | ITEM | ||||
Menara 1 (approximate area 130m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/W/01) | ITEM | ||||
Fasad Tengah (approximate area 60m2) (JKR/CA/14/10/101/W24/018/BS/X/01) | ITEM | ||||
Menara 2 & 3 (approximate area 180m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/Y/01) | ITEM | ||||
Menara 4, 5 & 6 (approximate area 264m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/V/01) | ITEM | ||||
Fasad Bahagian Dalam & Luar termasuk Dinding | |||||
Sepanjang Koridor Fasad Hadapan, Belakang, | |||||
Kanan & Kiri (approximate area 9626m2) | |||||
(JKR/CA/14/10/101/W24/018/BS/Z/01), (JKR/CA/14/10/101/W24/018/BS/Z/03), | ITEM | ||||
(JKR/CA/14/10/101/W24/018/BS/Z/05) & | |||||
(JKR/CA/14/10/101/W24/018/BS/Z/07) | |||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B1/1/11
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
DEMOLITION WORKS COLLECTION FROM PAGE NO. B1/1/1 FROM PAGE NO. B1/1/2 FROM PAGE NO. B1/1/3 FROM PAGE NO. B1/1/4 FROM PAGE NO. B1/1/5 FROM PAGE NO. B1/1/6 FROM PAGE NO. B1/1/7 FROM PAGE NO. B1/1/8 FROM PAGE NO. B1/1/9 FROM PAGE NO. B1/1/10 FROM PAGE NO. B1/1/11 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
B1/1/12
BILL NO. B1- BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | From Page No. | Amount (RM) |
1 | SUMMARY DEMOLITION WORKS | B1/1/12 | |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Ringkasan Tender : |
B1/SUM/1
JABATAN KERJA RAYA MALAYSIA |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR. |
SEKSYEN II |
SENARAI KUANTITI |
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL) |
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G H | DEMOLITION WORKS | ||||
GENERAL | |||||
Demolition works generally shall be carried out in such manner that there will be a minimum of inconvenience to adjoining owners or the public. The safety of the adjoining buildings and the public shall be of paramount importance during the execution of the demolition works and all necessary precaution shall be taken. The Contractor will be held responsible and is to indemnify the building owner for any claim or series of claims which may arise out of the demolition works. | NOTE | ||||
The Contractor shall examine the drawings, visit the site, inspect the existing premises and satisfy himself as to the nature and extent of the works to be demolish and also the working conditions to be encountered. No claims for extra payment in this respect will be entertained. | NOTE | ||||
The Contractor shall ascertain for himself the actual quantities required including the wastages and etc. | NOTE | ||||
The Contractor shall allow for protection and temporary supports of all works which may be affected by the repair works. | NOTE | ||||
The Contractor shall be required to repair or replace at his own expenses any parts or complete items which in the opinion of the S.O. have been damaged as a result of insufficient care of removing, handling and protecting. | NOTE | ||||
All prices for demolish or repair works shall be inclusive of making good surrounding and any works disturbed and carefully removing and carting away all debris off site. | NOTE | ||||
All works shall be strictly in compliance to Specifications provided and/or product manufacturers instruction and to the approval of the S.O. | NOTE | ||||
Rates to include supply all the necessary labours, materials, tools, safety measures, temporary access and supervision to rectify defects. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/1
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G | DEMOLITION WORKS | ||||
Any item not indicated in the Summary of Tender but is shown in the Tender Drawing is deemed to be included in the Bills of Quantities. | NOTE | ||||
The contractor shall before commencement of any works regarding relocation works, propose to the S.O a method statement for work to be done. The work can only be proceed subject to the approval of the method statement by the S.O. | NOTE | ||||
The contractor shall, all passages shall be fully enclosed, clean and totally free from dust, dirt, debris and the like at all times during the construction process and to the reasonable satisfaction of the S.O | NOTE | ||||
The Contractor shall allow for protection and supports of all works which may be affected by the demolition works. | NOTE | ||||
CONDITION SURVEY AND DISCONNECTION OF SERVICES | |||||
Before removal works is carried out, the contractor is required to carry out a comprehensive condition survey of all mechanical and electrical services within the work area and terminate such services as directed by the S.O. and or as shown on their respective drawings. The contractor shall also arrange mechanical and electrical services to be, which come to be removed, to be disconnected and diverted so that they may be entirely self-contained within any portion of the premises which is to remain. | NOTE | ||||
REMOVE OF DEBRIS OR RUBBISH | |||||
All debris arising from demolition, renovation, and upgrading works, as well as the works themselves, shall be placed in appropriate waste bags and removed from the site daily, using RORO containers approved by local utilities. | NOTE | ||||
The rubbish is to be sprinkled with water to prevent dust arising and all proper screens and protection provided to the satisfaction os S.O. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/2
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G | DEMOLITION WORKS | ||||
The debris/rubbish can only be removed after the official working hours or after 6.00 pm or depending S.O's instruction. | NOTE | ||||
All waste bags must be removed from the respective floors direct to the truck or mobile rubbish container. | NOTE | ||||
Accumulation of debris or rubbish within or outside the building premises is nor permitted. | NOTE | ||||
No debris of whatsoever form shall be thrown down from the respective floors but carefully brought down and loaded direct to the trucks mobile rubbish container immediately. | NOTE | ||||
All debris and the like shall be cut or reduced to managable sizes before loading into lift cars and to prevent damages to existing works. | NOTE | ||||
REINSTATEMENT | |||||
All pulling down as hereafter described is to be carried out without damage to the remaining parts of the structure / works adjoing property. If damage occurs in the carrying out of the demolition the contractor shall reinstate and make good at his own expense. All making out and making good is to be executed with materials and workmanship to match in every respect the surronding work and is to be properly bonden to it. | NOTE | ||||
MATERIAL FROM DEMOLITION/REPAIRING WORKS | |||||
All material arising from the demolition are to remain the property of the contractor and is to be carted away from the site and the contractor is to make due allowance in his tender for the value of any sound materials so acquired or residual scarp value arising. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/3
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | DEMOLITION WORKS | ||||
OVERLOAD EXISTING STRUCTURE | |||||
The contractor shall, all materials arising from the demolition must not be stacked or allowed to accumulate on existing structures in such away as to endanger their stability. The demolition contractor will held entirely responsible for the damage arising from the cause. | NOTE | ||||
SEQUENCE OF REMOVAL WORKS | |||||
The Contractor is to take note that he shall not assume that the whole works can be carried out in one continous operation but subject to the approval of the S.O. Allow herein for carrying out works in parts or in sections as may be directed by the S.O. from time to time and for any disruptions therein in the flow of the works throughout. | NOTE | ||||
APPROVAL OF METHOD STATEMENT PRIOR TO EXECUTION OF WORKS | |||||
Before any removal works commence, the Contractor is required to submit his method statement of how the works to be executed for approval by the S.O. | NOTE | ||||
PROTECTION WORKS | |||||
Allow for an adequate temporary protection to non disturbed be provided to existing materials, services area and other related area and new material which has been installed on site with approved materials by the S.O. (designated for construction use) including removal upon completion to its original condition at the point of official take over. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/4
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C | DEMOLITION WORKS | ||||
DEMOLITION OF BANGUNAN PAVILLION | |||||
(ALL QUANTITIES ARE PROVISIONAL) | |||||
The work in this section comprises the demolish, remove, scrapping and cleaning work. | |||||
Information : | |||||
The contractor is required to visit the site to make a quantity measurement again to get the actual size and measurements etc. to be demolished and replaced with new works etc. | NOTE | ||||
All demolition or upgrading works in this BQ shall be read together with Laporan Pemeriksaan Kerosakan Arkitek as per attached in Section III (Spesifikasi Dan Pengukuran Dan Faktor Menghargakan Senarai Kuantiti), Part A (i) Laporan & Terma Rujukan. | NOTE | ||||
CLEANING OR REMOVING DIRT ON THE SURFACE OF THE EXISTING GLASS CANOPY | |||||
Cleaning or removing dirt on the surface of the existing glass canopy; make good affected structure and finishes including temporary works related in accordance with the method statement provided by registered conservators; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing No. JKR/CA/14/10/101/W24/018/P/F/01 | |||||
Glass canopy (approximate area 272m2) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/5
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C | DEMOLITION WORKS | ||||
DEMOLISH/REMOVE EXISTING SILICON RUBBER | |||||
Demolish/Remove the existing Silicon Rubber around the glass canopy and other necessary associated works related; make good affected structure and finishes including temporary works related in accordance with the method statement provided by registered conservators; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing no. JKR/CA/14/10/101/W24/018/P/F/01. | |||||
Glass canopy (approximate area 272m2) | ITEM | ||||
DEMOLISH/REMOVE EXISTING METAL DECK ROOF | |||||
Demolition of roof finishes, ceiling, gutters, and rainwater downpipes (RWDP) on existing covered parking, along with all other necessary associated works including temporary works in accordance with the method statement provided by registered conservators. cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing No. | |||||
Metal Deck Roof at Covered Parking (approximate area 530m2) (JKR/CA/14/10/101/W24/018/P/J/01-14) | ITEM | ||||
DEMOLISH EXISTING DOOR | |||||
Demolish the existing door, frame, all accesories and other necessary associated works; make good affected structure and finishes including temporary works related in accordance with the method statement provided by registered conservators; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing No. JKR/CA/14/10/101/W24/018/P/KL/01 | |||||
Bilik Stor (approximate quantity 1 nos) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/6
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | DEMOLITION WORKS | ||||
DEMOLISH/REMOVE EXISTING FLOOR FINISHES | |||||
Demolish/Remove all types of floor finishes, including screeding or underlay and all other necessary associated works; make good affected structure and finishes including temporary works related in accordance with the method statement provided by registered conservators; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing No. | |||||
Sapphire Room 1&2 (approximate area 260m2) (JKR/CA/14/10/101/W24/018/P/GHI/01) | ITEM | ||||
Bilik Stor (approximate area 33m2) (JKR/CA/14/10/101/W24/018/P/KL/01) | ITEM | ||||
SCRAPE OFF EXISTING EXTERNAL CEILING FINISHES | |||||
Scrape off loose paint, clean the structure and all other necessary associated works including temporary works related in accordance with the method statement provided by registered conservators; make good affected structure and finishes; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing No. JKR/CA/14/10/101/W24/018/P/ABC/01 | |||||
Soffit Slab at Carpark (approximate area 2910m2) | ITEM | ||||
Beam Slab at Carpark (approximate area 208m2) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/7
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C | DEMOLITION WORKS | ||||
DEMOLISH EXISTING INTERNAL CEILING FINISHES | |||||
Demolish all types of ceiling finishes, including framing and related temporary works, in accordance with the method statement provided by registered conservators. Inspect the cause of the watermark and determine whether it is due to a roof leak or a water pipe/roof water tank issue that needs to be repaired first; make good affected structure and finishes; cart away debris to contractor's own dump and prepare surface to receive new finishes/works as instructed by the S.O as shown in the drawing. | |||||
Sapphire Room 1&2 (approximate area 260m2) (JKR/CA/14/10/101/W24/018/P/GHI/05-06) | ITEM | ||||
Pre Function Area (approximate area 65m2) (JKR/CA/14/10/101/W24/018/P/GHI/05-06) | ITEM | ||||
Bilik Stor (approximate area 33m2) (JKR/CA/14/10/101/W24/018/P/P/KL/01-07) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/8
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F | DEMOLITION WORKS | ||||
SCRAPE OFF EXISTING EXTERNAL WALL | |||||
FINISHES | |||||
Scrape off loose paint, clean the structure and all | |||||
other necessary associated works including | |||||
temporary works related in accordance with the | |||||
method statement provided by registered | |||||
conservators; make good affected structure and | |||||
finishes; cart away debris to contractor's own | |||||
dump and prepare surface to receive new | |||||
finishes/works as instructed by the S.O as shown | |||||
in the drawing No. | |||||
Fasad Bahagian Dalam & Luar termasuk Dinding | |||||
Sepanjang Koridor Fasad Hadapan, Belakang, Kanan & Kiri (approximate area 2500m2) | ITEM | ||||
(JKR/CA/14/10/101/W24/018/P/08/01-03) | |||||
Tangga Aras Bawah Bawah (ST-1 & ST-2) | |||||
(approximate area 23m2) (JKR/CA/14/10/101/W24/018/P/DE/01) | ITEM | ||||
Dinding Tangga CP-ST-1 & CP-ST-2 | |||||
(approximate 32 area m2) (JKR/CA/14/10/101/W24/018/P/DE/01) | ITEM | ||||
Tiang di Tempat Letak Kereta (approximate area | |||||
389 m2) (JKR/CA/14/10/101/W24/018/P/ABC/01) | ITEM | ||||
SCRAPE OFF EXISTING INTERNAL WALL | |||||
FINISHES | |||||
Remove all types of internal wall finishings, | |||||
including non-structural wall framing, Scrape off | |||||
loose paint, clean the structure and all other | |||||
necessary associated works including temporary | |||||
works related in accordance with the method | |||||
statement provided by registered conservators; | |||||
make good affected structure and finishes; cart | |||||
away debris to contractor's own dump and | |||||
prepare surface to receive new finishes/works as | |||||
instructed by the S.O as shown in the drawing No. | |||||
Sapphire Room 1&2 (approximate area 436m2) | |||||
(JKR/CA/14/10/101/W24/018/P/GHI/03-04) | ITEM | ||||
Bilik Stor (approximate area 100m2) (JKR/CA/14/10/101/W24/018/P/KL/01-07) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/9
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | DEMOLITION WORKS | ||||
DEMOLISH EXISTING RAIN WATER DOWN | |||||
PIPE (RWDP) | |||||
Demolish existing RWDP; make good affected | |||||
structure and finishes including temporary works | |||||
related in accordance with the method statement | |||||
provided by registered conservators; cart away | |||||
debris to contractor's own dump and prepare | |||||
surface to receive new finishes/works as | |||||
instructed by the S.O as shown in the drawing No. | |||||
Carpark ground floor (Coloum A7) | |||||
(JKR/CA/14/10/101/W24/018/P/ABC/01-02) | ITEM | ||||
Tiang berhampiran Tangga (JKR/CA/14/10/101/W24/018/P/DE/01) | ITEM | ||||
SCRAPE OFF EXISTING EXTERNAL FENCING | |||||
FINISHES | |||||
Scrape off loose paint, clean the structure and all | |||||
other necessary associated works including | |||||
temporary works related in accordance with the | |||||
method statement provided by registered | |||||
conservators; make good affected structure and | |||||
finishes; cart away debris to contractor's own | |||||
dump and prepare surface to receive new | |||||
finishes/works as instructed by the S.O as shown | |||||
in the drawing No. | |||||
Fencing at Garden (approximate length 155m) | ITEM | ||||
(JKR/CA/14/10/101/W24/018/P/NO/01-03) | |||||
DISMANTLE EXISTING CABINET FROM SITE | |||||
Dismantle and remove from site all existing high | |||||
cabinet as shown in the drawing no | |||||
(JKR/CA/14/10/101/W24/018/P/GHI/01), | |||||
(JKR/CA/14/10/101/W24/018/P/GHI/03) & | |||||
(JKR/CA/14/10/101/W24/018/P/GHI/05) | |||||
Sapphire room 1 (size 12.9M x 1.0M x 4.9M (H)) | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
B2/1/10
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
Item | Description | Amount (RM) |
DEMOLITION WORKS COLLECTION FROM PAGE NO. B2/1/1 FROM PAGE NO. B2/1/2 FROM PAGE NO. B2/1/3 FROM PAGE NO. B2/1/4 FROM PAGE NO. B2/1/5 FROM PAGE NO. B2/1/6 FROM PAGE NO. B2/1/7 FROM PAGE NO. B2/1/8 FROM PAGE NO. B2/1/9 FROM PAGE NO. B2/1/10 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
B2/1/11
BILL NO. B2- BANGUNAN PAVILION (ALL PROVISIONAL)
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL
B2/SUM/1
To Ringkasan Tender :
Item | Description | From Page No. | Amount (RM) |
1 | SUMMARY DEMOLITION WORKS | B2/1/11 | |
JABATAN KERJA RAYA MALAYSIA |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR. |
SEKSYEN II |
SENARAI KUANTITI |
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL) |
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | GENERAL NOTES FOR UPGRADING WORKS | ||||
GENERAL NOTE | |||||
Information : | |||||
The contractor is required to visit the site to take quantity measurement again to obtain the actual sizes and dimensions to be demolished and replaced with new works. | NOTE | ||||
Shop Drawings | |||||
The contractor needs to prepare, submit, and obtain approval for construction from the S.O.'s Representative for all shop/working drawings related to the Contract Works, as required by the relevant Specifications in the Contract. Detailed final drawings must be prepared, calculated, and approved before installation. | NOTE | ||||
Upgrading Works | |||||
The contractor must provide appropriate repair proposals and must obtain confirmation from a certified engineer/architect | NOTE | ||||
Registered Conservator Method Statement | |||||
The contractor must adhere to the method statement provided by the Registered Conservator and comply with the latest JKR Specification. | NOTE | ||||
Laporan Pemeriksaan Kerosakan Arkitek | |||||
All demolition or upgrading works in this BQ shall be read together with the Laporan Pemeriksaan Kerosakan Arkitek as attached in Section III (Spesifikasi Dan Pengukuran Dan Faktor Menghargakan Senarai Kuantiti), Part A (i) Laporan & Terma Rujukan. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/1/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
GENERAL NOTES FOR UPGRADING WORKS COLLECTION FROM PAGE NO. C1/1/1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/1/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B | STRUCTURAL AND NON-STRUCTURAL REPAIR WORKS | ||||
Notes: | |||||
This Bills is to read in conjunction with The Visual Condition Survey and Defect Mapping Report conducted by the Contractor based on TUB- 09/2024 - Seksyen II - Part D and related documents. All preliminaries in conjunction to works shall be identified and estimated. | |||||
The Contractor shall visit the site, inspect the existing premises and satisfy himself as to the nature and extent of the works and also the working conditions to be encountered. No claims for extra payment in this respect will be entertained. | |||||
All works shall be stricly in compliance to Specifications provided and/or product Manufacturer's Instruction (hereinafters referred "as specified") and to the approval of the Superintending Officer. (hereinafter referred as "the S.O."). | |||||
Rates to include supply all the necessary labours, materials, tools, safety measures, temporary access and supervision. | |||||
Rate to include identifying and marking the defective areas and making good of any damages; including reinstatement of finishes or repainting matching existing finishes to the satisfaction and approval of S.O. | |||||
STRUCTURAL REPAIR WORKS | |||||
To carry out structural crack repair works as per drawing no: JKR/CKAS/P/08/IP/19/02/01 | |||||
For cracks less than or equal to 0.3mm width | M | 50 | |||
For cracks ranging from 0.3mm to 3.0mm width | M | 100 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/2/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | STRUCTURAL AND NON-STRUCTURAL REPAIR WORKS | ||||
To carry out patch repair works by hand patching for areas less than or equal to 0.5 m2 and maximum depth of 30mm or half of main reinforcement bar diameter | |||||
Prepare concrete surface and reinforcement and to carry out repair works by applying patch repair mortar and testing as per drawing no: JKR/CKAS/P/08/IP/19/03/01 and Specification of Concrete Patch Repair JKR 00000-0000-00. | M2 | 100 | |||
NON STRUCTURAL REPAIR WORKS | |||||
Brickwall Crack Repair (Cracks Exceeds Plaster Finishes) | |||||
Prepare concrete surface and to carry out repair works as per drawing no: JKR/CKAS/P/08/17/03 and reinstate the existing finishes/plaster to the satisfaction of S.O. | |||||
For cracks less than 0.25mm width | M | 50 | |||
For cracks ranging from 0.25mm to 5.0mm width | M | 50 | |||
For cracks ranging from 0.25mm to 5.0mm width (Including through crack) | M | 50 | |||
Typical Column-Brickwall Interfacial Plaster Crack | |||||
Repair | |||||
To carry out crack repair as per drawing no: CPKA/FR/LP/KP/02 including removing approximately 40 mm width on each side of crack, installing one (1) layer of the galvanized wire mesh size SWG 14 (40mm) and replastering. | M | 100 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/2/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C | STRUCTURAL AND NON-STRUCTURAL REPAIR WORKS | ||||
Typical Beam-Brickwall Interfacial Plaster Crack Repair | |||||
To carry out crack repair as per drawing no: CKASJ.BFSJ.SRD/2010/1 including removing approximately 50 mm width on each side of crack, installing one (1) layer of the galvanized wire mesh size SWG 14 (80mm width) and replastering. | |||||
If gap width ≤ 0.5mm exists at beam-brickwall interface, inject epoxy into gap. | M | 100 | |||
If gap width > 0.5mm exists at beam-brickwall interface, pump pressure grout into gap. | M | 100 | |||
KERB (XXXX XXXXXX) | |||||
As per drawing no JKR/CKAS/15/01/W22/V28/BPH/BS/02[02] | |||||
Supply and install Vibrated Reinforced Concrete Class C32/40, with minimum cement content 300kg/m3 and with free water content between 160-180kg/m3 as specified | |||||
100mm width x 100mm high kerb (Aras Tangki Air) | M | 5 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/2/3
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
STRUCTURAL AND NON-STRUCTURAL REPAIR WORKS COLLECTION FROM PAGE NO. C1/2/1 FROM PAGE NO. C1/2/2 FROM PAGE NO. C1/2/3 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/2/4
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
WATERPROOFING WORKS Notes: This Bills is to read in conjunction with The Visual Condition Survey and Defect Mapping Report conducted by the Contractor based on TUB- 09/2024 and related documents. All preliminaries in conjunction to works shall be identified and estimated The Contractor shall visit the site, inspect the existing premises and satisfy himself as to the nature and extent of the works and also the working conditions to be encountered. No claims for extra payment in this respect will be entertained Rates to include supply all the necessary labours, materials, tools, safety measures, temporary access and supervision Rate to include identifying and marking the defective areas and making good of any damages; All voids, cracks and fillet edges, shall be repaired as per drawings and specifications and approved by the S.O.; to ensure the surface is sound, even and clean; including reinstatement of finishes or repainting matching existing finishes to the satisfaction and approval of S.O. To provide and remove transportation, plant, working platform, machinery and skill labour; and clearing all rubbish and foreign materials All works shall be stricly in compliance to Specifications provided and/or product Manufacturer's Instruction (hereinafters referred "as specified") and to the approval of the Superintending Officer. (hereinafter referred as "the S.O.") | |||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/3/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | WATERPROOFING WORKS SURFACE PREPARATION Remove all existing related equipment prior to the removal of existing waterproofing; set aside for re- fixing and make good all works disturbed Hack all existing waterproofing and screed, down to concrete slab surface; prepare surfaces of the existing concrete slab and scupper drain, cleaning by means of air blower, water jet and sweeping as described; cart away the unwanted material to Contractor's own dump STRUCTURAL REPAIR WORKS To carry out structural crack repair works as per drawing no: JKR/CKAS/P/08/IP/19/02/01 and Specification of Concrete Crack Repair JKR 00000-0000-00 For cracks less than or equal to 0.3mm width For cracks ranging from 0.3mm to 3.0mm width To carry out patch repair works by hand patching for areas less than or equal to 0.5 m2 and maximum depth of 30mm or half of main reinforcement bar diameter Prepare concrete surface and reinforcement and to carry out repair works by applying patch repair mortar and testing as per drawing no: JKR/CKAS/P/08/IP/19/03/01 and Specification of Concrete Patch Repair JKR 00000-0000-00. | SUM M2 M M M2 | 306 100 100 40 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/3/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | WATERPROOFING WORKS POLYUREA WATERPROOFING AT APRON To carry out waterproofing works as per drawing no: CKASJ.BFSJ.SRD/2012/07 Waterproofing system shall include ponding test and ten (10) years of performance warranty (material and workmanship warranty) from the manufacturer's effective from the date of expiry of Defect and Liability Period (DLP). To lay 25mm (min) thick cement screed with minimal compressive strength of 20MPa; laid to fall 1:100 towards the directions of gutters or to nearest drainage outlets and all in accordance to the manufacturer's written instructions and drawings approved by the S.O. The base screed shall be allowed to cure for 7 days prior to the waterproofing system application. Apply one (1) layer of epoxy resin base primer and two (2) layers of Polyurea waterproofing; coverage area at least 1.5kg/m2 per layer of Polyurea waterproofing; including to construct a cement screed angle fillet with lates & fibre mesh reinforces (35mm x 35mm ) at edge of wall and 300mm high upturn water proofing at skirting and drop/riser; and laid using appropriate tool and in strict accordance to the manufacturer's written instructions approved by the S.O's. i) Apron ii) Apron Skirting; up to 450 mm high To carry out Ponding Test on the waterproofing system | M2 M2 M2 SUM | 260 225 35 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/3/3
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | WATERPROOFING WORKS LIQUID APPLIED MEMBRANE (LAM) WATERPROOFING AT WATER TANK To carry out waterproofing works as per drawing no: JKR/CKAS/15/01/W22/V28/BPH/BS/02(02) Waterproofing system shall include ponding test and ten (10) years of performance warranty (material and workmanship warranty) from the manufacturer's effective from the date of expiry of Defect and Liability Period (DLP). To lay 25mm (min) thick cement screed with minimal compressive strength of 20MPa; laid to fall 1:100 towards the directions of gutters or to nearest drainage outlets and all in accordance to the manufacturer's written instructions and drawings approved by the S.O. The base screed shall be allowed to cure for 7 days prior to the waterproofing system application. Apply one (1) layer of epoxy resin base primer and two (2) layers of Liquid Applied Membrane with Antifracture Fabric; including to construct a cement screed angle fillet with lates & fibre mesh reinforces (35mm x 35mm ) at edge of wall and 300mm high upturn water proofing at skirting and drop/riser; and laid using appropriate tool and in strict accordance to the manufacturer's written instructions approved by the S.O's. i) Water Tank Slab ii) Water Tank Slab Skirting; up to 300 mm high To carry out Ponding Test on the waterproofing system POLYUREA WATERPROOFING WORKS FOR FLAT ROOF SURFACE PREPARATION Remove all existing related equipment prior to the removal of existing waterproofing; set aside for re- fixing and make good all works disturbed for: | M2 M2 M2 SUM SUM | 46 35 11 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/3/4
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | WATERPROOFING WORKS Hack all existing waterproofing and screed, down to concrete slab surface; prepare surfaces of the existing concrete slab and scupper drain, cleaning by means of air blower, water jet and sweeping as described; cart away the unwanted material to Contractor's own dump STRUCTURAL REPAIR WORKS To carry out structural crack repair works as per drawing no: JKR/CKAS/P/08/IP/19/02/01 and Specification of Concrete Crack Repair JKR 00000-0000-00 For cracks less than or equal to 0.3mm width For cracks ranging from 0.3mm to 3.0mm width To carry out patch repair works by hand patching for areas less than or equal to 0.5 m2 and maximum depth of 30mm or half of main reinforcement bar diameter Prepare concrete surface and reinforcement and to carry out repair works by applying patch repair mortar and testing as per drawing no: JKR/CKAS/P/08/IP/19/03/01 and Specification of Concrete Patch Repair JKR 00000-0000-00. POLYUREA WATERPROOFING FOR FLAT ROOF To carry out waterproofing works as per drawing no: JKR/CKAS/15/01/W22/V28/BPH/BS/03(03) Waterproofing system shall include ponding test and ten (10) years of performance warranty (material and workmanship warranty) from the manufacturer's effective from the date of expiry of Defect and Liability Period (DLP). | M2 M2 M2 M2 | 110 75 35 35 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/3/5
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | WATERPROOFING WORKS To lay 25mm (min) thick cement screed with minimal compressive strength of 20MPa; laid to fall 1:100 towards the directions of gutters or to nearest drainage outlets and all in accordance to the manufacturer's written instructions and drawings approved by the S.O. The base screed shall be allowed to cure for 7 days prior to the waterproofing system application. Apply one (1) layer of epoxy resin base primer and two (2) layers of Polyurea waterproofing; coverage area at least 1.5kg/m2 per layer of Polyurea waterproofing; including to construct a cement screed angle fillet with lates & fibre mesh reinforces (35mm x 35mm ) at edge of wall and 300mm high upturn water proofing at skirting and drop/riser; and laid using appropriate tool and in strict accordance to the manufacturer's written instructions approved by the S.O's. i) Flat Roof Slab ii) Flat Roof Slab Skirting; up to 300 mm high To carry out Ponding Test on the waterproofing system | M2 M2 M2 SUM | 110 90 20 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/3/6
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
WATERPROOFING WORKS COLLECTION FROM PAGE NO. C1/3/1 FROM PAGE NO. C1/3/2 FROM PAGE NO. C1/3/3 FROM PAGE NO. C1/3/4 FROM PAGE NO. C1/3/5 FROM PAGE NO. C1/3/6 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/3/7
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B | WINDOWS, VENT AND EXTERNAL DOORS | ||||
WINDOWS | |||||
Supply and install the following window as shown in Drawing (JKR/CA/14/10/101/W24/018/BS/J/02) | |||||
Glass Window including all necessary ironmongery fittings and fixing | |||||
Supply, deliver and install 1350mm x 2950mm high glass window including new solid frames of Grade SG1 (Chengal) ; complete with all necessary accessories and painting; all as per detail in the drawing and specification and all fixed in accordance with the method statement provided by registered conservators, manufacturer’s details and Architect’s approval and satisfaction. | |||||
Lobi Lift 1 ; TYPE 1 | NO | 1 | |||
Supply, deliver and install 750mm x 2950mm high glass window including new solid frames of Grade SG1 (Chengal) ; complete with all necessary accessories and painting; all as per detail in the drawing and specification and all fixed in accordance with the method statement provided by registered conservators, manufacturer’s details and Architect’s approval and satisfaction. | |||||
Lobi Lift 1 ; TYPE 2 | NO | 2 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/4/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | WINDOWS, VENT AND EXTERNAL DOORS | ||||
Supply and install silicon rubber as shown in | |||||
Drawing (JKR/CA/14/10/101/W24/018/BS/R/02). | |||||
Supply, deliver and install approved silicon rubber | |||||
around the window glass panel complete with all | |||||
necessary work; all as per detail in the drawing | |||||
and specification and all fixed in accordance with | |||||
the method statement provided by registered | |||||
conservators, manufacturer’s details and | |||||
Architect’s approval and satisfaction. | |||||
Tingkap di Lobi Lift Belakang | M | 175 | |||
Supply and install the following louvers including | |||||
all necessary ironmongery fittings and fixing as | |||||
shown in drawing | |||||
Supply, deliver and install louvers including new | |||||
solid frames of Grade SG1 complete with 12mm | |||||
thick heat soaked tempered clear glass on both | |||||
surfaces (outside and inside) including all | |||||
necessary accessories as per detail in the | |||||
drawing and specification and all fixedin | |||||
accordance with the method statement provided | |||||
by registered conservators, manufacturer’s details | |||||
and Architect’s approval and satisfaction. | |||||
Menara 4, 5 & 6 (louvers size; 1200mm x | |||||
1500mm ; JKR/CA/14/10/101/W24/018/BS/V/01) | NO | 9 | |||
Menara 2 & 3 (louvers size; 1200mm x 1500mm ; | |||||
JKR/CA/14/10/101/W24/018/BS/Y/02) | NO | 8 | |||
Menara 1 (louvers size; 1200mm x 1200mm ; | |||||
JKR/CA/14/10/101/W24/018/BS/W/02) | NO | 4 | |||
Fasad Tengah Kiri Kanan | |||||
(JKR/CA/14/10/101/W24/018/BS/X/01) | NO | 14 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/4/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
WINDOWS, VENT AND EXTERNAL DOORS COLLECTION FROM PAGE NO. C1/4/1 FROM PAGE NO. C1/4/2 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/4/3
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A | INTERNAL DOORS SOLID DOOR Supply and install the following door as per Drawing (JKR/CA/14/10/101/W24/018/BS/T/01) Solid door including all necessary ironmongery fittings and fixing Supply, deliver, and install a solid door with a new frame replicates the existing frame, complete with all necessary accessories and painting, as detailed in the drawings and specifications. All work must be completed in accordance with the method statement provided by registered conservators, as well as the manufacturer's details and the Architect's approval and satisfaction. Overall size 1600mm x 2100mm high solid door ; at Pejabat AIAC | NO | 1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/5/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
INTERNAL DOORS COLLECTION FROM PAGE NO. C1/5/1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/5/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D | EXTERNAL FLOOR FINISHES | ||||
FLOOR FINISHINGS | |||||
BED AND BACKING | |||||
13mm Thick Cement and sand (1:3) screed bed as specified | |||||
To receive tile; level, falls, falls and crossfalls and to slope not exceeding 15 degree from horizontal; on concrete base | |||||
Drop Off Porch | M2 | 60 | |||
100mm High to skirting; with bull nose on edge | |||||
Drop Off Porch | M | 47 | |||
Floor Finishes (Tiles) at Drop Off Porch as per in the drawing no JKR/CA/14/10/101/W24/018/BS/I/01 | |||||
Supply, deliver and install and complete approved floor tiles that match the existing floor finishes; bedded and jointed in cement and sand (1:3) mortar; pointing with grout in white cement polish with all as per Registered Conservators’ and Architect’s approval | |||||
To level, falls and crossfalls and to slope not exceeding 15 degrees from horizontal | |||||
Drop Off Porch | M2 | 60 | |||
100mm High to skirting; with bull nose on edge | |||||
Drop Off Porch | M | 47 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/6/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
EXTERNAL FLOOR FINISHES COLLECTION FROM PAGE NO. C1/6/1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/6/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G H | INTERNAL FLOOR FINISHES | ||||
FLOOR FINISHINGS | |||||
BED AND BACKING | |||||
13mm Thick Cement and sand (1:3) screed bed | |||||
as specified | |||||
To receive tile; level, falls, falls and crossfalls and | |||||
to slope not exceeding 15 degree from horizontal; | |||||
on concrete base | |||||
Tangga Tepi Bilik Pam | M2 | 40 | |||
Tandas Lelaki Tengah | M2 | 26 | |||
100mm High to skirting; with bull nose on edge | |||||
Tangga Tepi Bilik Pam | M | 39 | |||
Tandas Lelaki Tengah | M | 21 | |||
TILE FINISHINGS | |||||
Tangga Tepi Bilik Pam as per drawing no. | |||||
JKR/CA/14/10/101/W24/018/BS/E/01 | |||||
Xxxxxx Xxxxxx Tengah as per drawing no. | |||||
JKR/CA/14/10/101/W24/018/BS/O/01 | |||||
Supply, deliver, install and complete approved | |||||
floor tiles that match to the existing floor finishes; | |||||
bedded and jointed in cement and sand (1:3) | |||||
mortar; pointing with grout in white cement polish | |||||
in accordance with the method statement | |||||
provided by registered conservators’ and | |||||
Architect’s approval. | |||||
To level, falls and crossfalls and to slope not | |||||
exceeding 15 degrees from horizontal | |||||
Tangga Tepi Bilik Pam | M2 | 40 | |||
Tandas Lelaki Tengah | M2 | 26 | |||
100mm High to skirting; with bull nose on edge | |||||
Tangga Tepi Bilik Pam | M | 39 | |||
Tandas Lelaki Tengah | M | 21 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/7/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A | INTERNAL FLOOR FINISHES RESURFACING OF INTERNAL FLOOR FINISHES Resurfacing of the existing floor to receive approved new cement render, complete with a waterproofing layer at the appropriate slope (gradient) toward the scupper drain or floor trap, as detailed in the drawings and specifications. All work must be executed in accordance with the method statement provided by registered conservators and must include a manufacturer's warranty and a product warranty of ten (10) years, along with the Architect's approval and satisfaction, as shown in drawing no. JKR/CA/14/10/101/W24/018/BS/M/01 Rumah Pam Chiller | M2 | 54 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/7/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
INTERNAL FLOOR FINISHES COLLECTION FROM PAGE NO. C1/7/1 FROM PAGE NO. C1/7/2 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/7/3
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C | EXTERNAL CEILING FINISHES | ||||
CEILING FINISHINGS | |||||
IN-SITU FINSHINGS | |||||
SUSPENDED CEILINGS | |||||
Aluminium Strip Ceiling Structures | |||||
Supply,deliver,install and complete aluminium strip ceiling structures including all necessary works jointing, framing, support, hanges, accessories and finishing related in accordance with the method statement provided by registered conservators; all as per specifications and drawing no. JKR/CA/14/10/101/W24/018/BS/G/01 | |||||
Kafeteria (Near Pool) | M2 | 80 | |||
Boxed-Up Rain Water Down Pipe (RWDP) as per drawing no. JKR/CA/14/10/101/W24/018/BS/F/01 at Siling Koridor Luar (Kitchen) | |||||
Construct a new boxed-up plaster type ceiling including all necessary in accordance with the method statement provided by registered conservators and the latest JKR specification guidelines. | ITEM | ||||
Upgrade the existing vent ducting by adding a 5mm thick stainless steel plate (welded) to the surface to prevent rainwater from flowing into the boxed-up ceiling, or the contractor shall propose a repair method for upgrading the vent ducting, subject to approval by the S.O. | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/8/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
EXTERNAL CEILING FINISHES COLLECTION FROM PAGE NO. C1/8/1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/8/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | INTERNAL CEILING FINISHES | ||||
CEILING FINISHINGS | |||||
IN-SITU FINISHES | |||||
Supply,deliver,install and complete approved ceiling structures and finishes that match to the existing ceiling finishes including all necessary works jointing, framing, support, hanges, painting and accessories in accordance with the method statement provided by registered conservators; all as per specifications, drawing and approval of the Arhictect and S.O. | |||||
Tandas OKU | M2 | 5 | |||
Control Room Regent Auditorium | M2 | 40 | |||
EXTRA OVER for forming access panel and including all necessary framing for each rooms | ITEM | ||||
The contractor is required to follow the M&E requirements and guidelines for these works by referring to the M&E drawings | |||||
Supply,deliver,install and complete approved ceiling structures and finishes that match to the existing ceiling finishes including all necessary works jointing, framing, support, hanges, painting and accessories in accordance with the method statement provided by registered conservators; all as per specifications, drawing and approval of the Arhictect and S.O. | |||||
Aras Bawah Tanah – Aras 3 (All area affected due installation the fire protection system and electrical works) | M2 | 4830 | |||
EXTRA OVER for forming access panel and including all necessary framing for each rooms | ITEM | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/9/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F | INTERNAL CEILING FINISHES | ||||
Supply,deliver,install and complete approved | |||||
plaster board ceiling structures including all | |||||
necessary works jointing, framing, support, | |||||
hanges, painting and accessories related in | |||||
accordance with the method statement provided | |||||
by registered conservators; all as per | |||||
specifications, drawing and approval of the | |||||
Arhictect and S.O. | |||||
Tepi Tangga (Lift) | M2 | 90 | |||
Tandas lelaki & perempuan | M2 | 50 | |||
Bilik Kompresor | M2 | 41 | |||
Menara 4, 5 & 6 | M2 | 139 | |||
EXTRA OVER for forming access panel and | |||||
including all necessary framing for each rooms | ITEM | ||||
PAINTING AND DECORATING | |||||
PAINTING | |||||
Approved prepare and apply one (1) layer of skim | |||||
coat and two (2) coats of emulsion paint or an | |||||
equivalent as specified. The color should be | |||||
approved by the S.O to match the existing | |||||
finishes and the paint shall include a | |||||
manufacturer's warranty and a product warranty | |||||
of ten (10) years. All work must be carried out in | |||||
accordance with the method statement provided | |||||
by registered conservators. | |||||
Siling Ruang Pejabat | M2 | 480 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/9/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B | INTERNAL CEILING FINISHES Boxed-Up Rain Water Down Pipe (RWDP) & RWDP Connecting System as per drawing no. JKR/CA/14/10/101/W24/018/BS/B/01-02 at Dinding & Tiang Grid E2/ES Sehingga E2/EC Construct a new boxed-up ceiling including all necessary works in accordance with the method statement provided by registered conservators and the latest JKR specification guidelines. Size boxed-up ; 1000mm x 400mm x 300mm (H) ; Replacement of the connecting system to match the existing system including all necessary works. | NO ITEM | 14 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C1/9/3
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
INTERNAL CEILING FINISHES COLLECTION FROM PAGE NO. C1/9/1 FROM PAGE NO. C1/9/2 FROM PAGE NO. C1/9/3 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/9/4
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B | EXTERNAL WALL FINISHES | ||||
PAINTING AND DECORATING | |||||
PAINTING | |||||
Approved prepare and apply one (1) layer of skim coat, one (1) layer of base paint, and two (2) coats of mineral based paint or lime wash paint. The color should be approved by the S.O to match the existing finishes on the plastered walls with a girth of over 300 mm and the paint shall include a manufacturer's warranty and a product warranty of ten (10) years. All work must be carried out in accordance with the method statement provided by registered conservators. | |||||
Fasad Dinding Luar Bangunan (Include Doors, Windows, Handrails & Decorative Grille Along Corridors And Stairs) | M2 | 9626 | |||
EXTRA OVER to groove lines | M | 1572 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/10/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
EXTERNAL WALL FINISHES COLLECTION FROM PAGE NO. C1/10/1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/10/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E F G H J | INTERNAL WALL FINISHES | ||||
PAINTING AND DECORATING | |||||
PAINTING | |||||
Approved prepare and apply one (1) layer of skim | |||||
coat, one (1) layer of base paint, and two (2) | |||||
coats of anti-fungal emulsion paint or an | |||||
equivalent as specified. The color should be | |||||
approved by the S.O to match the existing | |||||
finishes on the plastered walls with a girth of over | |||||
300 mm and the paint shall include a | |||||
manufacturer's warranty and a product warranty | |||||
of ten (10) years. All work must be carried out in | |||||
accordance with the method statement provided | |||||
by registered conservators. | |||||
Private Dining Room | M2 | 328 | |||
Dinding & Tiang E2 ES/EC | M2 | 448 | |||
Dinding Tangga 3 | M2 | 70 | |||
Bilik Tangki Air/Menara 5 & 6 | M2 | 182 | |||
Fasad Tengah | M2 | 61 | |||
Menara 1 | M2 | 141 | |||
Menara 2 & 3 | M2 | 183 | |||
Menara 4 | M2 | 63 | |||
Lobi Lift 1 | M2 | 220 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C1/11/1
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
Item | Description | Amount (RM) |
INTERNAL WALL FINISHES COLLECTION FROM PAGE NO. C1/11/1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C1/11/2
BILL NO. C1- UPGRADING OF BANGUNAN SULAIMAN (ALL PROVISIONAL)
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL
C1/SUM/1
To Ringkasan Tender :
Item | Description | From Page No. | Amount (RM) |
SUMMARY | |||
1 | GENERAL NOTES FOR UPGRADING WORKS | C1/1/2 | |
2 | STRUCTURAL AND NON-STRUCTURAL | C1/2/4 | |
REPAIR WORKS | |||
3 | WATERPROOFING WORKS | C1/3/7 | |
4 | WINDOWS, VENT AND EXTERNAL DOORS | C1/4/3 | |
5 | INTERNAL DOORS | C1/5/2 | |
6 | EXTERNAL FLOOR FINISHES | C1/6/2 | |
7 | INTERNAL FLOOR FINISHES | C1/7/3 | |
8 | EXTERNAL CEILING FINISHES | C1/8/2 | |
9 | INTERNAL CEILING FINISHES | C1/9/4 | |
10 | EXTERNAL WALL FINISHES | C1/10/2 | |
11 | INTERNAL WALL FINISHES | C1/11/2 | |
JABATAN KERJA RAYA MALAYSIA |
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN, JALAN SULTAN XXXXXXXXXXX, KUALA LUMPUR. |
SEKSYEN II |
SENARAI KUANTITI |
BILL NO. C2- UPGRADING OF BANGUNAN PAVILION (ALL PROVISIONAL) |
BILL NO. C2- UPGRADING OF BANGUNAN PAVILLION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | GENERAL NOTES FOR UPGRADING WORKS | ||||
GENERAL NOTE | |||||
Information : | |||||
The contractor is required to visit the site to take quantity measurement again to obtain the actual sizes and dimensions to be demolished and replaced with new works. | NOTE | ||||
Shop Drawings | |||||
The contractor needs to prepare, submit, and obtain approval for construction from the S.O.'s Representative for all shop/working drawings related to the Contract Works, as required by the relevant Specifications in the Contract. Detailed final drawings must be prepared, calculated, and approved before installation. | NOTE | ||||
Upgrading Works | |||||
The contractor must provide appropriate repair proposals and must obtain confirmation from a certified engineer/architect | NOTE | ||||
Registered Conservator Method Statement | |||||
The contractor must adhere to the method statement provided by the Registered Conservator and comply with the latest JKR Specification. | NOTE | ||||
Laporan Pemeriksaan Kerosakan Arkitek | |||||
All demolition or upgrading works in this BQ shall be read together with the Laporan Pemeriksaan Kerosakan Arkitek as attached in Section III (Spesifikasi Dan Pengukuran Dan Faktor Menghargakan Senarai Kuantiti), Part A (i) Laporan & Terma Rujukan. | NOTE | ||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C2/1/1
BILL NO. C2- UPGRADING OF BANGUNAN PAVILLION (ALL PROVISIONAL)
Item | Description | Amount (RM) |
GENERAL NOTES FOR UPGRADING WORKS COLLECTION FROM PAGE NO. C2/1/1 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C2/1/2
BILL NO. C2- UPGRADING OF BANGUNAN PAVILLION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B | STRUCTURAL AND NON-STRUCTURAL REPAIR WORKS | ||||
Notes: | |||||
This Bills is to read in conjunction with The Visual Condition Survey and Defect Mapping Report conducted by the Contractor based on TUB- 01/2024 - Seksyen II - Part D and related documents. All preliminaries in conjunction to works shall be identified and estimated. | |||||
The Contractor shall visit the site, inspect the existing premises and satisfy himself as to the nature and extent of the works and also the working conditions to be encountered. No claims for extra payment in this respect will be entertained. | |||||
All works shall be stricly in compliance to Specifications provided and/or product Manufacturer's Instruction (hereinafters referred "as specified") and to the approval of the Superintending Officer. (hereinafter referred as "the S.O."). | |||||
Rates to include supply all the necessary labours, materials, tools, safety measures, temporary access and supervision. | |||||
Rate to include identifying and marking the defective areas and making good of any damages; including reinstatement of finishes or repainting matching existing finishes to the satisfaction and approval of S.O. | |||||
STRUCTURAL REPAIR WORKS | |||||
To carry out structural crack repair works as per drawing no: JKR/CKAS/P/08/IP/19/02/01 | |||||
For cracks less than or equal to 0.3mm width | M | 200 | |||
For cracks ranging from 0.3mm to 3.0mm width | M | 100 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C2/2/1
BILL NO. C2- UPGRADING OF BANGUNAN PAVILLION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | STRUCTURAL AND NON-STRUCTURAL | ||||
REPAIR WORKS | |||||
To carry out patch repair works by hand patching | |||||
for areas less than or equal to 0.5 m2 and | |||||
maximum depth of 30mm or half of main | |||||
reinforcement bar diameter | |||||
Prepare concrete surface and reinforcement and | |||||
to carry out repair works by applying patch repair | |||||
mortar and testing as per drawing no: | |||||
JKR/CKAS/P/08/IP/19/03/01 and Specification of | |||||
Concrete Patch Repair JKR 00000-0000-00. | M2 | 25 | |||
NON STRUCTURAL REPAIR WORKS | |||||
Brickwall Crack Repair (Cracks Exceeds Plaster | |||||
Finishes) | |||||
Prepare concrete surface and to carry out repair | |||||
works as per drawing no: JKR/CKAS/P/08/17/03 | |||||
and reinstate the existing finishes/plaster to the | |||||
satisfaction of S.O. | |||||
For cracks less than 0.25mm width | M | 30 | |||
For cracks ranging from 0.25mm to 5.0mm width | M | 30 | |||
For cracks ranging from 0.25mm to 5.0mm width | |||||
(Including through crack) | M | 30 | |||
Typical Column-Brickwall Interfacial Plaster Crack | |||||
Repair | |||||
To carry out crack repair as per drawing no: | |||||
CPKA/FR/LP/KP/02 including removing | |||||
approximately 40 mm width on each side of crack, | |||||
installing one (1) layer of the galvanized wire | |||||
mesh size SWG 14 (40mm) and replastering. | M | 30 | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C2/2/2
BILL NO. C2- UPGRADING OF BANGUNAN PAVILLION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A B C D E | STRUCTURAL AND NON-STRUCTURAL | ||||
REPAIR WORKS | |||||
Typical Beam-Brickwall Interfacial Plaster Crack | |||||
Repair | |||||
To carry out crack repair as per drawing no: | |||||
CKASJ.BFSJ.SRD/2010/1 including removing | |||||
approximately 50 mm width on each side of | |||||
crack, installing one (1) layer of the galvanized | |||||
wire mesh size SWG 14 (80mm width) and | |||||
replastering. If gap width ≤ 0.5mm exists at beam-brickwall interface, inject epoxy into gap. | M | 20 | |||
If gap width > 0.5mm exists at beam-brickwall | |||||
interface, pump pressure grout into gap. | M | 20 | |||
BOXED UP (TEMPAT LETAK KERETA) | |||||
BOXED UP as per drawing no. | |||||
JKR/CKAS/15/01/W22/V28/BPH/PV/ST/01[02] & | |||||
01[02] | |||||
Break out a portion of the boxed-up CHS location | |||||
to pour non-shrink grout. | ITEM | ||||
Installation of Permanent Formwork for Grouting | |||||
with Rebar 4H10 | |||||
To Supply and install permanent formwork to | |||||
facilitate the grouting process. This includes | |||||
positioning and securing reinforcement bars | |||||
(rebar) as per the contractors and so work | |||||
method. The work is to be executed with precision | |||||
to ensure structural integrity and proper | |||||
alignment. | ITEM | ||||
Installation of Waterproofing on the CHS Before | |||||
Grouting Works | |||||
To apply a high-quality waterproofing membrane | |||||
to the applicable areas of the Circular Hollow | |||||
Section (CHS) prior to any grouting works. This | |||||
step is critical to prevent water ingress and protect | |||||
the structural components during the grouting | |||||
process. Ensure all surfaces are properly cleaned | |||||
and prepared for optimal adhesion. | |||||
ITEM | |||||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL | To Collection : |
C2/2/3
BILL NO. C2- UPGRADING OF BANGUNAN PAVILLION (ALL PROVISIONAL)
Item | Description | Unit | Quantity | Rate (RM) | Amount (RM) |
A | STRUCTURAL AND NON-STRUCTURAL REPAIR WORKS Installation of Box-Up After Grouting Works with Original Finishes To construct and install box-up structures after grouting works ensuring that they match the original finishes as specified. This includes careful attention to detail in both the materials used and the aesthetic appearance, ensuring continuity with existing structures and compliance with project specifications. | ITEM | |||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Collection : |
C2/2/4
BILL NO. C2- UPGRADING OF BANGUNAN PAVILLION (ALL PROVISIONAL)
Item | Description | Amount (RM) |
STRUCTURAL AND NON-STRUCTURAL REPAIR WORKS COLLECTION FROM PAGE NO. C2/2/1 FROM PAGE NO. C2/2/2 FROM PAGE NO. C2/2/3 FROM PAGE NO. C2/2/4 | ||
KERJA PEMBAIKAN KEROSAKAN DI BANGUNAN SULAIMAN KL To Summary : |
C2/2/5