KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN DALAMAN DAN PENGKABELAN FIBER OPTIK DARI IBU PEJABAT KE DEWAN HAMZAH UNTUK MAJLIS PERBANDARAN KLANG. DOKUMEN TAWARAN TEKNIKAL
MAJLIS PERBANDARAN KLANG NO. SEBUTHARGA: MPK 400-10/2/25
KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN DALAMAN DAN PENGKABELAN FIBER OPTIK DARI IBU PEJABAT KE DEWAN HAMZAH UNTUK MAJLIS PERBANDARAN KLANG.
DOKUMEN TAWARAN TEKNIKAL
BIL ISI KANDUNGAN | M/S | |
1. REKOD PENGALAMAN PENYEBUT HARGA (BORANG D) | D/1 | |
2. MAKLUMAT KAKITANGAN TEKNIKAL/ PEKERJA (BORANG E) | E/1 | |
3. SENARAI ALAT KELENGKAPAN/ | F/1 | |
JENTERA (BORANG F) | ||
4. SENARAI KERJA KONTRAKTOR SEMASA (BORANG | G) | G/1 |
5. BAHAGIAN A (BORANG SPESIFIKASI KERJA DAN PEMATUHAN SPESIFIKASI)
Peringatan:
1. Kesemua jadual yang disenaraikan ini Wajib dikemukakan. Penyebut Harga yang gagal mengemukakan Borang D, E, F, G dan BAHAGIAN B akan menyebabkan tawarannya ditolak.
BORANG D –REKOD PENGALAMAN KERJA
(SENARAI SEMUA KERJA YANG DISIAPKAN DALAM 5 TAHUN LEPAS)
Bil. | NAMA KONTRAK/PROJEK DAN SKOP KERJA | NILAI KONTRAK (RM) | NILAI PENYEBUT HARGA BERTANGGUNGJA WAB | TEMPOH KONTRAK ** | TARIKH MILIK TAPAK | TARIKH | SIAP | NAMA PEGAW JURUTE |
KONTRAK | SEBENAR | |||||||
+ Salinan Perakuan / Pengesahan Siap Kerja bagi setiap kerja yang disenaraikan hendaklah disertakan.
* Hanya perlu diisi sekiranya Penyebut harga melaksanakan kerja sebagai Ahli Syarikat Gabungan.
** Tempoh Kontrak hendaklah termasuk Lanjutan Masa yang diluluskan.
D/1
BORANG E – MAKLUMAT KAKITANGAN TEKNIKAL
(BUTIR-BUTIR KAKITANGAN YANG ADA DALAM PENGGAJIAN PENYEBUTHARGA MAS
*NAMA DAN NO. K/P | UMUR | KELULUSAN PROFESSIONAL/ PENDIDIKAN ** | TAHUN KELULUSAN | TARIKH DIAMBIL BEKERJA | JAWATAN YG DISANDANG/ TUGAS-TUGAS SEMASA |
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. |
* Salinan Sah borang KWSP `A’ setiap pekerja bagi bulan caruman terakhir dan Salinan Perjanjian Perkhidmata secara kontrak hendaklah ditawarkan.
** Sila sertakan Salinan Sijil Kelulusan atau Sijil Keahlian Badan-badan Professional.
E/1
BORANG F – SENARAI JENTERA-JENTERA, PERALATAN DAN PERKAKASAN
(Senarai loji & peralatan pembinaan utama kepunyaan Penyebut Harga yang sesuai yang boleh di
BIL. | BUTIRAN (JENIS, MODEL, BUATAN DAN KEUPAYAAN / SAIZ) | DIMILIKI, DISEWA- BELI ATAU DISEWAPAJAK* | BIL. SETIAP SATU | NILAI SEMASA | UMUR (DARI TARIKH BELIAN ASAL | TEMPAT SIM DIGUNAKAN S |
* Salinan kad pendaftaran dan / atau dokumen-dokumen lain bukti keempunyaan hakmilik Penyebut Harga a yang disenaraikan hendaklah disertakan.
** Pegawai yang menyediakan Dokumen Sebut harga hendaklah menyenaraikan butiran-butiran peralatan a
F/1
BORANG G - SENARAI KERJA KONTRAK SEMASA
(Senarai semua kerja di dalam tangan / sedang berjalan dan belum siap termasuk kontrak ya
BIL. | NAMA KONTRAK/PROJEK+ | NILAI KONTRAK (RM) | NILAI PENYEBUTHARGA BERTANGGUNGJA WAB | TEMPOH KONTRAK (**) | TARIKH MILIK TAPAK | TARIKH SIAP PROJEK | KEMAJUAN KERJ | |
IKUT JADUAL (%) | SEBEN DICAP (%) | |||||||
* Hanya perlu diisi sekiranya Penyebut Harga melaksanakan kerja sebagai Ahli Syarikat Gabungan.
** Tempoh Kontrak hendaklah termasuk Lanjutan Masa yang diluluskan.
G/1
BAHAGIAN A : BORANG SPESIFIKASI KERJA DAN
PEMATUHAN SPESIFIKASI
MAJLIS PERBANDARAN KLANG BANGUNAN SULTAN ALAM SHAH, XXXXX XXXXXXXXXXX, 00000 XXXXX, XXXXXXXX XXXXX XXXXX. TEL: 00000000 FAX: 33731909 Laman Web Rasmi : xxx.xxxxxxx.xxx.xx | PENGELUAR KERJA: JABATAN TEKNOLOGI MAKLUMAT Email: xxx@xxxxxxx.xxx.xx Tel: 33755555 sambungan 1251 | |
KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN DALAMAN DAN PENGKABELAN FIBER OPTIK DARI IBU PEJABAT KE DEWAN HAMZAH UNTUK MAJLIS PERBANDARAN KLANG |
PENYEBUTHARGA WAJIB MENGISI SEMUA MEDAN PEMATUHAN DAN TAWARAN SEBUTHARGA DENGAN MENANDAKAN (/) ATAU (X) DI RUANG PEMATUHAN DAN MENGISI DENGAN JELAS, LENGKAP DAN SEMPURNA BUTIRAN SPESIFIKASI YANG DITAWARKAN DI RUANG TAWARAN SEBUTHARGA. SEKIRANYA TIADA, ISIKAN TIADA.
TAWARAN AKAN DITOLAK SEKIRANYA GAGAL MEMENUHI MANA-MANA SYARAT TEKNIKAL YANG DITETAPKAN.
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
1.0 | KERJA-KERJA PENGKABELAN SEMULA TALIAN RANGKAIAN DALAMAN DAN PENGKABELAN FIBER OPTIK DARI IBU PEJABAT KE DEWAN HAMZAH UNTUK MAJLIS PERBANDARAN KLANG | |||
1.1 Penyebutharga dikehendaki melaksanakan kerja-kerja penaiktarafan Sistem Rangkaian setempat mengikut ketetapan berikut : 1.1.1 Membekal dan memasang Infrastruktur termasuk peralatan,perisian dan sistem hendaklah dipasang di lokasi yang telah ditetapkan oleh Majlis Perbandaran Klang (MPK); 1.1.2 Infrastruktur hendaklah dipasang dengan lengkap, sempurna dan beroperasi dengan baik sebelum ditauliahkan kepada MPK; 1.1.3 Pemasangan hendaklah melibatkan konfigurasi dan penyesuaian dengan persekitaran rangkaian sedia ada; 1.1.4 Semua peralatan/perisian/sistem yang telah dipasang hendaklah diuji dan disahkan oleh pihak MPK; 1.1.5 Memberikan perkhidmatan latihan; 1.1.6 Memberi sokongan teknikal dan penyelenggaraan; 1.1.7 Menyediakan dokumentasi berkaitan projek. |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
1.2 Penyebutharga hendaklah memastikan infrastruktur yang dibekalkan dan dipasang menyokong teknologi IPV4 dan IPV6 (dual stack) dan menyokong penuh teknologi IPV6 semasa dan akan datang tanpa ada kos tambahan. Jika didapati terdapat kos tambahan semasa memerlukan penggunaan IPV6 di masa akan datang, maka kos tersebut di bawah tanggungjawab penyebutharga. MPK tidak akan menanggung sebarang kos tambahan yang dikenakan. | ||||
1.3 Infrastruktur yang ditawarkan hendaklah dalam kategori jimat elektrik dan mendapat “Energy Star Certified” | ||||
1.4 Penyebutharga hendaklah memastikan infrastruktur boleh disesuaikan dengan sebarang persekitaran pejabat dan mempunyai keupayaan tinggi dengan teknologi paling terkini dan berkeupayaan menampung bebanan dan keperluan pengguna sedia ada dan akan datang. | ||||
2.0 | SPESIFIKASI MINIMUM INFRASTRUKTUR SISTEM RANGKAIAN KOMPUTER | |||
2.1 Penyebutharga dikehendaki mematuhi spesifikasi teknikal minimum bagi pembekalan dan pemasangan infrastruktur Sistem Rangkaian Komputer perkakasan, perisian dan sistem yang dibekalkan seperti yang dinyatakan di dalam jadual spesifikasi. | ||||
2.2 Penyebutharga MESTI menyertakan pernyataan surat sokongan (authorization letter) daripada prinsipal bagi bukti kelayakan sebagai pembekal. | ||||
2.3 Penyebutharga dikehendaki mengisi dengan terang, jelas, lengkap dan padat butiran spesifikasi yang ditawarkan di dalam borang ini yang ditetapkan beserta katalog dan brosur bagi memberi maklumat yang jelas mengenai produk yang ditawarkan. | ||||
2.4 Kerja-kerja pengkabelan semula talian rangkaian dalaman dan pengkabelan fiber optik dari ibu pejabat ke dewan hamzah adalah seperti berikut: 1) Membekal, menghantar, memasang dan menguji pengkabelan UTP Cat 6 daripada Distribution Switch ke Node Pengguna. ▪ Untuk menggantikan Node yang rosak dan penambahan Node sedia ada di setiap aras. ▪ Pemasangan Node seperti di lokasi berikut : a. Server Farm 5 b. Ground Floor (G) 103 c. Mezanin Floor (M) 98 d. 1st Floor (R1) 53 e. 2nd Floor (R2) 43 f. 3rd Floor (R3) 37 g. 4th Floor (R4) 17 h. 5th Floor (R5) 33 i. 6th Floor (R6) 16 |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
▪ Spesifikasi minimum adalah seperti berikut: | ||||
2) Membekal, Menghantar, Memasang Dan Menguji Network Equipment (Mengikut Aras). a) Distribution Switch Membekal, menghantar, memasang dan membuat konfigurasi stacking Distribution Switch 48-port (4 unit), Distribution Switch 24-port (4 unit) dan Distribution Switch 12-port (2 unit) dengan switch sedia ada mengikut lokasi seperti berikut: ▪ Ibu Pejabat (5 lokasi): i) Aras 5 ii) Aras 2 iii) Aras 1 iv) Aras Mezanin (M) v) Aras Bawah (G) ▪ Dewan Hamzah (3 lokasi): i) Bilik CCTV Server ii) Bilik Multimedia iii) Bilik Pengurusan |
PENGKABELAN SISTEM RANGKAIAN SETEMPAT(LAN) | |
KETERANGAN SPESIFIKASI | KTT |
i) Membekal dan memasang pengkabelan UTP Genuine Cat 6 daripada patch panel setiap aras ke lokasi node dinding pengguna (termasuk outlet/faceplate with shutter, Modular jack Type RJ45, metal trunking, PVC casing and flexible conduit). ii) Kerja-kerja hacking dan kemasan. iii) Kerja-kerja-kerja Termination, Labelling, Fluke Testing Report & Commissioning | 405 unit |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | ||||
Ya (/) | TIDAK (X) | ||||||
Spesifikasi minimum adalah seperti berikut: | |||||||
DISTRIBUTION SWITCH | |||||||
KETERANGAN SPESIFIKASI | KTT | ||||||
i) Distribution Switch 48-port 10/100/1000T ▪ Stackable switch with 2 combo ports | 4 | ||||||
(10/100/1000T or 100/1000X SFP) and 2 SFP+ | |||||||
stacking/user ports. | |||||||
▪ Manage layer 2 switch. | |||||||
▪ Support Link Aggregate Control protocol (LACP). | 4 | ||||||
▪ 1 meter cable for stacking – SFP+ “Twinax” | |||||||
direct attach cable. | |||||||
ii) Distribution Switch 24-port 10/100/1000T | |||||||
▪ Stackable switch with 2 combo ports (10/100/1000T or 100/1000X SFP) and 2 SFP+ | 2 | ||||||
stacking/user ports. | |||||||
▪ Manage layer 2 switch. | |||||||
▪ Support Link Aggregate Control protocol | |||||||
(LACP). | |||||||
▪ 1 meter cable for stacking – SFP+ “Twinax” | |||||||
direct attach cable. | |||||||
iii) Distribution Switch 12-port 10/100/1000T | |||||||
▪ Stackable switch with 2 combo ports | |||||||
(10/100/1000T or 100/1000X SFP) and 2 SFP+ | |||||||
stacking/user ports. | |||||||
▪ Manage layer 2 switch. | |||||||
▪ Support Link Aggregate Control protocol | |||||||
(LACP). | |||||||
▪ 1 meter cable for stacking – SFP+ “Twinax” | |||||||
direct attach cable. | |||||||
Jumlah | 10 | ||||||
b) Patch Panel (UTP Cat 6) Membekal, menghantar dan memasang Patch Panel (UTP Cat 6) 24 Port (14 unit) di dalam Rak Rangkaian sedia ada di lokasi seperti berikut: ▪ Ibu Pejabat : i) Aras 6 ii) Aras 5 iii) Aras 4 iv) Aras 3 v) Aras 2 vi) Aras 1 vii) Aras Mezanin(M) viii) Aras G ▪ Dewan Hamzah : iv) Bilik CCTV Server v) Bilik Multimedia vi) Bilik Pengurusan |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | ||||||
Ya (/) | TIDAK (X) | ||||||||
Spesifikasi minimum adalah seperti berikut: | |||||||||
UTP CAT6 PATCH PANEL | |||||||||
KETERANGAN SPESIFIKASI | KTT | ||||||||
i) UTP Cat6 Patch Panel (24 Ports) ▪ Menyokong penggunaan UTP cable Cat5e dan Cat6. ▪ Fit all standard 19” racks. ▪ Pemasangan termasuk: ▪ 2 meter Cat 6 Patch Cord (Factory terminated) – Patch Panel ke Switch. ▪ 3 meter Cat 6 Patch Cord (Factory terminated) – Faceplate to workstation/PC. | 14 unit | ||||||||
c) High End Network Workstation Membekal, membuat konfigurasi dan menguji High End Network workstation (2 unit). Spesifikasi minimum adalah seperti berikut : | |||||||||
HIGH END NETWORK WORKSTATION | |||||||||
KETERANGAN SPESIFIKASI | KTT | ||||||||
High End Network workstation : | 2 | ||||||||
a. Kategori | : | High End | |||||||
b. Model | : | Model terkini – (Sila nyatakan) | |||||||
c. Tahun Dikeluarkan | : | 2017 dan ke atas (Mesti sertakan surat dari principle) | |||||||
d. Processor | : | Intel Core i7 6700HQ Processor (minimum) | |||||||
e. Hard Drive | : | 1TB HDD upgradeable(min) | |||||||
f. Memory | : | 8GB (Min) | |||||||
g. Grafic Card | : | NVIDIA GeForce 4G VRAM | |||||||
h. Screen Display | : | Video Intelligent Technology -15.6” | |||||||
i. Card Reader | : | 2-in-1 card reader | |||||||
j. Web Camera | : | HD Web Camera | |||||||
k. l. | Network Port : | 10/100/1000 Base T | |||||||
USB Port : | 3 (minimum) | ||||||||
m. HDMI Port | : | 1 (minimum) | |||||||
n. Wireless | : | Integrated 802.11 | |||||||
o. Bluetooth | : | Built in Bluetooth | |||||||
p. Software Included | : | Adobe Acrobat Reader, DVD player (Burner) | |||||||
q. Operating System | : | Windows terkini – |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |||||
Ya (/) | TIDAK (X) | |||||||
with CD & Registration | professional edition come with license key | |||||||
r. Waranti : | 3 Tahun | |||||||
d) Patch Cord ke PC termasuk Half Moon Casing Membekal dan memasang 1 lot Patch Cord UTP cable (termasuk pemasangan Half Moon Casing) ke setiap Pc bagi tujuan kekemasan laluan kabel dan mengelakkan kabel dilantai rosak dan digigit haiwan perosak. e) Rack Switch 42U (termasuk KVM switch beserta monitor) Membekal, menghantar dan memasang 1 unit Rack Switch 42U dan 1 unit KVM Switch (termasuk Monitor). Spesifikasi minimum adalah seperti berikut : | ||||||||
f) Rack Switch 12U Membekal, menghantar dan memasang 2 unit Rack Switch 12U di lokasi seperti berikut: i) Bilik Multimedia Dewan Hamzah – 1 unit ii) Bilik Pengurusan Dewan Hamzah – 1 unit |
RACK SYSTEM | |
KETERANGAN SPESIFIKASI | KTT |
i) 1-Rack 42U (for mounting server) ▪ Width: EIA Standard 19″ Rack Rails ▪ External Width: 23.6″ – 600mm ▪ Height: 2,000mm | Units: 42U ▪ Depths: 39.37″ & 41.34″ ▪ Sidewalls, Split rear doors ▪ Baying Kits, toolless Shelves, casters, Bolt Down Kits, Cable Management ▪ Power Strips – vertical or Rackmount, Enclosure Monitoring System ▪ Toolless Blanking Panels, Fans ▪ Warranty: 3 years | 1 |
ii) KVM Switch ▪ Come with KVM switch and 18.5 inch rack monitor ▪ Include KVM console and accessories ▪ Minimum: support eight (8) servers ▪ Support Gen5 to Gen9 server ▪ Warranty: 3 years | 1 |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |||||
Ya (/) | TIDAK (X) | |||||||
Spesifikasi minimum adalah seperti berikut : | ||||||||
RACK SYSTEM | ||||||||
KETERANGAN SPESIFIKASI | KTT | |||||||
i) Rack 12U ▪ Wall mount rack 12U c/w accessories 12U - 600 X 700mm ▪ 19" Wall Mount Equipment Rack ▪ Front Perspex Lockable Door ▪ Side Panels ▪ 1 Low Noise Ventilation Fan 13A Power Point with 3 Sockets ▪ 1 Set of Cage Nuts Cable Management ▪ Warranty: 3 years | 2 | |||||||
g) AP Wireless (Included Configuration & Mounting) Membekal, menghantar, memasang dan menguji 3 unit AP Wireless (802.1 n/1ac Wi-Fi AP for business) di Dewan Hamzah MPKlang. Lokasi pemasangan AP wireless adalah seperti berikut:: i) Bilik Mesyuarat Dewan Hamzah – 1 unit ii) Bilik Pengurusan Dewan Hamzah – 1 unit iii) Ruang Dewan Hamzah – 1 unit Spesifikasi minimum AP wireless adalah seperti berikut: | ||||||||
AP WIRELESS | ||||||||
KETERANGAN SPESIFIKASI | KTT | |||||||
a. Standards | ▪ IEEE 802.11a/b/g/n/ac ▪ 2.4GHz and 5GHz | 3 | ||||||
b. Supported Data Rates | ▪ 802.11n/ac: 6.5Mbps – 173.4Mbps (20MHz) ▪ 13.5Mbps – 400Mbps (40MHz) ▪ 29.3Mbps – 867Mbps (80MHz) ▪ 802.11a: 54, 48, 36, 24, 18, 12, 9 and 6Mbps ▪ 802.11b: 11, 5.5, 2 and 1 Mbps ▪ 802.11g: 54, 48, 36, 24, 18, 12, 9 and 6 Mbps | |||||||
c. Radio Chains | ▪ 2 x 2 ▪ SU-MIMO : Up to 2 streams ▪ MU-MIMO : Up to 2 streams | |||||||
d. Spatial Streams | ||||||||
e. Channel | ▪ 20MHz, 40MHz, 80MHz | |||||||
f. RF POWER OUTPUT (Aggregate) | ▪ 26 dBm for 2.4GHz† ▪ 25 dBm for 5GHz† | |||||||
g. Channels | ▪ 2.4GHz channels* : 1-13 ▪ 5 GHz channels* : 36-64, 100- 140, 149-165 | |||||||
h. Frequency Band | ▪ IEEE 802.11 b/g/n: 2.4 – 2.484 GHz ▪ IEEE 802.11a/n/ac: 5.15 – 5.25 GHz; 5.25 – 5.35 GHz; 5.47 – |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |||||
Ya (/) | TIDAK (X) | |||||||
5.725 GHz; 5.725 – 5.85 GHz | ||||||||
i. Power Save | ▪ Supported | |||||||
j. Wireless Security | ▪ WPA-PSK, WPA-TKIP, WPA2 AES, 802.11i ▪ Authentication via 802.1X with the ZoneDirector, SmartZone, local authentication database, support for RADIUS, LDAP, and Active Directory | |||||||
h) Multifunction Device Network (MFD) Membekal, menghantar, memasang dan menguji 3 unit MFD. Spesifikasi minimum adalah seperti berikut : | ||||||||
MULTIFUNCTION DEVICE (MFD) NETWORK | ||||||||
KETERANGAN SPESIFIKASI | KTT | |||||||
a. Functions | Print, copy, scan, fax, email | 3 | ||||||
b. Resolution (black) | 600 x 600 dpi, Up to 38,400 x 600 enhanced dpi | |||||||
c. Resolution (color) | 600 x 600 dpi, Up to 38,400 x 600 enhanced dpi | |||||||
d. Resolution technology | HP ImageREt 3600, PANTONE® calibrated | |||||||
e. Print Technology | Laser | |||||||
f. Display | 4.3" intuitive touchscreen Color Graphic Display (CGD) | |||||||
g. Number of print cartridges | (1 each black, cyan, magenta, yellow) | |||||||
h. Replaceme nt cartridges | 410A Black LaserJet Toner Cartridge | |||||||
410A Cyan LaserJet Toner Cartridge | ||||||||
410A Yellow LaserJet Toner Cartridge | ||||||||
410X Magenta LaserJet Toner Cartridge | ||||||||
i. Duplex printing | Automatic (standard) | |||||||
j. Print languages | PCL 6, PCL 5c, postscript level 3 emulation, PCLm, PDF, URF, Native Office |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |||||
Ya (/) | TIDAK (X) | |||||||
k. Paper handling input, | Standard 50-sheet multipurpose tray, 250-sheet | |||||||
input tray, 50-sheet | ||||||||
Automatic Document Feeder (ADF) | ||||||||
l. Mobile Printing Capability | ePrint; Apple AirPrint™; Mopria™-certified; NFC | |||||||
Touch-to-print; Wireless Direct Printing; Google Cloud | ||||||||
Print 2.0; Mobile Apps | ||||||||
m. Connectivity , standard | Hi-Speed USB 2.0 port; built- in Gigabit Ethernet 10/100/1000 Base-TX | |||||||
network port; Easy-access | ||||||||
USB | ||||||||
n. Ports | 1 Hi-Speed USB 2.0; 1 Gigabit Ethernet | |||||||
10/100/1000 Base-TX; 1 | ||||||||
Easy-access USB | ||||||||
o. Network ready | Standard (built-in Gigabit Ethernet, Wi-Fi) | |||||||
p. Security management | Embedded Web Server: password-protection, secure | |||||||
browsing via SSL/TLS; | ||||||||
Network: enable/disable network ports and features, | ||||||||
SNMPv1 & SNMPv2 community password | ||||||||
q. Compatible operating systems | Windows OS compatible with In-Box Driver; Windows XP SP3 all 32-bit editions; Windows Vista all | |||||||
32-bit editions ; Windows 7 | ||||||||
all 32- & 64-bit editions; Windows 8/8.1 all 32- & 64- | ||||||||
bit editions (excluding RT OS for Tablets); | ||||||||
Windows 10 all 32- & 64-bit | ||||||||
editions (excluding RT OS for Tablets); | ||||||||
Windows OS compatible with Universal Print Driver (From | ||||||||
xxxx://xxx.XX.xxx); | ||||||||
Windows XP SP3 32- & 64- bit editions (XP Home, XP | ||||||||
Pro, etc.); Windows Vista all 32- & 64-bit editions ( | ||||||||
Windows 7 all 32- & 64-bit) |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |||||
Ya (/) | TIDAK (X) | |||||||
r. Memory, standard | 256 MB NAND Flash, 256 MB DRAM | |||||||
s. Warranty | 3 Years | |||||||
3.0 | KERJA-KERJA PENGKABELAN SAMBUNGAN FIBER OPTIC BACKBONE 10 GB DARIPADA IBU PEJABAT MAJLIS PERBANDARAN KLANG KE DEWAN HAMZAH | |||||||
3.1 Membekal, Menghantar, Memasang Dan Menguji Fiber Optic Backbone 10 Gb – Outdoor Pengkabelan 6 Core singlemode Outdoor Fiber Optic digunakan bagi tujuan: a) Talian Rangkaian Dalaman dari Pusat Data Ibu Pejabat ke Bilik Server Dewan Hamzah (300 meter) – 2 talian b) Talian CCTV dari Pusat Data Ibu Pejabat ke Bilik Server Dewan Hamzah (300 meter) – 2 Talian Spesifikasi minimum adalah seperti berikut: |
SPESIFIKASI FIBER OPTIC 10G – OUTDOOR KE DEWAN HAMZAH | ||
KETERANGAN SPESIFIKASI | KTT | |
1. | Memasang 4 talian fiber : a. 2 pair 6-Core singlemode Outdoor Fiber Optic termasuk aksesori lengkap (termasuk SC connector, fiber terminator, patch cord-3 meter, simplex/duplex connector, fiber tray dan lain-lain berkaitan) b. Fiber Optic hendaklah dipasang di dalam metal trunking yang dilabelkan. i) Infrastruktur yang dipasang hendaklah bersesuaian dengan infrastruktur sedia ada di tapak. ii) Trunking tersebut dipasang secara penyamaran. c. Pengkabelan mengambil kira anggaran jarak dari Pusat data Ibu Pejabat MPKlang ke Bilik Server CCTV Dewan Hamzah. d. Sekiranya tiada sambungan antara blok, kabel hendaklah dipasang di dalam tanah mengikut termasuk kerja-kerja pemotongan jalan, spesifikasi standard pemasangan fiber. | 4 Talian |
2. | Membuat kerja-kerja Splicing dan Termination |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
3.2 Membekal, Menghantar, Memasang Dan Menguji Fiber Optic Backbone 10 Gb – Indoor Pengkabelan 6 Core multimode Indoor Fiber Optic digunakan bagi tujuan: a) Talian Rangkaian Dalaman dari Bilik Server Dewan Hamzah ke Bilik Pengurusan Dewan(135 meter) – 2 talian b) Talian Rangkaian Dalaman dari Bilik Server Dewan Hamzah ke Bilik Multimedia (45 meter) – 2 Talian Spesifikasi minimum adalah seperti berikut: |
SPESIFIKASI FIBER OPTIC 10G – OUTDOOR KE DEWAN HAMZAH | ||
KETERANGAN SPESIFIKASI | KTT | |
1. | Memasang 4 talian fiber : a. 2 pair 6-Core multimode OM4 50/125um Indoor Fiber Optic termasuk aksesori lengkap (termasuk SC connector, fiber terminator, patch cord-3 meter, simplex/duplex connector, fiber tray dan lain-lain berkaitan) b. Fiber Optic hendaklah dipasang di dalam metal trunking yang dilabelkan. iii) Infrastruktur yang dipasang hendaklah bersesuaian dengan infrastruktur sedia ada di tapak. iv) Trunking tersebut dipasang secara penyamaran. c. Pengkabelan mengambil kira anggaran jarak dari Bilik Server Dewan Hamzah ke Bilik Pengurusan Dewan dan Bilik Multimedia. d. Sekiranya tiada sambungan antara blok, kabel hendaklah dipasang di dalam tanah mengikut termasuk kerja-kerja pemotongan jalan, spesifikasi standard pemasangan fiber. | 4 Talian |
2. | Membuat kerja-kerja Splicing dan Termination |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
4.0 | KERJA-KERJA KONFIGURASI DAN PENYESUAIAN SEMULA SEMULA SISTEM RANGKAIAN KOMPUTER MAJLIS PERBANDARAN KLANG | |||
4.1 Konfigurasi dan penyesuaian semula melibatkan keseluruhan connectivity bagi Sistem Rangkaian Komputer Majlis Perbandaran Klang seperti berikut : a) Konfigurasi dan penyesuaian connectivity Core Switch ke setiap talian dalaman di setiap aras dan fiber Optik di Ibu Pejabat dan Dewan Hamzah. b) Konfigurasi dan Penstrukturan semula VLAN Sistem Rangkaian Majlis Perbandaran Klang. c) Konfigurasi dan penyesuaian network equipment yang baru dengan persekitaran Sistem Network sedia ada. d) Konfigurasi dan penstrukturan semula keseluruhan capaian rangkaian ke endpoint, server, firewall, sistem keselamatan dan perkakasan LAN dan WAN sedia ada. | ||||
5.0 | KERJA-KERJA PENGUJIAN DAN PENTAULIAHAN INFRASTRUKTUR SISTEM RANGKAIAN KOMPUTER MAJLIS PERBANDARAN KLANG | |||
5.1 Pengujian dan pentauliahan termasuk kerja-kerja berikut : a) Pengujian dan pentauliahan Konfigurasi dan penstrukturan semula Sistem Rangkaian Dalaman (LAN). b) Pengujian dan pentauliahan infrastruktur bagi keseluruhan Sistem Rangkaian Komputer (Capaian LAN & WAN). c) Kerja-kerja pelabelan infrastruktur Sistem rangkaian Komputer. d) Kerja-kerja housekeeping Sistem Rangkaian Komputer yang lama/sedia ada. | ||||
5.2 Penyebutharga dikehendaki menjalankan pengujian mengikut peringkat pengujian yang ditetapkan seperti berikut : a) Penyebutharga mesti menjalankan ujian peringkat awal iaitu UAT (User Acceptance Test) dan ujian keseluruhan iaitu FAT (Final Acceptance Test) bagi memastikan keseluruhan infrastruktur Sistem Rangkaian Komputer Majlis Perbandaran Klang dapat berfungsi dengan sempurna. Jika didapati infrastruktur tersebut gagal berfungsi dan memerlukan tambahan peralatan/perisian/sistem yang lain, maka kos untuk perolehan tersebut di bawah tanggungjawab Penyebutharga. MPK tidak akan menanggung sebarang kos tambahan untuk perolehan tersebut. |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
b) Penyebutharga hendaklah memastikan setiap peringkat pengujian (UAT & FAT) diterima dan disahkan oleh pegawai MPK yang dipertanggungjawabkan ke atas projek ini. c) Penyebutharga MESTI menyediakan dokumen pentauliahan ke atas penyelesaian menyeluruh projek yang telah telah sempurna dan disahkan. | ||||
6.0 | LATIHAN DAN PEMINDAHAN PENGETAHUAN/TEKNOLOGI (TOT) | |||
6.1 Penyebutharga WAJIB menyediakan latihan dan pemindahan teknologi kepada personel ICT bagi tujuan pengoperasian peralatan, perisian dan sistem yang dipasang. | ||||
6.2 Penyebutharga dikehendaki menyediakan 2 kategori latihan seperti berikut : a) Administrative dan teknikal – 10 orang (Minimum) b) Latihan Bertauliah – 6 orang | ||||
6.3 Latihan hendaklah diberikan oleh tenaga pengajar yang bertauliah (mempunyai certificate yang diiktiraf) | ||||
6.4 Penyebutharga WAJIB menyediakan dokumen manual dalam bentuk hardcopy dan softcopy seperti berikut : a) Nota rujukan/manual latihan b) Manual pengendalian operasi dan penyelenggaraan | ||||
7.0 | JAMINAN DAN KHIDMAT SOKONGAN | |||
7.1 Jaminan dan khidmat sokongan yang ditawarkan hendaklah sekurang-kurangnya 3 tahun seperti berikut : a) Jaminan peralatan, perisian dan sistem (Part & Labor & On Site). b) Back to back Agreement antara syarikat dengan principal. c) Dalam tempoh jaminan ini semua khidmat baik pulih, penyelenggaraan, penggantian infrastruktur termasuk peralatan, perisian dan sistem yang rosak dan kos buruh hendaklah diberikan secara percuma. d) Xxxxxxxxxxx Talian dan Maklumbalas khidmat Sokongan. | ||||
7.2 Penyebutharga hendaklah memberikan khidmat sokongan termasuk penyelenggaraan merangkumi peralatan, perisian dan sistem termasuk tenaga kerja bagi lokasi di MPK sepanjang tempoh jaminan. | ||||
7.3 Penyebutharga dikehendaki menyediakan mekanisme sokongan teknikal yang melibatkan kakitangan sokongan teknikal syarikat penyebutharga dan syarikat prinsipal berkaitan bagi menjamin sokongan berterusan terhadap operasi infrastruktur yang dipasang. |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
7.4 Penyebutharga hendaklah menyediakan kakitangan khidmat sokongan teknikal yang cekap, berdikari, berkelayakan serta terlatih dalam memberikan khidmat sokongan terhadap semua perkakasan, perisian dan sistem yang dibekalkan. Mereka juga hendaklah mempunyai komunikasi yang baik dengan kakitangan Kerajaan bagi memastikan tugasan berjalan dengan lancar dan melaporkan kepada pegawai yang bertanggungjawab sekiranya ada masalah dalam tempoh jaminan. | ||||
7.5 Penyebutharga WAJIB menyediakan khidmat sokongan peringkat pertama (1st level support) melalui emel/telefon helpdesk di sepanjang tempoh kontrak dan MPK boleh mendapatkan khidmat nasihat daripada Penyebutharga. | ||||
7.6 Penyebutharga dikehendaki menyatakan dengan lengkap maklumat khidmat sokongan yang disediakan seperti penyediaan perkhidmatan helpdesk, telephone and online support dan tempoh maklum balas (response time) serta tindakan. | ||||
7.7 Penyebutharga MESTI melaksanakan penyelenggaraan pencegahan (preventive maintenance) sekurang-kurangnya tiga (3) kali setahun dalam tempoh kontrak sebutharga yang ditawarkan seperti berikut : a) Menyediakan jadual dan perincian perkhidmatan bagi lawatan penyelenggaraan berkala. b) Melaksanakan penyelenggaraan dan pengemaskinian peralatan, perisian dan sistem. c) Menyediakan laporan bulanan yang komprehensif dalam bentuk softcopy dan hardcopy termasuk laporan prestasi (performance report) rangkaian bagi menilai keberkesanan penggunaan sistem rangkaian yang baru. | ||||
7.8 Sebarang permasalahan/kerosakan kepada perkakasan, perisian dan sistem semasa tempoh jaminan hendaklah ditanggung oleh pihak pembekal dari segi peralatan, perkhidmatan, penukaran, kewangan dan lain-lain berkaitan. Alat ganti sementara (on-loan item) perkakakasan yang rosak hendaklah disediakan sehinggalah perkakasan dibaiki atau diganti. | ||||
7.9 Penyebutharga WAJIB mencadangkan kaedah penyelesaian dan membaikpulih sekiranya berlaku sebarang permasalahan / kerosakan berkaitan infrastruktur sistem rangkaian komputer. | ||||
7.10 Penyebutharga dikehendaki memberi maklumbalas dalam tempoh tidak melebihi 4 jam dari masa menerima laporan dari MPK jika berlaku permasalahan/kerosakan perkakasan, perisian atau sistem yang dibekalkan. Jika kerosakan tidak dapat dibaiki dalam tempoh berkenaan, penggantian peralatan hendaklah dilaksanakan atau menyediakan alat ganti sementara (on-loan item) bagi mengelakkan operasi terjejas. | ||||
7.11 Penyebutharga hendaklah bersedia memberikan khidmat penyelenggaraan dan sokongan selepas tempoh jaminan tamat berasaskan suatu perjanjian penyelenggaraan yang akan ditentukan kemudian. Walaubagaimanapun MPK mempunyai hak untuk memilih sebarang pembekal lain untuk memberikan khidmat penyelenggaraan. |
Bil | KEPERLUAN SPESIFIKASI MINIMA | PEMATUHAN | TAWARAN SEBUTHARGA (NYATAKAN BUTIR TAWARAN) | |
Ya (/) | TIDAK (X) | |||
8.0 | PELAKSANAAN DAN PASUKAN PROJEK | |||
8.1 Penyebutharga dikehendaki mematuhi garis panduan dan dasar keselamatan ICT yang telah ditetapkan dalam tempoh pelaksanaan projek dan melaksanakan langkah-langkah keselamatan bagi menjamin keselamatan maklumat, aset fizikal dan lain-lain berkaitan. 8.2 Penyebutharga dikehendaki menyediakan dalam bentuk dokumen cadangan projek/pelan pelaksanaan dan pasukan projek yang komprehensif bagi melaksanakan projek ini. 8.3 Penyebutharga hendaklah memastikan bahawa tempoh pelaksanaan projek ini adalah selama 16 minggu dari tarikh surat setuju terima dikeluarkan oleh MPK. 8.4 Penyebutharga dikehendaki mengemukakan Jadual Pelaksanaan Projek dan aktiviti-aktiviti lain yang terlibat dalam bentuk Gant- Chart. | ||||
9.0 | PENYEDIAAN DOKUMEN PELAKSANAAN PROJEK | |||
9.1 Penyebutharga yang telah dilantik dikehendaki menyediakan dan melengkapkan dokumen-dokumen seperti berikut : a) Jadual Pelaksanaan Kerja; b) Senarai infrastruktur yang dibekalkan termasuk peralatan, perisian dan sistem beserta nombor siri dan nombor pendaftaran lesen perisian; c) Borang uji lari UAT dan FAT untuk penerimaan dan pengesahan; d) Laporan kemajuan kerja dan laporan siap kerja e) Dokumentasi teknikal projek: ▪ Dokumen konfigurasi dan perubahan; ▪ Dokumen Laporan Insiden dan kerosakan (breakdown); ▪ Dokumen Laporan Logical & physical Network Diagram ; ▪ Dokumen Lengkap manual teknikal dan maklumat keseluruhan Sistem Rangkaian Komputer MPK untuk rujukan. |
Syarikat dengan ini bersetuju untuk mematuhi ke semua Spesifikasi Sebutharga seperti yang dinyatakan di atas. Diperakukan oleh :
Tanda tangan : ……………………………………………………
Nama : ……………………………………………………
Jawatan : ……………………………………………………
Cop syarikat :