CONCESSIONE / PPP: MIGLIORAMENTO, COSTRUZIONE, FUNZIONAMENTO E MANUTENZIONE DELLA STRADA DI ARBRI
GARE / Camera di Commercio Italiana in Albania – xxx.xxxx.xx
CONCESSIONE / PPP: MIGLIORAMENTO, COSTRUZIONE, FUNZIONAMENTO E MANUTENZIONE DELLA STRADA DI ARBRI
Paese: ALBANIA
Gara N°: REF-23581-08-09-2017
esclusa
Importo globale: 00.000.000.000 lek (circa 252.631.578 EURO) IVA
CARATTERISTICHE DEL PROGETTO E PROCEDURA
Durata del contratto: 13 anni
Procedura: Procedura aperta
Capitolato disponibile presso: xxx.xxx.xxx.xx
Data scadenza presentazione offerte:
02.10.2017 ore 12:00
ENTE APPALTANTE
Ministero dei Trasporti ed Infrastruttura Piazza “Skënderbej” n.5 , Tiranë Tel/Fax. x000 00 000 000
E-mail. xxxx@xxxxxxxxxx.xxx.xx xxx.xxxxxxxxxx.xxx.xx
R E P U B L I C OF A L B A N I A
MINISTRY OF TRANSPORT AND INFRASTRUCTURE
CONTRACT NOTICE
Section 1 Contracting Authority
1.1 Name and address of Contracting Authority
Name Ministry of Transport and Infrastructure
Address Square “Skënderbej” no.5 , Tiranë
Tel/Fax x000 00 000 000
1.2 Name and address of contact person Name Mr. Xxxxxxx Xxxxx
Legal Department Director
Address: Ministry of Transport and Infrastructure of Republic of Albania Square “Xxxxxxxxxx” xx.0 , Xxxxxx, Xxxxxxx
Email: Xxxxxxx.Xxxxx@xxxxxxxxxx.xxx.xx
Every communication, question, request for clarification or any kind of information about tender procedure should be asked only to the above contact person.
1.3 Type of Contracting Authority and its activity:
Central Institution | Independent Institution |
| |
Local Government Institution |
Section 2 Object of the agreement
2.1 Type of contract
Public works contract
2.2 Summary of main Concession Agreement terms
2.2.1 Form of the Agreement: Concession/ppp
2.2.2 Object of concession/ppp: Improvement, building, operation and maintenance of Arbri Road.
2.3 Term of Concession Agreement
Contract period: 13 years
2.4 Location of the Object of Agreement
Arbri Road begins in northeast of Tirana city and ends in border point of Bllata, near Dibër.
2.5 Separated into Lots:
Yes No
If Yes:
2.6 Shorts description of Lots:
1
2
3
2.7 Options:
Number of possible renovations (if applied):
Or: from to
2.8 Variants will be accepted
Yes No
2.9 Subcontracting
Yes
If subcontracting will be allowed, the bidders should specify the percentage: Not Defined
Shall the Contracting Authority make direct payments to the subcontractor: Yes No
2.10 Contract based on a special agreement between Albania and another country
Yes No
2.11 Foreseen project value
The foreseen project value is the total of maximum availability payment value for the whole contract period.
Project value based on the feasibility study is: 33,600,000,000 lekë (vat excluded).
2.12 Currency:
Project currency will be Albanian Lekë.
Section 3 Legal, Economic, Financial and technical Information
3.1 Qualification criteria
Pursuant to Annex 9 Qualification Criteria
3.2 Bid Security (applied on the bidding procedures above the higher threshold if as asked from Contracting Authority)
At the time of the Submission Deadline, Bidder shall submit a Bid Security at the amount of 2% of its Project Value, accompanied with the Bid Security Form in Annex 6.
Section 4 Procedure
4.1 Bidding Procedure:
Open
Restricted
4.2 Bidding criterion:
1 Technical proposal for building and maintenance of the road. a Conceptual Project Idea
b Works methodology
c Operational plan of maintenance and availability
d Temporary signs and Safety during works execution.
2 Environmental Impact
3 Social Impact
4 Works execution deadline.
5 Financial bid
4.3 Submission Deadline:
Date: October 2, 2017 Time: 12:00 Central European Time
Instructions for uploading the Bid can be found in the Albanian and English languages on the web-based portal of the Albanian Public Procurement Agency at xxx.xxx.xxx.xx. Every question and request for clarification about tender documents should be asked only to the above contact person.
Every page of the original bid should be signed, numbered and indexed systematically.
Every value in the Bid shall be calculated in following format “1,000 (one thousand)” and in any case of incompatibility, words will prevail.
4.4 Opening of the bids:
Date: October 2, 2017 Time: 12:00 Central European Time
4.5 Bid Validity Period:
Each Bid shall be valid for a period of 8 months from the Submission Deadline (“Bid Validity Period”). The Bid of the Selected Bidder will be valid until the Execution Date of the Agreement and the Contracting Authority shall be able to request that the Bid of an unsuccessful Qualified Bidder be extended until the Execution Date of the Agreement.
4.6 Bid Language:
Albanian English
Other
Section 5 Additional Information
5.1 Data Room
Potential bidder will find all needed information based on this contract: Project Idea, minimal technical specifications, qualification and evaluation criteria in Public Procurement Agency website xxx.xxx.xxx.xx
5.2 Request for clarifications
Every question and request for clarification about tender documents should be asked only to the above contact person.
Request for clarification can be required before:
September 27, 2017 Time: 12:00 Central European Time
Contracting Authority reserves the right to decline any request for clarification provided after this date.
Contracting Authority will provide all answers of the above requests for clarification via electronic platform xxx.xxx.xxx.xx.
5.3 Project Data and Information
Contracting Authority has finished the assessment and its summary, which are provided to possible bidders via data room, is as following:
Arbri Road: (i) fully completed 20.12 km, (ii) partially completed 15.175 km, and (iii) and there si an actual project also for 26.372 km. Total is 61.667 km which are designed for the actual project footprint with standard C3 and 26.372 km are not build.
Based on the project idea of the feasibility study Arbri road from Tirana to Bllata is schematically successively separated into 8 segments as following:
Segment 1, begins in the northeast exit of Tirana and ends in to Brari bridge with a distance of 1,153 km.
Segment 2: Brari bridge to Zall Bastar, L=5.46 km. Segment 3: Zall Bastar – Exit of Vasha bridge, L=23.188 km. Segment 4: Exit of Vasha bridge – Bulqizë, L=9.715 km.
Segment 5: Bulqizë- Çereneci Bridge, me L=20.12 km, completed in 2009 dhe 2011 is not part of the project idea.
Segment 6: Based on project study it is from Çereneci bridge and Maqellarë- border point Bllatë. L=9.111 km.
Segment D (7): To fulfill the needs of future traffic forecast, the existing road Maqellare – Border Point Bllata should be reconstructed on an urban road standard for distribution of all traffic of the Arbri Road toward Peshkopia (Maqellare) and Macedonia (Bllata Border Point)
Segment K (8): is a branch of Ura e Vashës Exit to Klos (Segment K), L= 3.092 km.
Drawings of segments 1 to 6 (except segment 5 which is not part of project idea) are prepared based on Standard C2 of Manual of Road Design in Albania – MPRrSh 2 – Geometric Design (2015). This standard is acceptable for this road based on the feasibility study.
Segment D is designed to fulfill the needs of passengers, urban traffic and all other in the interest of Arbri Road. Sole segment designed in C3 standard is the Segment K, which is based on the traffic on that road.
5.4 Value Added Tax (VAT)
Except when it is written differently, all cost references, expenses, tariffs and prices will be written without VAT.
5.5 Restrictions
The right to suspend the procedure:
Contracting Authority reserves the right to suspend bidding procedure temporarily or permanently based on its discretion. Possible bidders are not legitimated to claim for any compensation of costs or expenses in case of such a suspension.
Date of publication of this document 10/08/2017
HEAD OF CONTRACTING AUTHORITY MINISTER
Xxxxx Xxxxxxxxx