Phase or Phases definition

Phase or Phases the division of the Land into parcels as generally depicted on Exhibit “A-1” hereto and as referenced in the Takedown Schedule on Exhibit “B” hereto. The “Final Phase,” as such term is used in this Agreement shall mean the last Phase that is required to be purchased pursuant to this Agreement. If the takedown of the Phases is reordered in accordance with the flexibility language included on Exhibit “B,” assuming no permitted termination or default by any of the Parties hereunder, the Final Phase will be the last one of five (5) required to be purchased.
Phase or Phases means a distinct phase (or part of a phase as proposed within a Reserved Matters Application) of the Development shown for indicative purposes on the Phasing Strategy un less othe1wise agreed in writing between the Borough Council and the Owner;
Phase or Phases means one of the three phases of the Collaborative Program, or collectively the [***] Phase, the [***] Phase, and the [***] Phase.

Examples of Phase or Phases in a sentence

  • Mr. Syphus discussed the FY 2015 Preliminary Lapsing and Non-lapsing Balances report presented to EAC.

  • Upon completing a Phase or Phases or portions thereof, or remedying a Deficiency List, the Owner shall provide the City with Certification.

  • Upon completing a Phase or Phases, or remedying a Deficiency List, the Owner shall provide the City with a Certification.

  • An administrative merger may occur with respect to any two or more of the Phases, at the same or at different times, and an administrative merger with respect to any two or more of said Phases shall not affect the right of the Developer to merge another Phase or Phases at a later date or dates, subject to all of the provisions of this Declaration of Merger.

  • An ownership merger may occur with respect to any two or more of the Phases, at the same time or at different times, and an ownership merger with respect to any two or more of said Phases shall not affect the right of the Developer to merge another Phase or Phases at a later date or dates, subject to all of the provisions of this Declaration of Merger.

  • Design-Bid-Build projects: (COBCP Title – [$xxx,000 for Phase or Phases in request (Preliminary Plans, Working Drawings, and Construction)] or [$xxx,000 for Reappropriation of Phase or Phases in request (Preliminary Plans, Working Drawings, and Construction)].

  • Construction [(is scheduled to begin) or (began)] in Month 20xx and will be completed in Month 20xx.) Design-Build/Progressive Design-Build projects: (COBCP Title – [$xxx,000 for Phase or Phases in request (Performance Criteria and Design-Build)] or [$xxx,000 for Reappropriation of Phase or Phases in request (Performance Criteria and Design-Build)].

  • The provision of such Temporary Open Space shall be included in the ICP and the relevant detailed delivery programme for the Phase or Phases in which such existing park or public open space (or any part of such parks or public open space) is to be removed or made inaccessible to the public and for the Phase in which such temporary open space is to be provided.

  • No residential development shall be occupied until a detailed Landscape Management Plan for that particular Phase or Phases has been submitted to and approved in writing by the Local Planning Authority.

  • Once the Plan is prepared and completed and one or more Properties are acquired for a Phase or Phases, then as to each Phase to be implemented pursuant to a Phase Affordable Housing Agreement and, as applicable, Phase Implementation Agreement Developer may change and select a different architect for a Phase or Phases, but each new architect shall be subject to the prior approval of Authority and if approved shall then be the Project Architect.


More Definitions of Phase or Phases

Phase or Phases means construction of a functional portion of the Work in three stages as set forth in Exhibit B, attached hereto and incorporated herein by reference.

Related to Phase or Phases

  • Development Phase means the period before a vehicle type is type approved.

  • Development Work means the conduct of preclinical and clinical trials, the compilation of the regulatory dossier concerning Licensed Products and the conduct of other work necessary or useful for obtaining Regulatory Approval of Licensed Products.

  • Development Project means a project for the development of land within a

  • Phase III means Phase I (or Phase I/II), Phase II (or Phase II/III) and Phase III clinical trials, respectively, in each case as prescribed by applicable FDA IND Regulations, or any corresponding foreign statutes, rules or regulations.

  • Phases in respect of the Project shall mean that the components of the Project are placed in service during more than one year during the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Project placed in service in a given year during the Investment Period.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Phase 2 Trial means a human clinical trial conducted on study subjects with the disease or condition being studied for the principal purpose of achieving a preliminary determination of efficacy or appropriate dosage ranges, as further described in 21 C.F.R. §312.21(b) (including any such clinical study in any country other than the United States).

  • Phase 1 Trial means, with respect to a Licensed Product, a clinical trial (or — in case of a multi-phase clinical trial — those parts of a clinical trial) in line with the provisions of 21CFR312, Section 21 (a).

  • POC (Proof of Concept) means testing the Software for evaluation purposes.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Development Works means the external development works and internal development works on immovable property;

  • Development Well means a well drilled inside the established limits of an oil or gas reservoir, or in close proximity to the edge of the reservoir, to the depth of a stratigraphic horizon known to be productive.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Phase 2 means the second implementation phase of this section, beginning June 1, 2022 and continuing thereafter.

  • Development Term means the period commencing on the Closing Date and ending on the earlier of (a) the Option Closing Date or (b) the date the Option terminates or expires other than by exercise.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Phase 3 Trial means a human clinical trial of a Product on a sufficient number of subjects that is designed to establish that a pharmaceutical product is safe and efficacious for its intended use, and to determine warnings, precautions and adverse reactions that are associated with such pharmaceutical product in the dosage range to be prescribed, which trial is intended to support Approval of a Product, as described in 21 C.F.R. 312.21(c) for the United States, or a similar clinical study prescribed by the Regulatory Authorities in a foreign country.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Annual Work Plan and Budget means the work plan and budget approved by the Bank and adopted by the Borrower in accordance with the provisions of Section I.C of Schedule 2 of this Agreement, as said work plan and budget may be modified from time to time with the written agreement of the Bank.

  • Phase 3 means the period commencing on the day after the Phase 2 implementation date and ending on the Phase 3 implementation date (as defined below).

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Phase 3 Study means a clinical study of an investigational product in patients that incorporates accepted endpoints for confirmation of statistical significance of efficacy and safety with the aim to obtain Regulatory Approval in any country as described in 21 C.F.R. 312.21(c), or a comparable Clinical Study prescribed by the relevant Regulatory Authority in a country other than the United States. The investigational product can be administered to patients as a single agent or in combination with other investigational or marketed agents [***]

  • Planned Maintenance means any Maintenance BT has planned to do in advance.