14J Interconnection Studies Clause Samples

The 14J Interconnection Studies clause outlines the requirements and procedures for conducting studies necessary to evaluate the technical and operational feasibility of connecting a new facility or project to an existing utility grid or network. Typically, this clause specifies the types of studies required—such as feasibility, system impact, and facilities studies—and details the responsibilities of each party, including timelines, data sharing, and cost allocation. Its core practical function is to ensure that all technical and safety considerations are addressed before interconnection, thereby minimizing risks of system disruption and clarifying the process for all involved parties.
14J Interconnection Studies. The Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Part IV and Part VI of the Tariff.