29a Distributed Generator Sample Clauses

29a Distributed Generator. A facility, existing or under construction, for the generation of electricity that is or will be connected at the distribution level, typically located on the End-Use Consumer’s side of the consumption meter, and usually located at or near the intended place of use for at least some of the facility’s output.
AutoNDA by SimpleDocs

Related to 29a Distributed Generator

  • Unbundled Subloop Distribution (USLD) 2.8.2.1 The USLD facility is a dedicated transmission facility that BellSouth provides from an End User’s point of demarcation to a BellSouth cross-connect device. The BellSouth cross-connect device may be located within a remote terminal (RT) or a stand-alone cross-box in the field or in the equipment room of a building. The USLD media is a copper twisted pair that can be provisioned as a 2-wire or 4-wire facility. BellSouth will make available the following subloop distribution offerings where facilities exist: USLD – Voice Grade (USLD-VG) Unbundled Copper Subloop (UCSL) USLD – Intrabuilding Network Cable (USLD-INC (aka riser cable))

  • Unbundled Sub-Loop Distribution Intrabuilding Network Cable (USLD-INC) is the distribution facility owned or controlled by BellSouth inside a building or between buildings on the same property that is not separated by a public street or road. USLD-INC includes the facility from the cross connect device in the building equipment room up to and including the point of demarcation at the End User’s premises.

  • COSTS DISTRIBUTED THROUGH COUNTYWIDE COST ALLOCATIONS The indirect overhead and support service costs listed in the Summary Schedule (attached) are formally approved as actual costs for fiscal year 2020-21, and as estimated costs for fiscal year 2022-23 on a “fixed with carry-forward” basis. These costs may be included as part of the county departments’ costs indicated effective July 1, 2022, for further allocation to federal grants and contracts performed by the respective county departments.

  • Contract Distribution The Employer will provide all current and new employees with a link to the new Agreement. Each department or unit will maintain a paper copy of the contract accessible to all employees.

  • Initiating Interconnection 4.1 If ENT determines to offer Telephone Exchange Services and to interconnect with Verizon in any LATA in which Verizon also offers Telephone Exchange Services and in which the Parties are not already interconnected pursuant to this Agreement, ENT shall provide written notice to Verizon of the need to establish Interconnection in such LATA pursuant to this Agreement.

  • When Must Distributions from a Traditional IRA Begin You must begin receiving the assets in your account no later than April 1 following the calendar year in which you reach RMD age.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • How Are Distributions From a Traditional IRA Taxed for Federal Income Tax Purposes Amounts distributed to you are generally includable in your gross income in the taxable year you receive them and are taxable as ordinary income. To the extent, however, that any part of a distribution constitutes a return of your nondeductible contributions, it will not be included in your income. The amount of any distribution excludable from income is the portion that bears the same ratio as your aggregate non-deductible contributions bear to the balance of your Traditional IRA at the end of the year (calculated after adding back distributions during the year). For this purpose, all of your Traditional IRAs are treated as a single Traditional IRA. Furthermore, all distributions from a Traditional IRA during a taxable year are to be treated as one distribution. The aggregate amount of distributions excludable from income for all years cannot exceed the aggregate non-deductible contributions for all calendar years. You must elect the withholding treatment of your distribution, as described in paragraph 22 below. No distribution to you or anyone else from a Traditional IRA can qualify for capital gains treatment under the federal income tax laws. Similarly, you are not entitled to the special five- or ten-year averaging rule for lump-sum distributions that may be available to persons receiving distributions from certain other types of retirement plans. Historically, so-called “excess distributions” to you as well as “excess accumulations” remaining in your account as of your date of death were subject to additional taxes. These additional taxes no longer apply. Any distribution that is properly rolled over will not be includable in your gross income.

  • Unbundled Sub-Loop Feeder 2.8.4.1 Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and cross-box (or other access point) that serves an end user location.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

Time is Money Join Law Insider Premium to draft better contracts faster.