(a) — Total Leverage Ratio. As of the Test Date, the Total Leverage Ratio was ___:1.00. The maximum permitted Leverage Ratio is [3.00:1.00][3.50:1.00].1
Appears in 1 contract
(a) — Total Leverage Ratio. As of the Test Date, the Total Leverage Ratio was ___:1.00. The maximum permitted Leverage Ratio is (i) [3.00:1.00][3.50:1.00].13.25:1.00][4.00:1.00] from the Closing Date through March 31, 2008 and (ii) [3.00:1.00][3.75:1.00] from and after April 1, 2008.1
Appears in 1 contract
(a) — Total Leverage Ratio. As of the Test Date, the Total Leverage Ratio was ___:1.00. The maximum permitted Leverage Ratio is [3.00:1.00][3.50:1.00].1
Appears in 1 contract
(a) — Total Leverage Ratio. As of the Test Date, the Total Leverage Ratio was ___:1.00. The maximum permitted Leverage Ratio is [3.00:1.00][3.50:1.00].13.75:1.00.
Appears in 1 contract