Ability of operation in construction Sample Clauses

Ability of operation in construction. The waterproofing structure ARMEX BRIDGE is according to the quality requirements from Law no.10 dated 1995, as follows: • strength and stability – the waterproofing structure ARMEX BRIDGE contribute to increase sustainability of works due its fundamental characteristics: tensile strength (longitudinal = 1080 N/5cm and transversal = 830 N/5cm, static puncture resistance (unperforated at 30 kg, flow resistance (+1500C, impermeability. • safety in operation – the waterproofing structure ARMEX BRIDGE it’s safe due to membrane’s adherence at support layer (1.07 N/mm2). The waterproofing structure ARMEX BRIDGE has a good behavior both during the execution of sitting works of membrane (at direct building site traffic on the applied membrane’s surface to the vertical pressures, braking, accelerations of movement which enables the movement of low-speed transport equipments, continuously laying (spreading) and compaction of the asphalt) and during operation of the bridge. • fire safety – the waterproofing structure ARMEX BRIDGE makes part of combustibility class C2, according to Norm P 118. • hygiene, health, protection and restoration of environment – the waterproofing structure ARMEX BRIDGE does not influence this requirement. • Thermo waterproof insulation and energy saving: • the waterproofing structure ARMEX BRIDGE ensure impermeability to water of the protected surface. • Protection against noise: • the waterproofing structure ARMEX BRIDGE applied does not influence this requirement.
AutoNDA by SimpleDocs

Related to Ability of operation in construction

  • OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 7.4.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project.

  • Commencement and Completion of Construction The Company shall begin Construction Activities no later than January 1, 2014 (“Commencement Date”) and secure a final Certificate of Compliance by June 30, 2015 (hereinafter, “Completion Date”).

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • Pre-Construction Phase Employer’s Liability, Workers’ Compensation, Comprehensive General Liability and Comprehensive Automobile Liability in the amounts as set forth in the UGSC.

  • General Construction Obligations (a) Without limiting Section 10.3:

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Legal Construction If one or more of the provisions contained in this Agreement shall for any reason be held invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions and this Agreement shall be construed as if it did not contain the invalid, illegal, or unenforceable provision.

  • Obligation to Provide Public Access to Grant Records The Division reserves the right to unilaterally cancel this Agreement in the event that the Grantee refuses public access to all documents or other materials made or received by the Grantee that are subject to the provisions of Chapter 119, Florida Statutes, known as the Florida Public Records Act. The Grantee must immediately contact the Division's Contract Manager for assistance if it receives a public records request related to this Agreement.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Governing Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the laws of the State of New York. The section headings in this Agreement have been inserted as a matter of convenience of reference and are not a part of this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.