Adding Dropping or Trading Trips Sample Clauses

Adding Dropping or Trading Trips. 1. Flight attendants may (personal) drop a trip pairing subject to approval by supervisor/ scheduling and subject to operational requirements. Requests will be granted on a first come, first served basis. The drops may not reduce the flight attendant’s projection below forty hours (40:00).
AutoNDA by SimpleDocs
Adding Dropping or Trading Trips 

Related to Adding Dropping or Trading Trips

  • Shift Trading 16 Shift trading within Departments defined as trading 17 time, hour, for hour, shall be allowed provided that:

  • EPP transform-command RTT Refers to the RTT of the sequence of packets that includes the sending of a transform command plus the reception of the EPP response for only one EPP transform command. It does not include packets needed for the start or close of either the EPP or the TCP session. EPP transform commands are those described in section 2.9.3 of EPP RFC 5730. If the RTT is 5 times or more the corresponding SLR, the RTT will be considered undefined.

  • Employees At-Risk Through Medication Use 5.1 Employees who are taking medication which might affect their ability to undertake any kind of work safely, should advise an OH&S representative or the First Aid Officer, who will act immediately to eliminate the risks.

  • Reverse ADSL Loops If a CLEC’s ADSL Transmission Unit (including those integrated into DSLAMs) is attached to Sprint’s Network and if an ADSL Copper Loop should start at an outside location, and is looped through a host or remote, and then to the subscriber, the copper plant from the outside location to the Sprint host or remote central office must be a facility dedicated to ADSL transmission only and not part of Sprint’s regular feeder or distribution plant.

  • State Trading Enterprises The rights and obligations of the Parties in respect of state trading enterprises shall be governed by Article XVII of the GATT 1994 and the Understanding on the Interpretation of Article XVII of the GATT 1994, which are hereby incorporated into and made part of this Agreement.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).

  • Recruitment Through Jobcentre Plus 5.1 One of the key objectives of the Department for Work and Pensions is to move people from welfare into work. DWP has a Great Britain-wide network of Jobcentre Plus offices that provide job broking services for unemployed people. The Contractor is therefore required to notify Jobcentre Plus when recruiting staff for any entry-level job vacancies located within Great Britain, which may arise from the delivery of their contract to the Authority.

  • Rating Impact on Student Learning Growth ESE will provide model contract language and guidance on rating educator impact on student learning growth based on state and district-determined measures of student learning. Upon receiving this model contract language and guidance, the parties agree to bargain with respect to this matter.

Time is Money Join Law Insider Premium to draft better contracts faster.