Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling Maxcess-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Per square foot NA $100.00 PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA NA PE1BD Cable Installation Per Cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA PE1PL Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES Co-Carrier Cross-Connect (Note 4) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per Central Office Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 Space Availability Report* Per Central Office Requested $550.00 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Per square foot NA ton (one ton minimum) Per connection Per arrangement Per arrangement, sq. ft. Per arrangement, sq. ft. Per arrangement Per arrangement $100.00 PE1BW PE1CW 2,400.00 XX0XX XX0XX XX0XX Ground Bar* Project Management* Cable Racking / Fiber Duct $720.00 $1,675.00 ICB PE1SE Frame / Aisle Lighting ICB PE1S PE1SH Framework Ground Conductors Extraordinary Modifications ICB ICB Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh PE1BW Welded Wire-mesh Per first 100 sq. ft. $190.79 NA PE1CW Welded Wire-mesh Per add’l 50 sq. ft. $170.64 $17.33 NA 19.38 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot sq. ft. $7.50 $6.75 NA NA PE1BD Cable Installation Per Cable cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA Power PE1PL Power -48V DC Power Per amp $5.00 ICB PE1FB 120V AC Power single phase* Per breaker amp $5.50 ICB PE1FD 240V AC Power single phase* Per breaker amp $11.00 ICB PE1FE 120V AC Power three phase* 277V Per breaker amp $16.50 ICB PE1FG 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects Per cross connect First/Add’l PE1P2 2-wire $0.30 $19.20/$19.20 PE1P4 4-wire $0.50 $19.20/$19.20 PE1P1 DS-1 $8.00 $155.00/$27.00 PE1P3 DS-3 $72.00 $155.00/$27.00 PE1F2 2-fiber $15.64 $41.56/$29.82 PE1F4 4-fiber Per Cross Connect $.30 28.11 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 50.53/$38.78 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES Co-Carrier Cross-Connect (Note PE1ES Fiber PE1DS Copper (TBD) 4) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction NA ICB PE1A1 $0.06 $0.03 XX XX XX XXX XX0XX XX0XX XX0XX Security Access System Security system* System New Access Card Activation* Activation Administrative change, existing card* card Replace lost or stolen card* card Per Central Office premises Per Card card Per Card card Per card $52.00 $55.00 $35.00 Per Card $250.00 PE1SR Space Availability Report* Per Central Office Requested premises requested $550.00 POT Bay Arrangements Per cross-connect Prior to 6/1/99 2 PE1PE 2-Wire Cross-Connect 4 $0.40 NA PE1PF 4-Wire Cross-Connect $1.20 NA PE1PG DS1 Cross-Connect $1.20 NA PE1PH DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 XX XX0X0 0 Xxxxx Xxxxx-Xxxxxxx $38.79 XX XX0X0 0 Xxxxx Xxxxx-Xxxxxxx $52.31 NA PE1B2 Security Escort Per half hr./Add’l half hr. PE1BT Basic Time NA $25.53 41.00/$25.00 PE1OT Overtime NA PE1B4 $34.43 48.00/$30.00 PE1PT Premium Time NA $55.00/$35.00 AEH Additional Engineering Fee (Note Per request, First /Add’l (Note first half First/Add’l 5) First hr/add’l half hour/Add’l hr. Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCOMPASS-requested modifications to requests in progress or augmentations to for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 4,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection Per arrangement $2,100.00 $720.00 $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. $224.60 NA PE1CW ft. $22.81 NA Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA 3.90 NA PE1BD Cable Installation Per Cable NA $2,750.00 2,217.00 PE1PM Cable Support Structure Per entrance cable $13.35 24.55 NA PE1PL Power -48V DC Power 120V AC Power single phase* Per amp $7.09 ICB Per breaker amp $5.50 ICB Per breaker amp $11.00 ICB 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 XX0X0 XX0X0 Cross Connects (Note 4) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect Per Cross Connect Per Cross Connect Per Cross Connect Per Cross Connect Per Cross Connect $.30 .3648 $.50 .7297 $8.00 2.70 $72.00 49.24 $10.29 13.75 $18.50 24.71 First / Additional $12.60 / 41.50/$38.94 $12.60 41.56/$38.90 $12.60 / 70.79/$50.78 $12.60 69.60/$49.14 $155.00 / 73.00/$52.00 $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) 88.00/$67.00 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 45) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Per Central Office Requested $550.00 PE1PE XX0XX XX0XX XX0XX POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Cross- Connect 4 Wire Cross-Cross- Connect Per Cross Connect $.1091 $.2181 $.9004 $5.64 XX XX XX XX XX0X0 XX0X0 DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Cross- Connect 4 Fiber CrossCross- Connect $34.09 $45.97 NA NA XX0XX XX0XX XX0XX Security Escort Basic Time Overtime Premium Time Per 1/2 hour/Additional Half-Connect Per Cross Connect PE1PE hour NA NA NA $0.40 NA PE1PF 43.00/$25.57 $1.20 NA PE1PG 54.62/$32.46 $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA 66.24/$39.35 AEH Additional Engineering Fee Per request, First /Add’l (Note 56) First half Basic Time - hour/Add’l Basic Time - $31.00/$22.00 Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 9,926.72 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,400.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. $201.02 NA PE1CW Per add’l 50 sq. ft. $170.64 $17.33 NA 20.42 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA 5.00 NA PE1BD Cable Installation Per Cable NA $2,750.00 2,327.08 PE1PM Cable Support Structure Per entrance cable $13.35 24.23 NA PE1PL Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp $7.68 ICB Per breaker amp $7.14 $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB ICB ICB ICB ICB USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 .31 $.50 .62 $8.00 1.92 $72.00 39.94 $10.29 13.28 $18.50 23.87 First / Additional $12.60 / 54.21/$51.07 $12.60 54.23/$50.96 $12.60 / 99.23/$69.15 $12.60 97.48/$66.90 $155.00 / 73.00/$52.00 $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) 88.00/$67.00 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 45) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* system New Access Card Activation* Activation Administrative change, existing card* card Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Report Per Central Office Requested NA $550.00 PE1PE PE1PF PE1PG PE1PH PE1B2 PE1B4 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 0.06 $0.15 $0.58 $4.51 $32.94 $44.42 NA PE1PF NA NA NA NA NA PE1BT PE1OT PE1PT Security Escort Basic Time Overtime Premium Time Per 1/2 hour/Additional Half-hour NA NA NA $1.20 NA PE1PG 56.09/$31.99 $1.20 NA PE1PH 67.75/$39.00 $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA 79.41/$46.01 AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCOMPASS-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 6,993.00 Disconnect charge $1.70 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,100.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. $205.08 NA PE1CW ft. $20.83 NA Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 3.45 Disconnect charge $6.75 NA NA 53.24 PE1BD Cable Installation Per Cable NA $2,750.00 2,419.00 PE1PM Cable Support Structure Per entrance cable $13.35 22.90 NA PE1PL Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 6.93 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1P2 PE1P4 PE1P1 PE1P3 XX0X0 XX0X0 Cross Connects (Note 4) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber 2-wire 4-wire DS-1 DS-3 Per Cross Connect $.3996 $.7992 $2.90 $53.31 $15.82 $28.43 First / Additional $30.93/$29.59 $31.17/$29.77 $60.42/$41.68 $57.45/$39.81 $73.00/$52.00 $88.00/$67.00 Disconnect Charges First / Additional $12.76/$11.43 $12.83/$11.43 $12.87/$11.54 $14.92/$11.80 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 45) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Per Central Office Requested $550.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1PE PE1PF PE1PG PE1PH XX0X0 XX0X0 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Cross- Connect 4 Wire Cross-Cross- Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Cross- Connect 4 Fiber Cross-Cross- Connect Per Cross Connect PE1PE $0.40 0.1195 $0.2389 $0.9862 $5.81 $39.23 $52.91 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee (Note 6) Per request, First /Add’l (Note 5) First half hour/Add’l Half hour First /Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT XX0XX XX0XX XX0XX Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- Half-hour NA NA NA $48.00/$30.00 PE1PT hour NA 42.87/$25.54 $55.00/$35.00 54.43/$32.41 $65.99/$39.28 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee Central Office Modification Common Systems Modification – Cageless Common Systems Modification – Caged Power Per sq. ft. Per sq. ft. Per cage Per nominal –48v DC Amp $1.57 $3.26 $110.79 $5.76 XX0XX XX0XX Space Enclosure (Note 2) Per square foot NA $100.00 PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. Per add’l 50 sq. ft. $170.64 102.76 $17.33 10.44 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot sq. ft. $7.50 $6.75 NA 3.45 NA PE1BD Cable Installation Per Cable cable NA $2,750.00 2,305.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA PE1PL 21.33 XX XX0XX XX0XX XX0XX XX0XX XX0XX Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 6.65 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 XX0X0 XX0X0 Cross Connects (Note 3) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect cross connect $.30 0.32 $.50 0.64 $8.00 2.34 $72.00 42.84 $10.29 15.99 $18.50 First / Additional 28.74 First/Add’l $12.60 / 41.78/$39.23 $12.60 41.91/$39.25 $12.60 / 71.02/$51.08 $12.60 69.84/$49.43 $155.00 / 67.34/$48.55 $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 82.35/$63.56 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES Fiber PE1DS Copper (TBD) Co-Carrier Cross-Connect (Note 4) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction NA ICB PE1A1 $0.06 $0.03 XX XX XX XXX XX0XX XX0XX XX0XX Security Access System Security systemSystem* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office premises Per Card card Per Card card Per card $52.00 $55.00 $35.00 Per Card $250.00 PE1SR Space Availability Report* Per Central Office Requested premises requested $550.00 PE1PE XX0XX XX0XX XX0XX XX0X0 XX0X0 POT Bay Arrangements Prior to 6/1/99 2 2-Wire Cross-Connect 4 4-Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE cross-connect $0.40 NA PE1PF 0.10 $1.20 NA PE1PG 0.19 $1.20 NA PE1PH 0.79 $8.00 NA PE1B2 4.85 $25.53 NA PE1B4 39.67 $34.43 NA AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT 53.49 XX XX XX XX XX XX XX0XX XX0XX XX0XX Security Escort Basic Time Overtime Premium Time Per 1/2 half hr./Add’l half hr. NA NA NA $41.00/$25.00 PE1OT hour42.92/$25.56 $54.51/$32.44 $66.10/$39.32 AEH Additional Engineering Fee (Note 5) Per request, first half hr/Additional Half- NA add’l half hr. First/Add’l Basic Time $48.00/$30.00 PE1PT hour NA 31.00/$22.00 Overtime $55.00/$35.00 37.00/$26.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request request NA $3,850.00 9,926.72 PE1CA Subsequent Application Fee (Note 1) Per Request request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Per square foot NA ton (one ton minimum) Per connection Per arrangement Per arrangement, sq. ft. Per arrangement, sq. ft. Per arrangement Per arrangement $100.00 PE1BW PE1CW 2,400.00 XX0XX XX0XX XX0XX Ground Bar* Project Management* Cable Racking / Fiber Duct $720.00 $1,675.00 ICB PE1SE Frame / Aisle Lighting ICB PE1S PE1SH Framework Ground Conductors Extraordinary Modifications ICB ICB Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh PE1BW Welded Wire-mesh Per first 100 sq. ft. $201.02 NA PE1CW Welded Wire-mesh Per add’l 50 sq. ft. $170.64 $17.33 NA 20.42 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot sq. ft. $7.50 $6.75 NA 5.00 NA PE1BD Cable Installation Per Cable cable NA $2,750.00 2,327.08 PE1PM Cable Support Structure Per entrance cable $13.35 24.23 NA Power PE1PL Power -48V DC Power Per amp $7.68 ICB PE1FB 120V AC Power single phase* Per breaker amp $5.50 ICB PE1FD 240V AC Power single phase* Per breaker amp $11.00 ICB PE1FE 120V AC Power three phase* 277V Per breaker amp $16.50 ICB PE1FG 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects Per cross connect First/Add’l PE1P2 2-wire $0.31 $54.21/$51.07 PE1P4 4-wire $0.62 $54.23/$50.96 PE1P1 DS-1 $1.92 $99.23/$69.15 PE1P3 DS-3 $39.94 $97.48/$66.90 PE1F2 2-fiber $15.64 $41.56/$29.82 PE1F4 4-fiber Per Cross Connect $.30 28.11 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 50.53/$38.78 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES Co-Carrier Cross-Connect (Note PE1ES Fiber PE1DS Copper (TBD) 4) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction NA ICB PE1A1 $0.06 $0.03 XX XX XX XXX XX0XX XX0XX XX0XX Security Access System Security systemSystem* New Access Card Activation* Activation Administrative change, existing card* card Replace lost or stolen card* card Per Central Office premises Per Card card Per Card card Per card $52.00 $55.00 $35.00 Per Card $250.00 PE1SR Space Availability Report* Report Per Central Office Requested premises requested $550.00 POT Bay Arrangements Per cross-connect Prior to 6/1/99 2 PE1PE 2-Wire Cross-Connect 4 $0.06 NA PE1PF 4-Wire Cross-Connect $0.15 NA PE1PG DS1 Cross-Connect $0.58 NA PE1PH DS3 Cross-Connect 2 Fiber Cross$4.51 XX XX0X0 0 Xxxxx Xxxxx-Connect 4 Fiber CrossXxxxxxx $38.79 XX XX0X0 0 Xxxxx Xxxxx-Connect Xxxxxxx $52.31 NA Security Escort Per Cross Connect PE1PE half hr./Add’l half hr. PE1BT Basic Time NA $0.40 56.09/$31.99 PE1OT Overtime NA PE1PF $1.20 67.75/$39.00 PE1PT Premium Time NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA 79.41/$46.01 AEH Additional Engineering Fee (Note Per request, First /Add’l (Note first half First/Add’l 5) First hr/add’l half hour/Add’l hr. Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 6,993.00 Disconnect charge $1.70 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,400.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. $205.08 NA PE1CW Per add’l 50 sq. ft. $170.64 $17.33 NA 20.83 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 3.45 Disconnect charge $6.75 NA NA 53.24 PE1BD Cable Installation Per Cable NA $2,750.00 2,419.00 PE1PM Cable Support Structure Per entrance cable $13.35 22.90 NA PE1PL Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp $6.93 ICB Per breaker amp $7.14 $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects (Note 4) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber 2-wire 4-wire DS-1 DS-3 Per Cross Connect $.3996 $.7992 $2.90 $53.31 $15.82 $28.43 First / Additional $30.93/$29.59 $31.17/$29.77 $60.42/$41.68 $57.45/$39.81 $73.00/$52.00 $88.00/$67.00 Disconnect Charges First / Additional $12.76/$11.43 $12.83/$11.43 $12.87/$11.54 $14.92/$11.80 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 45) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Per Central Office Requested $550.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1PE PE1PF PE1PG PE1PH PE1B2 PE1B4 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 0.1195 $0.2389 $0.9862 $5.81 $39.23 $52.91 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee (Note 6) Per request, First /Add’l (Note 5) First half hour/Add’l Half hour First /Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT PE1OT PE1PT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- Half-hour NA NA NA $48.00/$30.00 PE1PT hour NA 42.87/$25.54 $55.00/$35.00 54.43/$32.41 $65.99/$39.28 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request request NA $3,850.00 6,993.00 Disconnect Charge $1.70 PE1CA Subsequent Application Fee (Note 1) Per Request request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Per square foot NA ton (one ton minimum) Per connection Per arrangement Per arrangement, sq. ft. Per arrangement, sq. ft. Per arrangement Per arrangement $100.00 PE1BW PE1CW 2,400.00 XX0XX XX0XX XX0XX Ground Bar* Project Management* Cable Racking / Fiber Duct $720.00 $1,675.00 ICB PE1SE Frame / Aisle Lighting ICB PE1S PE1SH Framework Ground Conductors Extraordinary Modifications ICB ICB Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh PE1BW Welded Wire-mesh Per first 100 sq. ft. $205.08 NA PE1CW Welded Wire-mesh Per add’l 50 sq. ft. $170.64 $17.33 NA 20.83 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot sq. ft. $7.50 $6.75 NA NA 3.45 PE1BD Cable Installation Per Cable cable NA $2,750.00 2,419.00 Disconnection charge $53.24 PE1PM Cable Support Structure Per entrance cable $13.35 22.90 NA Power PE1PL Power -48V DC Power Per amp $6.93 ICB PE1FB 120V AC Power single phase* Per breaker amp $5.50 ICB PE1FD 240V AC Power single phase* Per breaker amp $11.00 ICB PE1FE 120V AC Power three phase* 277V Per breaker amp $16.50 ICB PE1FG 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects (Note 4) 2-wire Per cross connect $.3996 First/Add’l $30.93/$29.59 PE1P4 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 .7992 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 31.17/$29.77 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1P1 PE1P3 XX0X0 XX0X0 Cross Connects (continued) DS-1 DS-3 2-fiber 4-fiber 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per cross connect $2.90 $53.31 $15.64 $28.11 First/Add’l $60.42/$41.68 $57.45/$39.81 $41.56/$29.82 $50.53/$38.78 Disconnect Charges First/Add’l $12.76/$11.43 $12.83/$11.43 $12.87/$11.54 $14.92/$11.80 $12.96/$10.34 $16.97/$14.35 PE1ES Fiber PE1DS Copper (TBD) Co-Carrier Cross-Connect (Note 45) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction NA ICB PE1A1 $0.06 $0.03 XX XX XX XXX XX0XX XX0XX XX0XX Security Access System Security systemSystem* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office premises Per Card card Per Card card Per card $52.00 $55.00 $35.00 Per Card $250.00 PE1SR Space Availability Report* Per Central Office Requested premises requested $550.00 PE1PE XX0XX XX0XX XX0XX XX0X0 XX0X0 POT Bay Arrangements Prior to 6/1/99 2 2-Wire Cross-Connect 4 4-Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE cross-connect $0.40 0.1195 $0.2389 $0.9862 $5.81 $38.79 $52.31 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee Per request, First /Add’l USOC Rate Element Description Unit Recurring Rate (Note 5RC) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Non-Recurring Rate (NRC) XX0XX XX0XX XX0XX Security Escort Basic Time Overtime Premium Time Per 1/2 half hr./Add’l half hr. NA NA NA $41.00/$25.00 PE1OT hour42.87/$25.54 $54.43/$32.41 $65.99/$39.28 AEH Additional Engineering Fee (Note 6) Per request, first half hr/Additional Half- NA add’l half hr. First/Add’l Basic Time $48.00/$30.00 PE1PT hour NA 31.00/$22.00 Overtime $55.00/$35.00 37.00/$26.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCOMPASS-requested modifications to requests in progress or augmentations to for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC Ground Bar Project Management Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,100.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. $146.80 NA PE1CW ft. $14.91 NA Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA NA PE1BD Cable Installation Per Cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA PE1PL Power -48V DC Power 120V AC Power single phase* phase Per amp $5.00 ICB Per breaker amp $5.50 ICB Per breaker amp $11.00 ICB 240V AC Power single phase* phase 120V AC Power three phase* phase 277V AC Power three phase* Per amp Per breaker amp Per breaker amp phase Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) XX0X0 XX0X0 XX0X0 XX0X0 XX0X0 XX0X0 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 $.50 $8.00 $72.00 $10.29 15.90 $18.50 28.50 First / Additional $12.60 / 19.20/$19.20 $12.60 19.20/$19.20 $12.60 / 155.00/$27.00 $12.60 155.00/$27.00 $155.00 / 73.00/$52.00 $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) 88.00/$67.00 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 4) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* system New Access Card Activation* Activation Administrative change, existing card* card Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Report Per Central Office Requested $550.00 PE1PE XX0XX XX0XX XX0XX XX0X0 XX0X0 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Cross- Connect 4 Wire Cross-Cross- Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Cross- Per Cross Connect $0.40 $1.20 $1.20 $8.00 $39.30 $53.00 NA NA NA NA NA NA Connect 4 Fiber CrossCross- Connect PE1BT PE1OT PE1PT Security Escort Basic Time Overtime Premium Time Per 1/2 hour/Additional Half-Connect Per Cross Connect PE1PE hour NA NA NA $0.40 NA PE1PF 41.00/$25.00 $1.20 NA PE1PG 48.00/$30.00 $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA 55.00/$35.00 AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half Basic Time - hour/Add’l Basic Time - $31.00/$22.00 Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 4,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection Per arrangement $2,400.00 $720.00 $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. $224.60 NA PE1CW Per add’l 50 sq. ft. $170.64 $17.33 NA 22.81 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA 3.90 NA PE1BD Cable Installation Per Cable NA $2,750.00 2,217.00 PE1PM Cable Support Structure Per entrance cable $13.35 24.55 NA PE1PL Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp $7.09 ICB Per breaker amp $7.14 $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB ICB ICB ICB ICB USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects (Note 4) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect Per Cross Connect Per Cross Connect Per Cross Connect Per Cross Connect Per Cross Connect $.30 .3648 $.50 .7297 $8.00 2.70 $72.00 49.24 $10.29 13.75 $18.50 24.71 First / Additional $12.60 / 41.50/$38.94 $12.60 41.56/$38.90 $12.60 / 70.79/$50.78 $12.60 69.60/$49.14 $155.00 / 73.00/$52.00 $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) 88.00/$67.00 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 45) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Per Central Office Requested $550.00 PE1PE PE1PF PE1PG PE1PH PE1B2 PE1B4 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 .1091 $.2181 $.9004 $5.64 $34.09 $45.97 NA PE1PF NA NA NA NA NA PE1BT PE1OT PE1PT Security Escort Basic Time Overtime Premium Time Per 1/2 hour/Additional Half-hour NA NA NA $1.20 NA PE1PG 43.00/$25.57 $1.20 NA PE1PH 54.62/$32.46 $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA 66.24/$39.35 AEH Additional Engineering Fee Per request, First /Add’l (Note 56) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCOMPASS-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 15.53 $3,248.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking / Fiber Duct Frame / Aisle Lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection Per arrangement Per arrangement, square foot NA Per arrangement, square foot Per arrangement Per arrangement $100.00 2,400.00 $720.00 $1675.00 ICB ICB ICB ICB PE1BW PE1BC PE1BF PE1CW PE1CC PE1CF Space Enclosure (Note 3) Cages Requested Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Wire Cage Gypsum Board Cage Fire Rated Cage Wire Cage Gypsum Board Cage Fire Rated Cage Per first 100 sq. ftFt. Per first 100 sq. Ft. Per first 100 sq. Ft. Per add’l 50 sq. ftFt. Per add’l 50 sq. Ft. Per add’l 50 sq. Ft. $170.64 41.99 $17.33 NA NA PE1PJ PE1PK Floor 84.10 $99.73 $4.14 $9.35 $11.30 XX XX XX XX XX XX XX0XX Xxxxx Space Zone A Zone B Per square foot Per square foot sq. Ft. $7.50 $6.75 NA 4.25 NA PE1BD Cable Installation Per Cable NA $2,750.00 2.77 $1,056.00 PE1PM Cable Support Structure Per entrance cable $13.35 22.94 NA PE1PL Power -48V DC Power 120V AC Power single phasephase * 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp $7.14 ICB Per breaker amp $7.14 $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects (Note 4) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber DS-1/DCS DS-1/DSX DS-3/DCS DS-3/DSX Optical Cross Connects Per Cross Connect PE12C $.30 .0524 $.50 11.57 PE14C $8.00 .0524 $72.00 11.57 PE11S $10.29 8.085 $18.50 First / Additional 69.64 PE11X $12.60 / .4110 $12.60 69.64 PE13S $12.60 / 56.97 $12.60 528.00 PE13X $155.00 / 10.06 $27.00 528.00 PE1F2 $155.00 / 6.46 $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) 2,431.00 PE1ES Co-Carrier Cross-Connect (Note 45) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Cable Support Structure Construction, new Per linear foot $0.06 NA PE1DS Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA ICB PE1A1 PE1A2 Security Access System Security systemSystem* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per Central Office Per Card request-5 cards Per Card $52.00 95.00NA $55.00 85.12 $35.00 $250.00 Per Card $250.00 Space Availability ReportReport * Per Central Office Requested $550.00 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 (Note 6) NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee (Note 7) Per request, First /Add’l (Note 5) First half hour/Add’l half hour First /Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 ¼ hour Per ¼ hour Per ¼ hour NA NA NA $41.00/$25.00 PE1OT hour/Additional Half- NA 10.89 $48.00/$30.00 PE1PT hour NA 13.64 $55.00/$35.00 16.40 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCOMPASS-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 9,926.72 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,100.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. $201.02 NA PE1CW ft. $20.42 NA Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA 5.00 NA PE1BD Cable Installation Per Cable NA $2,750.00 2,327.08 PE1PM Cable Support Structure Per entrance cable $13.35 24.23 NA PE1PL Power -48V DC Power 120V AC Power single phase* Per amp $7.68 ICB Per breaker amp $5.50 ICB Per breaker amp $11.00 ICB 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) XX0X0 XX0X0 XX0X0 XX0X0 XX0X0 XX0X0 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 .31 $.50 .62 $8.00 1.92 $72.00 39.94 $10.29 13.28 $18.50 23.87 First / Additional $12.60 / 54.21/$51.07 $12.60 54.23/$50.96 $12.60 / 99.23/$69.15 $12.60 97.48/$66.90 $155.00 / 73.00/$52.00 $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) 88.00/$67.00 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 45) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* system New Access Card Activation* Activation Administrative change, existing card* card Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Report Per Central Office Requested NA $550.00 PE1PE XX0XX XX0XX XX0XX XX0X0 XX0X0 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Cross- Connect 4 Wire Cross-Cross- Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Cross- Connect 4 Fiber Cross-Cross- Connect Per Cross Connect PE1PE $0.40 0.06 $0.15 $0.58 $4.51 $32.94 $44.42 XX XX XX XX XX XX XX0XX XX0XX XX0XX Security Escort Basic Time Overtime Premium Time Per 1/2 hour/Additional Half-hour NA PE1PF NA NA $1.20 NA PE1PG 56.09/$31.99 $1.20 NA PE1PH 67.75/$39.00 $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA 79.41/$46.01 AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half Basic Time - hour/Add’l Basic Time - $31.00/$22.00 Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Per square foot NA ton (one ton minimum) Per connection Per arrangement Per arrangement, sq. ft. Per arrangement, sq. ft. Per arrangement Per arrangement $100.00 PE1BW PE1CW 2,100.00 Ground Bar* Project Management* Cable Racking / Fiber Duct $720.00 $1,675.00 ICB Frame / Aisle Lighting ICB Framework Ground Conductors Extraordinary Modifications ICB ICB Space Enclosure (Note 3) Cages Prior Requested prior to 6/1/99 Welded Wire-mesh PE1BW Welded Wire-mesh Per first 100 sq. ft. $146.80 NA PE1CW Welded Wire-mesh Per add’l 50 sq. ft. $170.64 $17.33 NA 14.91 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot sq. ft. $7.50 $6.75 NA NA PE1BD Cable Installation Per Cable cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA Power PE1PL Power -48V DC Power Per amp $5.00 ICB PE1FB 120V AC Power single phase* Per breaker amp $5.50 ICB PE1FD 240V AC Power single phase* Per breaker amp $11.00 ICB PE1FE 120V AC Power three phase* 277V Per breaker amp $16.50 ICB PE1FG 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB Cross Connects Per cross connect First/Add’l PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire $0.30 $0.50 $19.20/$19.20 $19.20/$19.20 PE1P1 DS-1 $8.00 $155.00/$27.00 PE1P3 DS-3 $72.00 $155.00/$27.00 PE1F2 2-fiber $15.99 $67.34/$48.55 PE1F4 4-fiber Per Cross Connect $.30 28.74 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate 82.35/$63.56 PE1ES Fiber PE1DS Copper (RCTBD) Non-Recurring Rate (NRC) PE1ES Co-Carrier Cross-Connect (Note 4) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction NA ICB PE1A1 $0.06 $0.03 XX XX XX XXX XX0XX XX0XX XX0XX Security Access System Security systemSystem* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office premises Per Card card Per Card card Per card $52.00 $55.00 $35.00 Per Card $250.00 PE1SR Space Availability Report* Per Central Office Requested premises requested $550.00 POT Bay Arrangements Per cross-connect Prior to 6/1/99 2 PE1PE 2-Wire Cross-Connect 4 $0.40 NA PE1PF 4-Wire Cross-Connect $1.20 NA PE1PG DS1 Cross-Connect $1.20 NA PE1PH DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 XX XX0X0 0 Xxxxx Xxxxx-Xxxxxxx $39.67 XX XX0X0 0 Xxxxx Xxxxx-Xxxxxxx $53.49 NA PE1B2 Security Escort Per half hr./Add’l half hr. PE1BT Basic Time NA $25.53 41.00/$25.00 PE1OT Overtime NA PE1B4 $34.43 48.00/$30.00 PE1PT Premium Time NA $55.00/$35.00 AEH Additional Engineering Fee (Note Per request, First /Add’l (Note first half First/Add’l 5) First hr/add’l half hour/Add’l hr. Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 15.53 $3,248.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Per ton (one ton minimum) Per Connection $2,400.00 $720.00 Project Management* Per arrangement $1675.00 Cable Racking / Fiber Duct Per arrangement, square foot NA $100.00 PE1BW PE1CW ICB Frame / Aisle Lighting Per arrangement, square foot ICB Framework Ground Conductors Per arrangement ICB Extraordinary Modifications Per arrangement ICB Space Enclosure (Note 3) Cages Requested Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh PE1BW Wire Cage Per first 100 sq. ftFt. $41.99 NA PE1BC Gypsum Board Cage Per first 100 sq. Ft. $84.10 NA PE1BF Fire Rated Cage Per first 100 sq. Ft. $99.73 NA PE1CW Wire Cage Per add’l 50 sq. ftFt. $170.64 4.14 NA PE1CC Gypsum Board Cage Per add’l 50 sq. Ft. $17.33 9.35 NA PE1CF Fire Rated Cage Per add’l 50 sq. Ft. $11.30 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot sq. Ft. $7.50 $6.75 NA 4.25 NA PE1BD Cable Installation Per Cable NA $2,750.00 2.77 $1,056.00 PE1PM Cable Support Structure Per entrance cable $13.35 22.94 NA PE1PL Power -48V DC Power 120V AC Power single phasephase * 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp $7.14 ICB Per breaker amp $7.14 $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects (Note 4) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber DS-1/DCS DS-1/DSX DS-3/DCS DS-3/DSX Optical Cross Connects Per Cross Connect PE12C $.30 .0524 $.50 11.57 PE14C $8.00 .0524 $72.00 11.57 PE11S $10.29 8.085 $18.50 First / Additional 69.64 PE11X $12.60 / .4110 $12.60 69.64 PE13S $12.60 / 56.97 $12.60 528.00 PE13X $155.00 / 10.06 $27.00 528.00 PE1F2 $155.00 / 6.46 $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) 2,431.00 PE1ES Co-Carrier Cross-Connect (Note 45) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Cable Support Structure Construction, new Per linear foot $0.06 NA PE1DS Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA ICB PE1A1 PE1A2 Security Access System Security systemSystem* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per Central Office Per Card request-5 cards Per Card $52.00 95.00NA $55.00 85.12 $35.00 Per Card $250.00 Space Availability ReportReport * Per Central Office Requested $550.00 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 (Note 6) NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee (Note 7) Per request, First /Add’l (Note 5) First half hour/Add’l half hour First /Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 ¼ hour Per ¼ hour Per ¼ hour NA NA NA $41.00/$25.00 PE1OT hour/Additional Half- NA 10.89 $48.00/$30.00 PE1PT hour NA 13.64 $55.00/$35.00 16.40 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 4,910.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,400.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. $197.55 NA PE1CW Per add’l 50 sq. ft. $170.64 $17.33 NA 20.07 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA 4.01 NA PE1BD Cable Installation Per Cable NA $2,750.00 1,706.00 Disconnect charge $36.00 PE1PM Cable Support Structure Per entrance cable $13.35 24.05 NA PE1PL Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp $7.15 ICB Per breaker amp $7.14 $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES Cross Connects (Note 4) Per Cross Connect First / Additional PE1P2 2-wire $.26 $23.04/$22.11 PE1P4 4-wire $.52 $23.23/$22.24 PE1P1 DS-1 $2.03 $43.61/$30.60 PE1P3 DS-3 $36.27 $41.46/$29.20 PE1F2 2-fiber $10.20 $73.00/$52.00 PE1F4 4-fiber $18.34 $88.00/$67.00 Disconnect charges First / Additional 2-wire $9.48/$8.54 4-wire $9.53/$8.55 DS-1 $9.56/$8.63 DS-3 $11.06/$8.86 Co-Carrier Cross-Connect (Note 45) PE1ES Fiber Fiber Arrangement Cable Support Structure, existing Structure Per linear foot (existing) $0.06 NA PE1DS Copper Copper or Coaxial Cable Support Structure, existing Arrangement Per linear foot (existing) $0.03 NA (TBD) TBD Cable Support Structure Construction, new Construction Per new construction NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Per Central Office Requested $550.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1PE PE1PF PE1PG PE1PH PE1B2 PE1B4 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 0.0776 $0.1552 $0.6406 $4.75 $25.30 $34.12 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT PE1OT PE1PT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- Half-hour NA NA NA $48.00/$30.00 PE1PT 32.35/$19.95 $40.50/$25.00 $48.66/$30.05 AEH Additional Engineering Fee (Note 6) Per request, First half hour/Add’l Half hour NA First /Add’l Basic Time - $55.00/$35.00 31.00/$22.00 Overtime - $37.00/$26.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCOMPASS-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 4,910.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,100.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. $197.55 NA PE1CW ft. $20.07 NA Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA 4.01 NA PE1BD Cable Installation Per Cable NA $2,750.00 1,706.00 Disconnect charge $36.00 PE1PM Cable Support Structure Per entrance cable $13.35 24.05 NA PE1PL Power -48V DC Power Per amp $7.15 ICB 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1P2 PE1P4 PE1P1 PE1P3 XX0X0 XX0X0 Cross Connects (Note 4) 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber 2-wire 4-wire DS-1 DS-3 Per Cross Connect $.26 $.52 $2.03 $36.27 $10.20 $18.34 First / Additional $23.04/$22.11 $23.23/$22.24 $43.61/$30.60 $41.46/$29.20 $73.00/$52.00 $88.00/$67.00 Disconnect charges First / Additional $9.48/$8.54 $9.53/$8.55 $9.56/$8.63 $11.06/$8.86 PE1ES Fiber PE1DS Copper TBD Co-Carrier Cross-Connect (Note 45) Fiber Arrangement Cable Support Structure, existing Structure Copper or Coaxial Arrangement Cable Support Structure Construction Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing (existing) Per linear foot (existing) Per new construction $0.06 $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* card Per Central Office Per Card Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Per Central Office Requested $550.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1PE PE1PF PE1PG PE1PH XX0X0 XX0X0 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Cross- Connect 4 Wire Cross-Cross- Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Cross- Connect 4 Fiber Cross-Cross- Connect Per Cross Connect PE1PE $0.40 NA PE1PF 0.0776 $1.20 NA PE1PG 0.1552 $1.20 NA PE1PH 0.6406 $8.00 NA PE1B2 4.75 $25.53 NA PE1B4 25.30 $34.43 NA AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT 34.12 XX XX XX XX XX XX XX0XX XX0XX XX0XX Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- Half-hour NA NA NA $48.00/$30.00 PE1PT 32.35/$19.95 $40.50/$25.00 $48.66/$30.05 AEH Additional Engineering Fee (Note 6) Per request, First half hour/Add’l Half hour NA First /Add’l Basic Time - $55.00/$35.00 31.00/$22.00 Overtime - $37.00/$26.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA request $3,850.00 15.53 $3,248.00 PE1CA Subsequent Application Fee (Note 1) Per Request request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Per square foot NA ton (one ton minimum) Per connection Per arrangement Per arrangement, sq. ft. Per arrangement, sq. ft. Per arrangement Per arrangement $100.00 PE1BW PE1CW 2,400.00 XX0XX XX0XX XX0XX Ground Bar* Project Management* Cable Racking / Fiber Duct $720.00 $1,675.00 ICB PE1SE Frame / Aisle Lighting ICB PE1S PE1SH Framework Ground Conductors Extraordinary Modifications ICB ICB Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh PE1BW Wire Cage Per first 100 sq. ft. $41.99 NA PE1BC Gypsum Board Cage Per first 100 sq. ft $84.10 NA PE1BF Fire Rated Cage Per first 100 sq. ft. $99.73 NA PE1CW Wire Cage Per add’l 50 sq. ft. $170.64 4.14 NA PE1CC Gypsum Board Cage Per add’l 50 sq. ft. $17.33 9.35 NA PE1CF Fire Rated Cage Per add’l 50 sq. ft. $11.30 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot sq. ft. $7.50 $6.75 NA 4.25 NA PE1BD Cable Installation Per Cable NA cable $2,750.00 2.77 $1,056.00 PE1PM Cable Support Structure Per entrance cable $13.35 22.94 NA Power PE1PL Power -48V DC Power Per amp $6.95 ICB PE1FB 120V AC Power single phase* Per breaker amp $5.50 ICB PE1FD 240V AC Power single phase* Per breaker amp $11.00 ICB PE1FE 120V AC Power three phase* 277V Per breaker amp $16.50 ICB PE1FG 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects (Note 4) 2-wire Per cross connect $.0524 $11.57 PE1P4 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 .0524 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 11.57 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE11S PE1P1 PE13S PE13X PE1F2 Cross Connects (continued) DS-1/DCS DS-1/DSX DS-3/DCS DS-3/DSX Optical Cross Connects Per cross connect $8.085 $.4110 $56.97 $10.06 $6.46 $69.64 $69.64 $528.00 $528.00 $2,431.00 PE1ES Fiber PE1DS Copper (TBD) Co-Carrier Cross-Connect (Note 45) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction NA ICB PE1A1 $0.06 $0.03 XX XX XX XXX XX0XX XX0XX XX0XX Security Access System Security systemSystem* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per Central Office premises Per Card request 5 cards Per Card card Per card $52.00 NA $55.00 85.12 $35.00 Per Card $250.00 PE1SR Space Availability Report* Per Central Office Requested premises requested $550.00 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 (Note 6) NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee (Note 7) Per request, First /Add’l (Note 5) First half hour/add’l half hour First/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT XX0XX XX0XX XX0XX Security Escort Basic Time Overtime Premium Time Per 1/2 ¼ hour NA NA NA $41.00/$25.00 PE1OT hour/Additional Half- NA 10.89 $48.00/$30.00 PE1PT hour NA 13.64 $55.00/$35.00 16.40 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Per square foot sq. ft. NA $100.00 PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh PE1BW Welded Wire-mesh Per first 100 sq. ft. $170.64 NA PE1CW Welded Wire-mesh Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot sq. ft. Per square foot sq. ft. $7.50 $6.75 NA NA PE1BD Cable Installation Per Cable cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA Power PE1PL Power -48V DC Power Per amp $5.00 ICB PE1FB 120V AC Power single phase* Per breaker amp $5.50 ICB PE1FD 240V AC Power single phase* Per breaker amp $11.00 ICB PE1FE 120V AC Power three phase* 277V Per breaker amp $16.50 ICB PE1FG 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects Per cross connect First/Add’l PE1P2 2-wire $0.30 $12.60/$12.60 PE1P4 4-wire $0.50 $12.60/$12.60 PE1P1 DS-1 $8.00 $155.00/$27.00 PE1P3 DS-3 $72.00 $155.00/$27.00 PE1F2 2-fiber $15.64 $41.56/$29.82 PE1F4 4-fiber Per Cross Connect $.30 28.11 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES 50.53/$38.78 Co-Carrier Cross-Connect (Note 4) PE1ES Fiber Cable Support Structure, existing Per linear foot ft. $0.06 NA Fiber existing PE1DS Copper or Coaxial Cable Support Per linear ft. $0.03 NA Copper Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Per new NA ICB Construction, new Per new construction NA ICB PE1A1 PE1AX PE1AA PE1AR Security Access System Security systemSystem* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per Central Office premises Per Card card Per Card card Per card $52.00 $55.00 $35.00 Per Card $250.00 PE1SR Space Availability Report* Per Central Office Requested premises requested $550.00 POT Bay Arrangements Per cross-connect Prior to 6/1/99 2 PE1PE 2-Wire Cross-Connect 4 $0.40 NA PE1PF 4-Wire Cross-Connect $1.20 NA PE1PG DS1 Cross-Connect $1.20 NA PE1PH DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 XX XX0X0 0 Xxxxx Xxxxx-Xxxxxxx $25.53 NA PE1B4 38.79 XX XX0X0 0 Xxxxx Xxxxx-Xxxxxxx $34.43 52.31 NA AEH Additional Engineering Fee (Note Per request, First /Add’l (Note First/Add’l 5) First half hour/Add’l add’l half hour Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Per half hr./Add’l half hr. PE1BT Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- Overtime NA $48.00/$30.00 PE1PT hour Premium Time NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Interconnection Agreement
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling MaxcessCLEC-1-requested modifications to requests in progress or augmentations to for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC Ground Bar Project Management Cable Racking/Fiber Duct Frame / Aisle lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection $2,400.00 $720.00 Per arrangement $1,675.00 Per arrangement, per square foot NA $100.00 Per arrangement, per square foot Per arrangement ICB ICB ICB Per arrangement ICB PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. $146.80 NA PE1CW Per add’l 50 sq. ft. $170.64 $17.33 NA 14.91 NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA NA PE1BD Cable Installation Per Cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA PE1PL Power -48V DC Power 120V AC Power single phase* phase 240V AC Power single phase* phase 120V AC Power three phase* phase 277V AC Power three phase* phase Per amp Per breaker amp Per breaker amp Per breaker amp $5.00 ICB Per breaker amp $7.14 $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect First / Additional PE1P2 $.30 $19.20/$19.20 PE1P4 $.50 $19.20/$19.20 PE1P1 $8.00 $155.00/$27.00 PE1P3 $72.00 $10.29 155.00/$27.00 PE1F2 $18.50 First / Additional 15.90 $12.60 / 73.00/$52.00 PE1F4 $12.60 28.50 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES 88.00/$67.00 Co-Carrier Cross-Connect (Note 4) PE1ES Fiber Fiber Arrangement Cable Support Structure, existing Structure Per linear foot (existing) $0.06 NA PE1DS Copper Copper or Coaxial Cable Support Structure, existing Arrangement Per linear foot (existing) $0.03 NA (TBD) TBD Cable Support Structure Construction, new Construction Per new construction NA ICB PE1A1 Security Access System Security system* system New Access Card Activation* Activation Administrative change, existing card* card Replace lost or stolen card* card Per Central Office Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 TBD Space Availability Report* Report Per Central Office Requested $550.00 POT Bay Arrangements Per Cross Connect Prior to 6/1/99 PE1PE 2 Wire Cross-Connect $0.40 NA PE1PF 4 Wire Cross-Connect $1.20 NA PE1PG DS1 Cross-Connect $1.20 NA PE1PH DS3 Cross-Connect $8.00 NA PE1B2 2 Fiber Cross-Connect $39.30 NA PE1B4 4 Fiber Cross-Connect $53.00 NA PE1BT Security Escort Basic Time Overtime Per Cross Connect PE1PE 1/2 NA $0.40 41.00/$25.00 PE1OT hour/Additional NA PE1PF $1.20 48.00/$30.00 PE1PT Premium Time Half-hour NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA 55.00/$35.00 AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First half hour/Add’l Basic Time - Half hour $31.00/$22.00 Overtime - $37.00/$26.00 PE1BT Security Escort Basic Time Overtime Premium Time Per 1/2 NA $41.00/$25.00 PE1OT hour/Additional Half- NA $48.00/$30.00 PE1PT hour NA $55.00/$35.00 N/A refers to rate elements which do not have a negotiated rate.
Appears in 1 contract
Samples: Collocation Agreement