Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling Maxcess-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Maxcess agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Per square foot NA $100.00 PE1BW PE1CW Space Enclosure (Note 3) Cages Prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per square foot Per square foot $7.50 $6.75 NA NA PE1BD Cable Installation Per Cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 NA PE1PL Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 PE1F2 PE1F4 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per Cross Connect $.30 $.50 $8.00 $72.00 $10.29 $18.50 First / Additional $12.60 / $12.60 $12.60 / $12.60 $155.00 / $27.00 $155.00 / $27.00 $73.00 / $52.00 $88.00 / $67.00 USOC Rate Element Description Unit Recurring Rate (RC) Non-Recurring Rate (NRC) PE1ES Co-Carrier Cross-Connect (Note 4) Fiber Cable Support Structure, existing Per linear foot $0.06 NA PE1DS Copper or Coaxial Cable Support Structure, existing Per linear foot $0.03 NA (TBD) Cable Support Structure Construction, new Per new construction NA ICB PE1A1 Security Access System Security system* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per Central Office Per Card Per Card $52.00 $55.00 $35.00 Per Card $250.00 Space Availability Report* Per Central Office Requested $550.00 POT Bay Arrangements Prior to 6/1/99 2 Wire Cross-Connect 4 Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per Cross Connect PE1PE $0.40 NA PE1PF $1.20 NA PE1PG $1.20 NA PE1PH $8.00 NA PE1B2 $25.53 NA PE1B4 $34.43 NA AEH Additional Engineering Fee Per request, First /Add’l (Note 5) First h...
Additional Engineering Fee. BellSouth’s engineering and other labor costs associated with establishing the Physical Collocation Arrangement shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling COMPASS-requested modifications to requests in progress or augmentations for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. Page 1 of 4 The following principles provide basic guidance on environmental and safety issues when applying for and establishing Physical Collocation arrangements.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling CLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per request NA $1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Per sq. ft. NA $100.00 XX0XX XX0XX Space Enclosure (Note 3) Requested prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per sq. ft. Per sq. ft. $7.50 $6.75 NA NA PE1BD Cable Installation Per cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 XX XX0XX XX0XX XX0XX XX0XX XX0XX Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 XX0X0 XX0X0 Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per cross connect $0.30 $0.50 $8.00 $72.00 $15.64 $28.11 First/Add’l $12.60/$12.60 $12.60/$12.60 $155.00/$27.00 $155.00/$27.00 $41.56/$29.82 $50.53/$38.78 Co-Carrier Cross-Connect (Note 4) PE1ES Fiber PE1DS Copper (TBD) Fiber Cable Support Structure, existing Copper or Coaxial Cable Support Structure, existing Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction $0.06 $0.03 XX XX XX XXX XX0XX XX0XX XX0XX Security Access System Security System* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per premises Per card Per card Per card $52.00 $55.00 $35.00 $250.00 PE1SR Space Availability Report* Per premises requested $550.00 PE1PE XX0XX XX0XX XX0XX XX0X0 XX0X0 POT Bay Arrangements Prior to 6/1/99 2-Wire Cross-Connect 4-Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per cross-connect $0.40 $1.20 $1.20 $8.00 $38.79 $52.31 NA NA NA NA NA NA AEH Additional Engineering Fee (Note 5) Per request, First half hour/add’l half hour First/Add’l Basic Time $31.00/$22.00 Overtime $37.00/$...
Additional Engineering Fee. BellSouth’s engineering and other labor time associated with establishing the Physical Collocation Arrangement will be billed as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling ALEC, Inc.-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, ALEC, Inc. agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling ALEC, Inc.-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s
Additional Engineering Fee. XxxxXxxxx’s additional engineering, and other labor costs associated with handling ALEC, Inc. requested modifications to requests in progress for Physical Collocation Arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, ALEC, Inc. agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling CTSI-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, CTSI agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. The following principles provide basic guidance on environmental and safety issues when applying for and establishing Physical Collocation arrangements.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling Network Telephone-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Network Telephone agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. Page 1 of 4 The following principles provide basic guidance on environmental and safety issues when applying for and establishing Physical Collocation arrangements.