Adjustments to Installed Capacity Estimate and Required Installed Capacity Sample Clauses

Adjustments to Installed Capacity Estimate and Required Installed Capacity 
AutoNDA by SimpleDocs

Related to Adjustments to Installed Capacity Estimate and Required Installed Capacity

  • Adjustment to Installed Capacity Estimate Permitted reduction

  • Reserved Capacity The maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Part II of the Tariff. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Packet Switching Capability 4.5.1 The packet switching capability network element is defined as the function of routing or forwarding packets, frames, cells or other data units based on address or other routing information contained in the packets, frames, cells or other data units.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity and aircraft type

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Minimum Balance Requirements To be a member and maintain Accounts with Us You must purchase 1 share in the Credit Union. The par value of a share in this Credit Union is $10.00. If the balance in Your primary savings Account drops below 1 share ($10.00), at any time, We may, at Our option, close Your Account. Nonsufficient Funds Returns. Any check or pre-authorized transfer, or transaction made through the use of a debit card, or other electronic means, as is applicable (including any in-person transaction), that is presented to Us for payment on Your Account when Your Account lacks sufficient collected funds to pay any such item may, at Our option, be returned for nonsufficient funds or We may honor any such item and charge You a fee for doing so. Overdraft Balance Calculation. When processing transactions that debit or credit Your Account, We start each Business Day with Your final Account balance from the preceding Business Day. The final balance takes into Account all of the debit and credit transactions that were settled that Business Day pursuant to Our Funds Availability Policy, as well as any other debits or credits to Your Account that were finally settled that day, as described above in the "Deposit of Items" and "Collection and Processing of Items" sections of the Account Agreement. This starting balance at the beginning of a Business Day (the preceding Business Day's final balance) is sometimes referred to as Your "actual balance." As credits and debits to Your Account are received by Us, We add them to and subtract them from Your actual balance. Examples of credits include, but are not limited to, electronic direct deposits, check deposits that have been fully and finally collected, ACH credits that have settled that day, and cash deposits made to one of Our tellers. Examples of debits include, but are not limited to, checks drawn on Your Account that are presented to Us for payment together with such checks that are returned unpaid and subsequently represented for payment, electronic fund transfer (EFT) debit transactions (such as preauthorized payments and settled EFT debits) and all reinitiated electronic fund transfer (EFT) debit transactions (such as preauthorized payments), memo-posted EFT debits (EFT debits that We have authorized but which have not been settled), and all Credit Union fees and charges. As noted above, these examples are not an exhaustive list and should not be construed as such. The result of this calculation at any given point in time is called Your "available balance." For the purpose of determining whether an overdraft has occurred, We use Your available balance. First, We add all of the settled credit transactions to the beginning actual balance. Then, We subtract all of the debit transactions that settled that day. We also subtract all of the pending debit transactions. This determines the available balance for overdraft purposes. Each debit transaction that We process when Your Account has, or will have, a negative available balance is an overdraft, subject to an overdraft charge. Subject to applicable law, You are responsible for paying any overdraft fees and charges assessed in connection with Our payment of an overdraft, as well as any NSF fees charged to Your Account when We dishonor and return an item for non- sufficient funds. It is Your responsibility to know Your Account balance, and if You have any questions You should contact a Credit Union representative.

Time is Money Join Law Insider Premium to draft better contracts faster.