Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.
Toilet Facilities The Employer provides the Contractor access to toilet facilities. Temporary chemical toilets are provided by the Contractor where deemed necessary.
Toilets Papers, dust, cobwebs, peels, cans/bottles, cigarette butts, excrement on floor, bad smells, water pools, leaking sewage, rodents, animals (dead or alive), overflowing sanitary bins. 0 = NOT APPLICABLE 1 = UNACCEPTABLE (Toilets out of order. Toilets not cleaned on daily basis.) 2 = POOR (Toilets cleaned, but still visible signs of dirt, e.g. dust, cobwebs.) 3 = GOOD (Obvious sign that toilets are cleaned daily.) 4 = EXCELLENT (Extra effort is put in to ensure cleanliness, e.g. using detergents.)
Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.
Cleanliness and Safety; Entry Resident agrees to maintain the assigned bedroom space, the apartment and the common areas of the Property in a clean, safe and sanitary condition, to exercise all due care in the use of same, and to cooperate fully with the Property pest control program as requested. Resident will be responsible for the cost of treatment for bedbugs and similar pests to the extent Owner’s pest control vendor reasonably determines that an infestation has originated within Resident’s assigned space and during Resident’s occupancy. Resident will place all trash in provided receptacles and will be responsible for the cost of cleaning the interior or exterior of the apartment if not kept in sanitary condition. When outdoor temperatures are below 40 degrees Fahrenheit, Resident will keep the apartment’s heat turned on to prevent frozen or burst pipes, including during vacations. When outdoor temperatures exceed 85 degrees Fahrenheit, Resident will keep the apartment’s air conditioning turned on and set to a reasonable temperature to prevent mold or mildew growth, including during vacations. Owner and its agents, employees and contractors may enter any apartment and bedroom space to perform routine maintenance, inspections, showings and other ordinary functions, provided that Owner will provide advance notice to residents of an apartment before such entry. Owner reserves the right to enter an apartment and any bedroom space without prior notice (including a passkey and/or disarming the alarm or other means of entry if locks have been changed) for emergency maintenance or repair purposes, or when there is reasonable cause to believe that a situation exists that could cause danger to life, safety, health or property. Owner may confiscate any item deemed to cause a danger and is under no obligation to pay compensation for or to return such items.
Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.
Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.
OCCUPATIONAL HEALTH AND SAFETY 34.01 The parties recognize the need for a safe and healthy workplace. The Employer shall be responsible for providing safe and healthy working conditions. The Employer and Employees will take all reasonable steps to eliminate, reduce or minimize all workplace safety hazards. Occupational health and safety education, training and instruction provided by the Employer, shall be paid at the Basic Rate of Pay, to fulfill the requirements for training, instruction or education set out in the Occupational Health and Safety Act, Regulation or Code. (a) There shall be an Occupational Health and Safety Committee (Committee), which shall be composed of representatives of the Employer and representatives of the Local and may include others representing recognized functional bargaining units. This Committee shall meet once a month, and in addition shall meet within 10 days of receiving a written complaint regarding occupational health or safety. An Employee shall be paid the Employee’s Basic Rate of Pay for attendance at Committee meetings. A request to establish separate committees for each site or grouping of sites shall not be unreasonably denied. The Employer shall provide training at no cost to all Employees on the Committee to assist them in performing their duties on the Committee. Training shall be paid at the Employee’s Basic Rate of Pay. (b) Minutes of each meeting shall be taken and shall be approved by the Employer, the Local, and other bargaining groups, referred to in (a), prior to circulation. (c) The purpose of the Committee is to consider such matters as occupational health and safety and the Local may make recommendations to the Employer in that regard. (d) If an issue arises regarding occupational health or safety, the Employee or the Local shall first seek to resolve the issue through discussion with the applicable immediate supervisor in an excluded management position. If the issue is not resolved satisfactorily, it may then be forwarded in writing to the Committee. (e) The Committee shall also consider measures necessary to ensure the security of each Employee on the Employer’s premises and the Local may make recommendations to the Employer in that regard. (f) (i) Should an issue not be resolved by the Committee, the issue shall be referred to the Chief Executive Officer (CEO). A resolution meeting between the Local and the CEO, or designate(s), shall take place within 21 calendar days of the issue being referred to the CEO. The CEO or designate(s) shall reply in writing to the Local within seven (7) calendar days of the resolution meeting.
Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.