The "Alternate No" clause designates an alternative version or option of a contract provision, typically used when multiple variations of a clause are available for different circumstances. In practice, this clause is labeled with a specific number or identifier (such as "Alternate I" or "Alternate II") to distinguish it from the standard version, and only the selected alternate is included in the final agreement. Its core function is to provide flexibility and customization in contract drafting, ensuring that the most appropriate terms are applied to suit the specific needs of the parties or the project.
Alternate No. Subject to the requirements of the Contract Document and adjustments for the unit prices set forth in the Bid, the Contract Sum to be paid by the District to Contractor for the completion of the Project shall be DOLLARS and CENTS ($ ).
Alternate No. Alternate No. Alternate No. Alternate No. ( ) Adds ( ) Deducts $ ( ) Adds ( ) Deducts $ ( ) Adds ( ) Deducts $ ( ) Adds ( ) Deducts $ ( ) Adds ( ) Deducts $
Alternate No. 20: In lieu of manufacturers specified as base bid, state the amount (cost difference) to be added to the base bid to provide Modular Indoor Central Station Air Handling Units by Trane (no substitutions), as indicated on Drawings and described in Specifications.
Alternate No. 11: In lieu of manufacturers specified as base bid, state the amount (cost difference) to be added to the base bid to provide Emergency Panic Alarm by United Security Products Intrusion Detection by the following manufacturers (no substitutions), as indicated on Drawings and described in Specifications.
Alternate No. 1: Provide a "fire cycle" on-off sprinkler system same as base scheme. Provide a total flooding Halon 1301 fire supression system for the computer room and underfloor area. Provide cross-zoned detection on the ceiling and the underfloor area (four zones). Operation of the underfloor detection system will cause discharge into the underfloor only. Operation of the ceiling detection system will cause discharge of Halon into the room and underfloor. The Halon System shall be a "single-shot", central storage type and piped separately to the ceiling and underfloor nozzles.
Alternate No. 15: In lieu of manufacturers specified as base bid, state the amount (cost difference) to be added to the base bid to provide Plumbing Fixtures by the following manufacturers (no substitutions), as indicated on Drawings and described in Specifications.
1. Alternate No. 15A: Plumbing Fixtures by American Standard, except as follows.
2. Alternate No. 15B: Wall Mounted Lavatories by Kohler
3. Alternate No. 15C: Stainless Steel Sinks by Elkay
4. Alternate No. 15D: Hose ▇▇▇▇▇ by ▇▇▇▇▇▇▇▇
5. Alternate No. 15E: Floor Drains by ▇▇▇▇
6. Alternate No. 15F: Floor Sinks by ▇▇▇▇
7. Alternate No. 15G: Plumbing Valves by ▇▇▇▇▇
8. Alternate No. 15H: Plumbing Valves by ▇▇▇▇
Alternate No. 2 – Errors or Revisions. Prior to the bid opening date and hour, errors may be stricken or revisions may be made and corrections entered on this proposal form or on the bid envelope with sufficient clarity to be easily understood. All such annotations shall be binding on the bidder. No Withdrawal. For and in consideration of the sum of $10.00, the receipt of which is hereby acknowledged, bidder and Owner agree that this bid may not be revoked or withdrawn after the time set for the opening of bids, except as provided in Georgia law, but is an irrevocable offer that shall remain open for acceptance for a period of thirty-five days following the time set for the opening of bids. Execution of the Contract. If bidder is notified in writing by statutory mail of the acceptance of this bid within thirty-five days after time set for the opening of bids, bidder agrees to execute within ten days the Contract for the Work for the above stated Bid, as adjusted by the accepted Alternates, and at the same time to furnish and deliver to the Owner a Performance Bond and a Payment Bond on forms shown in Section 7 of the General Conditions of the Contract, both in an amount of equal to 100 percent of the Contract Sum.
Alternate No. 26A: Siemens APOGEE System as installed by the Siemens Industry branch office
Alternate No. 4: Replace double 2x12 with Flitch Plate with Double 16” LVLS as noted on sheet S101, under detail 2.
Alternate No. 18: In lieu of manufacturers specified as base bid, state the amount (cost difference) to be added to the base bid to provide Boilers by Weil McLain (no substitutions), as indicated on Drawings and described in Specifications.