ANNUAL GRANT REVIEW. 6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions. 6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes): 6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans; 6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year; 6.2.3. the outputs, Milestones and KPIs should be re-defined and agreed; 6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities; 6.2.5. the Authority should recover any Unspent Monies; 6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions. 6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply. 6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 4 contracts
Samples: Grant Funding Agreement, Grant Funding Agreement, Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annuallyquarterly or annually as appropriate. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and or annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 3 contracts
Samples: Grant Funding Agreement, Grant Funding Agreement, Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 2 contracts
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 2 contracts
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 7.1.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
6.5. The Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 2 contracts
Samples: Youth Justice Grant Funding Agreement, Youth Justice Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annuallyin each financial year. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 2 contracts
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions7.2.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions25.11.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 paragraphs 25.4 to 26.10 25.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant quarterly and annually. The Authority It will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 2 of these Conditions this Grant Funding Agreement. As part of the annual review the Authority will review the reports produced by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 25.17 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 25.6 to 26.10 25.11 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant quarterly and annually. The Authority It will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 2 of these Conditions this Grant Funding Agreement. As part of the annual review the Authority will review the reports produced by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 25.17 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 25.6 to 26.10 25.11 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions Agreed Outputs by the Grant Recipient in accordance with paragraph 7.2 7.1.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs Agreed Outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annuallyin each financial year. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. 6.2.1 the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. 6.2.2 there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. 6.2.3 the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. 6.2.4 the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. 6.2.5 the Authority should recover any Unspent Monies;
6.2.6. 6.2.6 the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 6.2.3, the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority It will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions this Grant Funding Agreement. As part of the annual review the Authority will review the reports produced by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 25.17 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 25.6 to 26.10 25.11 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annuallyat the intervals specified in the Grant Funding Letter. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 4 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 5 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Agreement
ANNUAL GRANT REVIEW.
6.17.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 8.2 of these Conditions.
6.27.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.17.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.27.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year, and / or to the Maximum Sum;
6.2.37.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.47.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.57.2.5. the Authority should recover any Unspent Monies;; and / or
6.2.67.2.6. the Grant be terminated in accordance with paragraph 26.11 27.11 of these Conditions.
6.37.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 7.2.4 the Remedial Action Plan process set out in paragraph 26.4 27.4 to 26.10 27.10 shall apply.
6.47.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.27.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 25.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 25.4 to 26.10 25.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly quarterly, stage gate and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of 26.11of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 Error! Reference source not found. of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 Error! Reference source not found. of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement
ANNUAL GRANT REVIEW.
6.1. The Authority will review the Grant annually. The Authority will take into account the Grant Recipient’s delivery of the Funded Activities against the agreed outputs set out in Annex 6 of these Conditions by the Grant Recipient in accordance with paragraph 7.2 of these Conditions.
6.2. Each quarterly and annual review may result in the Authority deciding that (for example a non-exclusive list includes):
6.2.1. the Funded Activities and the Grant Funding Agreement should continue in line with existing plans;
6.2.2. there should be an increase or decrease in the Grant for the subsequent Financial Year;
6.2.3. the outputs, Milestones and KPIs outputs should be re-defined and agreed;
6.2.4. the Grant Recipient should provide the Authority with a draft remedial action plan Remedial Action Plan setting out the steps the Grant Recipient will take to improve delivery of the Funded Activities;
6.2.5. the Authority should recover any Unspent Monies;
6.2.6. the Grant be terminated in accordance with paragraph 26.11 of these Conditions.
6.3. If the Grant Recipient is required to submit a draft remedial action plan Remedial Action Plan in accordance with paragraph 6.2.4 the Remedial Action Plan process set out in paragraph 26.4 to 26.10 shall apply.
6.4. The Grant Recipient may make representations to the Authority regarding the Authority’s decision made in accordance with paragraph 6.2. The Authority is not however obliged to take such representations into account when making its decision as any such decision will be final and at the Authority’s absolute discretion.
Appears in 1 contract
Samples: Grant Funding Agreement