Assumptions and Clarifications. Our proposal for architectural and engineering design and construction support services for the TFC Capitol Complex CUP and Tunnel project is based on the following assumptions:
1. Expenses for internal reproduction, postage, travel to the site, meals, etc. are included in the proposed lump sum fee.
Assumptions and Clarifications. Consultant will participate in weekly construction meetings for approximately 12 weeks of pre-construction and construction time.
Assumptions and Clarifications. 4.1. PM and Owner agree that PM’s services are limited to the (4) bid packages for the site as follows:
Assumptions and Clarifications. A. It is assumed the City’s Master Thoroughfare Plan will be amended to classify Lovers Lane as a minor collector. The scope of services is based on a minor collector roadway section.
B. It is anticipated the existing ornamental fence on the Xxxxxxx Tract will need to be relocated due to the road widening. This scope of services does not include design effort for the fence relocation. Basic Services Data Collection, Study, Report and Planning 25.00% $118,125.00 Lump Sum Preliminary Design Phase 25.00% $118,125.00 Lump Sum Final Design Phase 25.00% $118,125.00 Lump Sum Bidding Phase 5.00% $23,625.00 Lump Sum Construction Administration Phase 17.50% $82,688.00 Lump Sum Closeout (Record Drawings) 2.50% $11,813.00 Lump Sum Totals 100.00% $472,501.00 A. Franchise Utility Coordination $5,000.00 Hourly B. Design Survey and Boundary Verifications $45,250.00 Lump Sum C. Separate Instrument Easements $24,000.00 Budget Estimate D. Utility Locating $29,370.00 Lump Sum E. Geotechnical Investigation $38,060.00 Lump Sum F. Right‐of‐Way and Easement Acquisition $75,000.00 Budget Estimate G. Hydrologic and Hydraulic Study $59,400.00 Lump Sum H. Traffic Studies $51,700.00 Lump Sum I. Structural Engineering $11,000.00 Lump Sum J. TAS TDLR $2,750.00 Reimbursable Reimbursables $5,000.00 Totals $342,530.00 Total Engineering Agreement $819,031.00 Notes:
1. Sixteen (16) Separate Instrument Easements are budgeted at $1,500.00 per each.
Assumptions and Clarifications. A. The scope of services does not include design effort for the traffic light at the Xxxxxx Road and Ranch Road intersection. It is assumed TxDOT will be responsible for any modifications to the traffic signal to accommodate the additional Ranch Road lanes. PMLS will coordinate with TxDOT, as required.
Assumptions and Clarifications. A. The scope of services will be performed and executed concurrent with the Estate Lane Drainage and Crosswalk Improvements Project including the design, bidding, and construction.
B. The TAS TDLR review / registration and TxDOT UIR permit will be submitted with the Estate Lane Drainage and Crosswalk Improvements project.
Assumptions and Clarifications. DELIVERABLE USE AND REUSE. Any reuse of completed documents or use of partially completed documents without written verification or concurrence by Carollo for the specific purposes intended will be at the City’s sole risk and without liability or legal exposure to Carollo. Xxxxxxx’x instruments of service hereunder are the printed hard copy of technical memorandums and reports issued for the Project, whereas electronic media, including Computer Aided Design and Drafting (CADD) or modeling files, are tools for their preparation. As a convenience to the City, Carollo shall furnish to the City both printed hard copies and electronic media (where scoped). In the event of a conflict in their content, the printed hard copies shall take precedence over the electronic media. Because data stored in electronic media form can be altered, inadvertently, it is agreed that the City shall hold Carollo harmless from liability arising out of changes or modifications to Xxxxxxx’x data in electronic media form in the City’s possession or released to others by the City. • STANDARD OF CARE. Carollo shall perform the services required hereunder in accordance with the prevailing engineering standard of care by exercising the skill and ability ordinarily required of engineers performing the same or similar services, under the same or similar circumstances, in the State of California. Additionally, Carollo shall not be responsible for acts and decisions of third parties, including governmental agencies, other than Xxxxxxx’x subconsultants, that impact project completion and/or success. • CITY-PROVIDED INFORMATION AND SERVICES. The City shall furnish Carollo available studies, reports and other data pertinent to Xxxxxxx’x services; obtain or authorize Carollo to obtain or provide additional reports and data as required; furnish to Carollo services of others required for the performance of Xxxxxxx’x services hereunder, and Carollo shall be entitled to use and rely upon all such information and services provided by the City or others in performing Xxxxxxx’x services under this Agreement.
Assumptions and Clarifications. In preparing the scope of work for this proposal, Millennia has made the following assumptions and clarifications:
Assumptions and Clarifications. Plans and Specifications will be developed per HCAA and other permitting agencies standards and guidelines.
Assumptions and Clarifications. Spin bonnet machines are prohibited for carpet care as well as Freon and similar products that freeze gum for removal. • Pile lifters and highly efficient vacuums are required. • Hot water spot extract all spills occurring during operating hours under full service Custodial and perform additional thorough cleaning during the overnight hours. • This task may not be subcontracted. • Custodial work in the Station 33 Fire Station must be completed between 1PM and 9:00 PM