Avoided Energy Supply Components Study Update Sample Clauses

Avoided Energy Supply Components Study Update. The Settling Parties acknowledge that the New England states expect completion of a new Avoided Energy Supply Components (“AESC”) study during the first half of 2021, which will provide updated values for the marginal avoided costs of electricity, natural gas, and other resources to be applied to the NH Utilities’ benefit cost models for the energy efficiency and active demand reduction programs. When the updated values for marginal avoided costs become available, the NH Utilities will update the AESC 2018 values currently used in their benefit cost models, apply the values from AESC 2021 to program years 2022 and 2023, and seek Commission approval for such revisions. The NH Utilities agree that these new calculations shall be used to report actual results in 2022 and 2023. However, the 2021 benefits calculations, based on AESC 2018, shall not be changed for either updating planned benefits goals or for reporting 2021 actual results. The NH Utilities shall submit amended attachments and benefit cost models to account for the AESC 2021 updates to the Commission by September 1, 2021. Amendments shall be limited to the avoided cost updates resulting from the AESC 2021 study and reflection of this change in the calculation of the component of the performance incentive. Amended attachments to the 2021-2023 Plan shall serve as a notification and automatic update of the 2021-2023 Plan but shall not require the Commission to commence a proceeding.
AutoNDA by SimpleDocs

Related to Avoided Energy Supply Components Study Update

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones:

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Drug Test The compulsory production and submission of urine and/or blood, in accordance with departmental procedures, by an employee for chemical analysis to detect prohibited drug usage.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • Escrow Format Specification 3.1. Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!