Common use of Basic Design and Installation Requirements for Using Municipal Facilities Clause in Contracts

Basic Design and Installation Requirements for Using Municipal Facilities. All of Licensee’s construction and installation work for its Small Cell Equipment on the Municipal Facilities shall be performed at Licensee’s sole cost and expense and in a good and workmanlike manner and promptly completed. When Licensee and Licensor have agreed on an existing Municipal Facility location as a suitable site for Licensee’s Small Cell Equipment, but the existing Municipal Facility needs to be replaced to accommodate the Small Cell Equipment, then the Site Supplement shall so specify and Licensee shall pay all costs related to replacing the Municipal Facility, including but not limited to installation of the replacement pole (the “Replacement Pole”), transfer of the streetlight fixtures, and/or other items attached to the existing Municipal Facility to the Replacement Pole, and removal and salvage of the existing Municipal Facility to the Licensor. Payment of the pole replacement costs does not provide Licensee with any ownership interest in the Replacement Pole. Licensor will be deemed to own the original Municipal Facility and the Replacement Pole. The installation or attachment of the Small Cell Equipment using the Replacement Pole shall be at Licensee’s sole cost and expense.

Appears in 3 contracts

Samples: Non Exclusive License Agreement, Non Exclusive License Agreement, Non Exclusive License Agreement

AutoNDA by SimpleDocs

Basic Design and Installation Requirements for Using Municipal Facilities. All of Licensee’s construction and installation work for its Small Cell Equipment on the Municipal Facilities shall be performed at Licensee’s sole cost and expense and in a good and workmanlike manner and promptly completed. When Licensee and Licensor have agreed on an existing Municipal Facility location as a suitable site for Licensee’s Small Cell Equipment, but the existing Municipal Facility needs to be replaced to accommodate the Small Cell Equipment, then the Site Supplement shall so specify and Licensee shall pay all costs related to replacing the Municipal Facility, including but not limited to installation of the replacement pole (the “Replacement Pole”), transfer of the streetlight fixtures, and/or other items attached to the existing Municipal Facility to the Replacement Pole, and removal and salvage of the existing Municipal Facility to the Licensor. Payment of the pole replacement costs does not provide Licensee with any ownership interest in the Replacement Pole. Licensor will be deemed to own the original Municipal Facility and Replacement Pole in its “AS IS” condition without any representation or warranty of any kind, provided that the Replacement PolePole is installed in accordance with a Site Supplement and passes Licensor inspection. The installation or attachment of the Small Cell Equipment using the Replacement Pole shall be at Licensee’s sole cost and expense.

Appears in 2 contracts

Samples: Non Exclusive License Agreement, Non Exclusive License Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.