Basic Requirements for Reservoir Dispatching. (1) Party B shall provide the design documents, operation statistic data and operation summary of the Power Plant according to the requirements of Party A. (2) The Power Plant shall provide the annual scheme for passing the flood season to the Power Dispatching Agency before April 20 of each year, pay close attention to the meteorological changes in the drainage area during the flood season, timely provide information on the water conditions and relevant conditions concerning flood control, and make proper short-term flood prediction. In case of material flood or disastrous climate, Party B shall notify Party A in a timely manner. (3) Party B shall transmit real time operation information of the reservoir and the unit according to the requirements of Party A. (4) The water level of the reservoir shall be controlled according to the designed dispatching diagram or the reservoir water level fluctuation plan determined by both Parties through consultations, to ensure that the Power Plant shall not operate when the water level falls below the designed dead water level. Generally, the reservoir water level at the end of flood season of each year should reach the normal storage level. (5) On the premise of ensuring the dam safety of the Power Plant and the equipment safety of the Power Plant, the comprehensive effectiveness of the Power Plant and its frequency modulation, peak regulation and the standby for accident functions on the power grid should be brought into full play. (6) Both Parties shall cooperate with each other and take joint endeavors to make full use of water resources and generate more power with less water wasted. In case of contradictions between the reservoir safety and utilization, the former shall be given the priority.
Appears in 4 contracts
Samples: Grid Connection and Dispatching Agreement (China Hydroelectric Corp), Grid Connection and Dispatching Agreement (China Hydroelectric Corp), Grid Connection and Dispatching Agreement (China Hydroelectric Corp)
Basic Requirements for Reservoir Dispatching. (1) Party B shall provide the design documents, operation statistic data and operation summary of the Power Plant according to the requirements of Party A.
(2) The Power Plant shall provide the annual scheme for passing the flood season to the Power Dispatching Agency before April 20 of each year, pay close attention to the meteorological changes in the drainage area during the flood season, timely provide information on the water conditions and relevant conditions concerning flood control, and make proper short-term flood prediction. In case of material flood or disastrous climate, Party B shall notify Party A in a timely manner.
(3) Party B shall transmit real time operation information of the reservoir and the unit units according to the requirements of Party A.
(4) The water level of the reservoir shall be controlled according to the designed dispatching diagram or the reservoir water level fluctuation plan determined by both Parties through consultations, to ensure that the Power Plant power plant shall not operate when the water level falls below the designed dead water level. Generally, the reservoir water level at the end of flood season of each year should reach the normal storage level.
(5) On the premise of ensuring the dam safety of the Power Plant and the equipment safety of the Power Plant, the comprehensive effectiveness of the Power Plant and its frequency modulation, peak regulation and the standby for accident functions on the power grid should be brought into full play.
(6) Both Parties shall cooperate with each other and take joint endeavors to make full use of water resources and generate more power with less water wasted. In case of contradictions between the reservoir safety and utilization, the former shall be given the priority.
Appears in 2 contracts
Samples: Grid Connection and Dispatching Agreement (China Hydroelectric Corp), Grid Connection and Dispatching Agreement (China Hydroelectric Corp)