Bone Mineral Density Sample Clauses

Bone Mineral Density. To be eligible for randomization and entry into the Treatment Period, each patient must have a BMD T-score < -2.5 and > -5.0 at the lumbar spine or hip by dual energy x-ray absorptiometry (DXA). Postmenopausal women older than 65 who meet the fracture criteria but have a T-score < -2.0 and > -5.0 may be enrolled as well as women older than 65 who do not meet the fracture criteria but who do have a T-score <-3.0 and > -5.0. All patients will have BMD measurements taken via DXA during the Screening (Visit 1) and Pretreatment (Visit 2) Periods and during the Treatment Period (Visits 6, 8 and 9). However, in the event that qualifying BMD scans have been obtained as a consequence of routine patient care within 3 months prior to the Screening visit and comply with the study DXA procedures, such scans may be used for assessment of eligibility and need not be redone at Screening. The initial DXA will be performed during the Screening Period and will be used to determine eligibility for participation in the study in conjunction with the radiological evaluations of fractures. The DXA is to be performed on the hip (femoral neck) and spine (L1-L4) at this visit and a qualifying T-score from either location can be used to determine eligibility. The spinal DXA is to be taken in the postero-anterior projection with any subsequent spinal DXA to be taken in the same projection. Patients who meet the entry criterion for BMD who satisfy all other eligibility criteria, and who have no exclusionary findings, will then be enrolled. On Day 1, a subset of 300 patients per group will have a wrist DXA scan. BMD measurements by DXA will be repeated at the lumbar spine (L1-L4), hip, and wrist during the Treatment Period (Visits 6, 8 and 9). Details regarding the procedures for the conduct and processing of DXA scans will be provided in separate instruction manual. Patient eligibility will be determined based on local analysis of the BMD scan at the study site. The Central Imaging CRO will subsequently confirm the acceptability of each DXA scan with the study sites. If any scan is unacceptable for technical or other reasons, a repeat scan must be completed as soon as possible. Investigators will be blinded to the results of all follow-up DXA scan results throughout the study unless a safety issue is identified by the independent radiologist. If the independent radiologist identifies any patient who shows a continuing significant deterioration from baseline (>7%) of BMD at spine or hip...
AutoNDA by SimpleDocs
Bone Mineral Density. All subjects will have bone mineral density measurements (BMD) taken via DXA at Month 6 and at Month 24. The End-of-Treatment (Visit 9) bone mineral density tests for Study BA058-05-003 will serve as the baseline BMD measurements for Study BA058-05-005. DXAs will be performed on the hip (femoral neck) and spine (L1-4). The spinal DXA is to be taken in the postero-anterior (PA) projection with any subsequent spinal DXA to be taken in the same projection. Subjects who underwent wrist DXAs in Study BA058-05-003 will also have wrist DXAs performed at Month 6 and Month 24. The same side of the hip and wrist that were used in Study BA058-05-003 must be used for the DXA scan, and the same scanner should be used throughout the study, when possible.
Bone Mineral Density. All subjects will have bone mineral density measurements (BMD) taken via DXA at Months 6, 12, 18, and 24. The End-of-Treatment (Visit 9) bone mineral density tests for Study BA058-05-003 will serve as the baseline BMD measurements for Study BA058-05-005. DXAs will be performed on the hip (femoral neck) and spine (L1-4). The spinal DXA is to be taken in the postero-anterior (PA) projection with any subsequent spinal DXA to be taken in the same projection. Subjects who underwent wrist DXAs in Study BA058-05-003 will also have wrist DXAs performed at Months 6, 12, 18, and 24. The same side of the hip and wrist that were used in Study BA058-05-003 must be used for the DXA scan, and the same scanner should be used throughout the study, when possible. If the independent radiologist identifies any patient who shows a continuing significant deterioration from the Day 1 assessment of Study BA058-05-005 (>7%) of BMD at spine or hip during the study, the study physician will be notified, the assessment will be repeated and, if confirmed, the patient will be discontinued from the study. The study physician will make this determination on the basis of the centrally read DXA relative to the baseline measurement in consultation with the Sponsor Medical Monitor.

Related to Bone Mineral Density

  • Minerals The seller’s share of minerals (if any) will NOT transfer with the surface at closing.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Oil and Gas Properties The Borrower will and will cause each Subsidiary to, at its own expense, do or cause to be done all things reasonably necessary to preserve and keep in good repair, working order and efficiency all of its Oil and Gas Properties and other material Properties including, without limitation, all equipment, machinery and facilities, and from time to time will make all the reasonably necessary repairs, renewals and replacements so that at all times the state and condition of its Oil and Gas Properties and other material Properties will be fully preserved and maintained, except to the extent a portion of such Properties is no longer capable of producing Hydrocarbons in economically reasonable amounts. The Borrower will and will cause each Subsidiary to promptly: (i) pay and discharge, or make reasonable and customary efforts to cause to be paid and discharged, all delay rentals, royalties, expenses and indebtedness accruing under the leases or other agreements affecting or pertaining to its Oil and Gas Properties, (ii) perform or make reasonable and customary efforts to cause to be performed, in accordance with industry standards, the obligations required by each and all of the assignments, deeds, leases, sub-leases, contracts and agreements affecting its interests in its Oil and Gas Properties and other material Properties, (iii) cause each Subsidiary to do all other things necessary to keep unimpaired, except for Liens described in Section 9.02, its rights with respect to its Oil and Gas Properties and other material Properties and prevent any forfeiture thereof or a default thereunder, except to the extent a portion of such Properties is no longer capable of producing Hydrocarbons in economically reasonable amounts and except for dispositions permitted by Sections 9.16 and 9.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • Mineral Reserves and Resources The estimated proven and probable mineral reserves and estimated indicated, measured and inferred mineral resources disclosed in the Company Public Documents since December 31, 2006 have been prepared and disclosed in all material respects in accordance with accepted engineering practices and all applicable Laws. There has been no material reduction in the aggregate amount of estimated mineral reserves, estimated mineral resources or mineralized material of the Company and the Company Subsidiaries, taken as a whole, from the amounts disclosed in the Company Public Documents since December 31, 2006.

  • Fuel The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 per litre (which includes a service component).

  • Alpine Areas As of 1 October 2020 the Employer shall pay an Alpine disability allowance of $3.85 worked on Projects in alpine areas. These allowances will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • ESTIMATED / SPECIFIC QUANTITY CONTRACTS Estimated quantity contracts, also referred to as indefinite delivery / indefinite quantity contracts, are expressly agreed and understood to be made for only the quantities, if any, actually ordered during the Contract term. No guarantee of any quantity is implied or given. With respect to any specific quantity stated in the contract, the Commissioner reserves the right after award to order up to 20% more or less (rounded to the next highest whole number) than the specific quantities called for in the Contract. Notwithstanding the foregoing, the Commissioner may purchase greater or lesser percentages of Contract quantities should the Commissioner and Contractor so agree. Such agreement may include an equitable price adjustment.

  • Natural Gas 21.1 Subject to Article 21.2, the Indian domestic market shall have the first call on the utilisation of Natural Gas discovered and produced from the Contract Area. Accordingly, any proposal by the Contractor relating to Discovery and production of Natural Gas from the Contract Area shall be made in the context of the Government's policy for the utilisation of Natural Gas and shall take into account the objectives of the Government to develop its resources in the most efficient manner and to promote conservation measures. 21.2 The Contractor shall have the right to use Natural Gas produced from the Contract Area for the purpose of Petroleum Operations including reinjection for pressure maintenance in Oil Fields, gas lifting and captive power generation required for Petroleum Operations. 21.3 For the purpose of sales in the domestic market pursuant to this Article 21, the Contractor shall have freedom to market the Gas and sell its entitlement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!