Common use of Central Energy Plant Clause in Contracts

Central Energy Plant. Class C The cost estimates of the CEP are based on the following:  2013 supplier quotations for 4 x 2.5 MW Heat Recovery Heat Pumps and 3.4 MW Non-condensing Natural Gas Boiler;  Electrical consultant estimate for the Electrical Balance of Plant;  KWL expertise for the Mechanical Balance of Plant; and  Scaling of the 85% design cost estimate of the UBC Combined Heat and Power Plant for Mechanical and Electrical Services as well as Building, Structure and Site Work. General conditions have been estimated between 3% and 7% of capital costs, engineering between 10% and 15%, and contingency between 10% and 20%, depending on the level of detail and uncertainty of the associated capital cost. The higher rates apply to all Building, Structure and Site Work costs, since the location for the CEP has not been finalized. Site Work costs include 250 m of supply and return HDPE piping to connect the TRIUMF Cooling Towers to the CEP.

Appears in 3 contracts

Samples: Agreement, Infrastructure Agreement, Infrastructure Agreement

AutoNDA by SimpleDocs

Central Energy Plant. Class C The cost estimates of the CEP are based on the following: 2013 supplier quotations for 4 x 2.5 MW Heat Recovery Heat Pumps and 3.4 MW Non-condensing Natural Gas Boiler; Electrical consultant estimate for the Electrical Balance of Plant; KWL expertise for the Mechanical Balance of Plant; and Scaling of the 85% design cost estimate of the UBC Combined Heat and Power Plant for Mechanical and Electrical Services as well as Building, Structure and Site Work. General conditions have been estimated between 3% and 7% of capital costs, engineering between 10% and 15%, and contingency between 10% and 20%, depending on the level of detail and uncertainty of the associated capital cost. The higher rates apply to all Building, Structure and Site Work costs, since the location for the CEP has not been finalized. Site Work costs include 250 m of supply and return HDPE piping to connect the TRIUMF Cooling Towers to the CEP.

Appears in 1 contract

Samples: Infrastructure Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.