CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 15 contracts
Samples: Otherwise Noted, Sale, State Unless Otherwise Noted
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 6 contracts
Samples: Sale, www.dnr.wa.gov, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 4 contracts
Samples: Sale, www.dnr.wa.gov, Sale
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run roads. Wheel track rutting exceeds 4 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 4 contracts
Samples: Sale, Cannectivity Agreement, All State Unless Otherwise Noted
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 2 inches on pit run roads. Surface or base stability problems persistWheel track rutting exceeds 4 inches on native surface roads. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 4 contracts
Samples: Sale, Sale, Non Drivable
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 4 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 4 contracts
Samples: Sale, Sale, Otherwise Noted
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. Wheel track rutting exceeds 4 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 3 contracts
Samples: All State Unless Otherwise Noted, www.dnr.wa.gov, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 3 contracts
Samples: State Unless Otherwise Noted, State Unless Otherwise Noted, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 4 inches on any roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 3 contracts
Samples: Culvert and Drainage List, Culvert and Drainage List, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. Wheel track rutting exceeds 4 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 3 contracts
Samples: Sale, www.dnr.wa.gov, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. ▪ Wheel track rutting exceeds 2 inches on crushed rock roads. ▪ Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 2 contracts
Samples: Sale, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on roads. ▪ Wheel track rutting exceeds 4 inches on native surface roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 2 contracts
Samples: www.dnr.wa.gov, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. DRAFT In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 2 contracts
Samples: www.dnr.wa.gov, Harvest Area Approx
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G-220.1 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. Wheel track rutting exceeds 2 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 2 contracts
Samples: www.dnr.wa.gov, www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 2 contracts
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run roads. Surface Wheel track rutting exceeds 4 inches on crushed rock or base stability problems persistnative surface roads. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 2 contracts
Samples: Sale, State U1n4less
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G−220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right−of−way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 2 contracts
Samples: Sale, State Unless Otherwise Noted
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. Wheel track rutting exceeds 2 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.. DRAFT
Appears in 1 contract
Samples: Sale
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 2 inches on pit run roads. Surface or base stability problems persist▪ Wheel track rutting exceeds 4 inches on native surface roads. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.. DRAFT
Appears in 1 contract
Samples: Sale
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on any roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. <Before and during any suspension, Purchaser shall protect the work from damage or deterioration.>
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G−220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right−of−way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads or native surface roads. ▪ Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator Administrator, excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: Cannectivity Agreement
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 4 inches on crushed rock roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from any damage or deterioration.
Appears in 1 contract
Samples: Sale
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. Wheel track rutting exceeds 4 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.. DRAFT
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. Wheel track rutting exceeds 2 inches on crushed rock roads. DRAFT Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. Wheel track rutting exceeds 2 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on all roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G−220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right−of−way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on ballast roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: State Unless Otherwise Noted
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 4 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 4 inches on pit run roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: Unit 3a
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on jaw run or pit run roads. Wheel track rutting exceeds 4 inches on crushed rock roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on jaw run roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on roads3 inches. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G−220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right−of−way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 4 inches on native surface roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: Sale
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 2 inches on pit run roads. Surface or base stability problems persist▪ Wheel track rutting exceeds 4 inches on native surface roads. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on pit run roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: Private Ownership
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 4 inches on pit run roads. Surface or base stability problems persist▪ Wheel track rutting exceeds 4 inches on native surface roads. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. DRAFT Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: Sale
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G−220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right−of−way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 inches on pit run, jaw run, or native surface roads. ▪ Wheel track rutting exceeds 2 inches on crushed rock roads. ▪ Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.. DRAFT
Appears in 1 contract
Samples: All State Unless Otherwise Noted
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on roads4 inches. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 6 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov
CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: ▪ Wheel track rutting exceeds 6 4 inches on crushed rock roads. ▪ Surface or base stability problems persist. ▪ Weather is such that satisfactory results cannot be obtained in an area of operations. ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.
Appears in 1 contract
Samples: www.dnr.wa.gov