Coloured HDPE Sample Clauses

Coloured HDPE. The results for the sorting of the coloured HDPE fraction are given in Figure 7 below. As with the natural HDPE, a single pass was used and the target material was ejected NIR Coloured HDPE 92% Coloured HDPE Waste 8% Yield 94% Purity of feed 92% Purity of product 95% Increase inpurity +3% Figure 7 results from coloured HDPE sorting The quality of the coloured HDPE was already high at 92% pure, however the purity was increased to the target of 95% with only a small loss of material, achieving a 94% yield. No issues are seen therefore in sorting this material
AutoNDA by SimpleDocs

Related to Coloured HDPE

  • Colour The CPA Xxxx primary colour palette is CMYK four-colour process, as follows: CPA blue, CPA light blue, CPA green, CPA light green. CPA Blue is PMS 293; C100 M52 Y0 K0; R0 G111 B186; HEX#006FBA; CPA Light Blue is PMS 633; C100 M0 Y10 K25; R0 G115 B151, HEX#007397; CPA Green is PMS 347; C100 M0 Y86 K3; R0 G154 B73; HEX#009A49; CPA Light Green is PMS 361; C69 M0 Y100 K0; R67 G176 B42; HEX#43B02A. It is recommended that in most applications the CPA Xxxx appear in full colour. When full colour is not available, the CPA Xxxx xxx appear in greyscale, in accordance with the guidelines in (d) below). For purposes of maintaining a consistent corporate image the CPA Xxxx must never appear in any other colours.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Screening 3.13.1 Refuse containers located outside the building shall be fully screened from adjacent properties and from streets by means of opaque fencing or masonry walls with suitable landscaping.

  • PROCUREMENT CARD The State has entered into an agreement for purchasing card services. The Purchasing Card enables Authorized Users to make authorized purchases directly from a Contractor without processing Purchase Orders or Purchase Authorizations. Purchasing Cards are issued to selected employees authorized to purchase for the Authorized User and having direct contact with Contractors. Cardholders can make purchases directly from any Contractor that accepts the Purchasing Card. The Contractor shall not process a transaction for payment through the credit card clearinghouse until the purchased Products have been shipped or services performed. Unless the cardholder requests correction or replacement of a defective or faulty Product in accordance with other Contract requirements, the Contractor shall immediately credit a cardholder’s account for Products returned as defective or faulty.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • FABRICATION Making up data or results and recording or reporting them.

  • Scoring The number of routes each company operates (Route # 0001-2999, 8000-8199) will be multiplied by 2 to determine the daily number of trips. (Only accidents, breakdowns and service reports related to routes falling in this range will be used for the evaluation). The daily number of trips will be multiplied by 175 to arrive at the annual number of trips. The number of accidents, breakdowns and service complaints will be divided by the total number of trips to calculate a percent figure. Each company’s percentage will be compared to the total average. See below for a sample. BUS COMPANY NUMBER OF TOTAL BKDN PERCENT ACCIDENTS PERCENT2 SERVICE PERCENT3 ROUTES TRIPS BKDN ACCIDENTS REPORTS COMPLAINTS TO TRIPS TO TRIPS TO TRIPS A 360 58680 3 0.01% 27 0.05% 46 0.08% B 48 7824 3 0.04% 4 0.05% 39 0.50% C 123 20049 11 0.05% 9 0.04% 27 0.13% D 91 14833 0.00% 10 0.07% 11 0.07% E 124 20212 20 0.10% 19 0.09% 18 0.09% TOTALS 746 121598 37 0.03% 69 0.06% 141 0.12% To score, if a company’s percentage is less than or equal to the total percentage for that category, the company will be awarded 6 points per category. Percentages greater than the total percentage for each distinct category (Accident, Breakdown, Service Complaints) will be scored according to the following scale: Vendor Category Percent Points Less than-Equal to Ave. 6 points 0-3% above average 5 points 4-7% above average 4 points 5-8% above average 3 points 9-12% above average 2 points 13-16% 1 points Greater than 17% 0 points Example: Company A had a lower percent of breakdowns than the average total, and would receive 6 points for breakdowns. If a company has a higher percentage than the average total, 0 point will be added to their score. Company B would not receive 6 points for breakdowns. The same calculation would be performed for accidents and service complaints. Any circumstance whereby a Breakdown or Accident is found by PTS to be ‘Non Reported’ by vendor within the required timeframe (see G-36) will count as (20) ‘Reported’ instances for the purpose of this Contractor Evaluation Scoring.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

Time is Money Join Law Insider Premium to draft better contracts faster.