Composite Sampling Systems Sample Clauses

Composite Sampling Systems. Composite sampling systems shall be installed and operated in accordance with GPA Standard 2174. The composite sampler shall be operated to collect flow-proportional samples only when there is flow through the meter. These samples shall be accumulated in and removed from single-piston cylinders with mixing capability. Storage Lease (Enterprise Products NGL Marketing)
AutoNDA by SimpleDocs
Composite Sampling Systems. Composite sampling is required for Raw Make transacted on a Component Barrel basis and for quality verification of any Raw Make. The composite sampling system shall be installed and operated in accordance with GPA Standard 2174. The composite sampler shall be operated to collect flow-proportional samples, based on indicated volume. These samples shall be accumulated in and removed from floating-piston cylinders with mixing capability.

Related to Composite Sampling Systems

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Building Systems The term “Building Systems” means all systems serving the Building in general, including, but not limited to, the fire/life safety, electrical, plumbing, HVAC, including all components thereof and related equipment, but excluding any equipment that is separately installed by or on behalf of Tenant and any distribution systems or equipment existing within the Premises.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

  • Measurement and Monitoring Tools As of the Effective date, Vendor and Prudential will mutually agree on the measurements and service level management procedures, pursuant to the governance procedures set forth in Attachment G and performance standards set forth in Attachment E-1 and E-2, to measure Vendor's performance of the Services against the applicable Service Levels. Such measurement and monitoring tools and procedures will (a) for Attachment E-1, be implemented upon the Effective Date; (b) for Attachment E-2, be implemented after successful completion of all testing and written acceptance by Prudential of the Transition Services set forth in Attachment B-1; (c) permit reporting at a level of detail sufficient to verify compliance with the Service Levels; and (d) be subject to audit by Prudential or its designee in accordance with the Agreement, except such audit will not include the installation of any audit software on Vendor's network.

  • Interfaces 1 2 wire i/f (towards PSTN) -------------------------------------------------------------------------------------------------------- 2 2 wire i/f (towards standard handset) -------------------------------------------------------------------------------------------------------- 2.2 FUNCTIONS -------------------------------------------------------------------------------------------------------- 1 Selective Call -------------------------------------------------------------------------------------------------------- 2 Conference Call (up to four participants) ----------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 3 MANAGEMENT COMMUNICATION -------------------------------------------------------------------------------------------------------- 3.1 COMMUNICATION INTERFACES see OPTera Product Description SEC. 5.2.3 - Standard Communications Interfaces and SEC.7.3 - Management Communication -------------------------------------------------------------------------------------------------------- 1 F- Interface (RS 232) -------------------------------------------------------------------------------------------------------- 2 Q- interface as gateway to the EMS -------------------------------------------------------------------------------------------------------- 3 Qecc Routing (2 level IS-IS) -------------------------------------------------------------------------------------------------------- 4 Q I/F (Ethernet) -------------------------------------------------------------------------------------------------------- 5 Optical Supervisory Channel ----------------------------------------------------------------------------------------------------------------------------------- 6 OSC - wavelength IR IR IR see OPTera Product - bitrate Description SEC. 5.2.2 - optical span limit - Per Wavelength - transmission protocol Optical Service Channel and SEC.7.3 - Management Communication ----------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 3.2 O & M INTERFACES ----------------------------------------------------------------------------------------------------------------------------------- 1 8 x Remote Control Inputs ----------------------------------------------------------------------------------------------------------------------------------- 2 Remote Control Outputs ----------------------------------------------------------------------------------------------------------------------------------- 3 Card LED support ----------------------------------------------------------------------------------------------------------------------------------- 4 Subrack LED support ----------------------------------------------------------------------------------------------------------------------------------- 5 Rack Alarm support ----------------------------------------------------------------------------------------------------------------------------------- -----------------------------------------------------------------------------------------------------------------------------------

  • Sprinkler System If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • Hardware and Software Requirements In order to access and retain Disclosures electronically, you must satisfy the following computer hardware and software requirements: access to the Internet; an email account and related software capable of receiving email through the Internet; a web browser which is SSL-compliant and supports secure sessions, and hardware capable of running this software.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Changes in Equipment, Systems, Etc USBFS reserves the right to make changes from time to time, as it deems advisable, relating to its systems, programs, rules, operating schedules and equipment, so long as such changes do not adversely affect the services provided to the Trust under this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!