Compressor Building Clause Samples

Compressor Building. Unless otherwise specified on the construction drawings, the Compressor Building will house the following, but not limited to, equipment, provided by and shipped to the job site by the Owner, and installed, supported and wired by Contractor: • ESD / Fire & Gas Remote I/O Panel 1 (ESD RIO 1) • Turbine C-1100 Compressor Skid (Only Interconnections, On-Skid Wiring is supplied by Solar) • Turbine C-1100 Balance Of Plant Panel (Shipped loss by Solar) • Turbine C-1100 Seal Gas Coalescer (Shipped loss by Solar) • Turbine C-1200 Compressor Skid (Only Interconnections, On-Skid Wiring is supplied by Solar) • Turbine Fuel Gas Filter • Turbine Lube Oil Filter • Turbine Fuel Gas Filter • Turbine Lube Oil Filter • Turbine C-1200 Balance Of Plant Panel (Shipped loss by Solar) • Turbine C-1200 Seal Gas Coalescer (Shipped loss by Solar) • Engine C-1300 Compressor Skid (Only Interconnections, On-Skid Wiring is supplied by Solar) • Engine C-1300 Balance Of Plant Panel (Shipped loss by Solar) • Engine C-1400 Compressor Skid (Only Interconnections, On-Skid Wiring is supplied by Solar) • Engine C-1400 Balance Of Plant Panel (Shipped loss by Solar) • Building Protection devices – UV/IR flame detectors and IR gas detectors. Building heaters block & bleed valve. • Unless otherwise specified on the construction drawings, the Compressor Building will house the following equipment, procured and installed and wired by Contractor: • Building Protection devices – ESD pushbutton stations, EBD pushbutton stations, beacons and horns. • The Contractor shall install interconnections between the ESD / Fire & Gas Remote I/O Panel (ESD RIO 1) in the Compressor Building and the following as noted on the construction drawings: • ESD PLC, located in the PCR Building • ESD pushbutton stations, EBD pushbutton stations • Intrusion switches • Beacons & Horns • Temperature Transmitter • Self-contained emergency lights • All the interconnections from the Compressor Building Panels to the various field devices shall be routed via cable tray and conduit, as shown on the construction drawings. These cables are required to be “tray rated cables”. • Unless otherwise specified on the construction drawings, the Contractor is responsible for the interconnect wiring and support, as applicable, of the following equipment: • Smoke detectorsHeat detectors • CAT5 receptacles • Cable trays and support

Related to Compressor Building

  • Capacity Building 1. Contractor will work in partnership with AOD to study the viability of billing under Drug Medi-Cal and 3rd party payer. 2. Contractor will document and track consumers who are CalWORKS eligible.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Premises Building Project and Common Areas 1.1 Premises, Building, Project and Common Areas.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • MAINTENANCE OF THE SAID BUILDING / APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot].