Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: 1. Attachment Facilities: Engineering and construction oversight for Attachment Facilities subject to the Option to Build. 2. Direct Connection Network Upgrades: Engineering and construction oversight for the new 115 kV three-breaker ring bus substation subject to the Option to Build. (PJM Network Upgrade Number N7873) 3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out of the new 115kV switching station. PJM Network Upgrades #n7875, n7876, n7877, n7878 - Remote protection and communications work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following: a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors. b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: a. One (1) 115kV circuit breaker, and b. Interconnection Customer portion of 115kV generator lead line extending from the high side of the collection substation to the point of change of ownership with VEPCO. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: 1. One (1) 115kV circuit breaker, and
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. W E AC1-167 Solar Facility S M Revenue Metering The Point of Interconnection (POI) is the first structure in the generation lead circuit outside the fence of AEP's Platter Creek 69 kV Substation, previously known as the Xxxx Center 69 kV Substation. AEP will own the first span from the Platter Creek 69 kV Substation to the first structure. AEP will own the first structure, including the jumpers. The Interconnection Customer will own the other span connecting to the POI structure, along with the remainder of the 69 kV generator lead line and associated structures back to the AC1-167 generation collector substation. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment following Interconnection Facilities: Engineering and construction oversight for Attachment Facilities subject • Construct one (1) 69 kV generator lead transmission line from the Platter Creek 69 kV Substation to the Option to Build.
2. Direct Connection Network Upgrades: Engineering Point of Interconnection, including the first structure outside the Platter Creek 69 kV Substation, install 69 kV revenue meter, and construction oversight for extend dual fiber-optic from the new 115 kV three-breaker ring bus substation subject Point of Interconnection to the Option to BuildPlatter Creek 69 kV Substation control house. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out n7991) • Expand the Platter Creek 69 kV Substation, including the addition of the new 115kV switching station. PJM Network Upgrades #n7875one (1) 69 kV circuit breaker, n7876, n7877, n7878 - Remote installation of associated protection and communications work. Interconnection Customer shall constructcontrol equipment, line risers, switches, jumpers, and Interconnected Transmission Owner shall own, the following:
asupervisory control and data acquisition (SCADA) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will also be for the generator lead linerequired. (PJM Network Upgrade Number N7873n7992) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. : • One (1) 115kV 69/34.5 kV grounded wye / grounded wye main step-up transformer; • One (1) 69 kV circuit breaker; • 69 kV generator lead transmission line from the step-up transformer to the Point of Interconnection; • Dual fiber-optic cable from the Point of Interconnection to the generator collector station; • Relay and protective equipment, supervisory control and data acquisition (SCADA) equipment, fiber-optic equipment, and telecommunications equipment; and • Necessary metering equipment as specified in Schedule C of the AC1-167 Interconnection Service Agreement. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: • Construct one (1) 69 kV generator lead transmission line from the Platter Creek 69 kV Substation to the Point of Interconnection, including the first structure outside the Platter Creek 69 kV Substation, install 69 kV revenue meter, and extend dual fiber-optic from the Point of Interconnection to the Platter Creek 69 kV Substation control house. (PJM Network Upgrade n7991) • Expand the Platter Creek 69 kV Substation, including the addition of one (1) 69 kV circuit breaker, and
b. Interconnection Customer portion installation of 115kV generator lead associated protection and control equipment, line extending from the high side of the collection substation to the point of change of ownership with VEPCOrisers, switches, jumpers, and supervisory control and data acquisition (SCADA) equipment will also be required. (PJM Network Upgrade n7992) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. : • One (1) 115kV 69/34.5 kV grounded wye / grounded wye main step-up transformer; • One (1) 69 kV circuit breaker; • 69 kV generator lead transmission line from the step-up transformer to the Point of Interconnection; • Dual fiber-optic cable from the Point of Interconnection to the generator collector station; • Relay and protective equipment, andsupervisory control and data acquisition (SCADA) equipment, fiber-optic equipment, and telecommunications equipment; and • Necessary metering equipment as specified in Schedule C of the AC1-167 Interconnection Service Agreement. The Interconnected Transmission Owner shall commence the scope of work identified in Schedules C and I of this CSA one month after both full execution of this CSA and completion of the construction kickoff call. The Interconnected Transmission Owner shall complete all Transmission Owner Interconnection Facilities set forth in Schedules C and I of this CSA and provide back feed to the Interconnection Customer’s Customer Facilities by December 31, 2023. The Interconnection Customer shall commence the scope of work identified in Schedules G and I of this CSA one month after both full execution of this CSA and completion of the construction kickoff call. Interconnection Customer shall complete all Customer Interconnection Facilities set forth in Schedules G and I of this CSA by December 31, 2023. Applicable Technical Requirements and Standards are set forth in the following documents: • “Requirements for Connection of New Facilities or Changes to Existing Facilities Connected to the AEP Transmission System,” Revision 3 dated June 30, 2021; and • “Standards and Expectations for Siting, Real Estate, Right-of-Way, and Environmental Permitting for Transmission Interconnection Projects,” Version 2 dated August 20, 2020. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this ISA, the Tariff and/or this ISA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
A. Voltage Ride Through Requirements
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment following Interconnection Facilities: Engineering • Three (3), 500 kV, current transformers, metering class; • Three (3), 500 kV, coupling capacitor voltage transformers, metering class; • Three (3), 396 kV, station class lightning arresters; • One (1), 500 kV, 3000A double end break disconnect switch; and construction oversight for Attachment Facilities subject to the Option to Build.
2• Conductors, connectors, conduits, control cables, foundations, steel structures and grounding. Direct Connection Network Upgrades: Engineering and construction oversight for the new 115 kV three-breaker ring bus substation subject to the Option to Build. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange n6647: Expand Septa 500 kV substation by adding a 500 kV circuit breaker in the ring bus to create a new line 119 to loop into and out of the new 115kV switching stationposition. PJM Network Upgrades Upgrade #n7875, n7876, n7877, n7878 - Remote protection and communications workn5464: Replace wave traps at Chickahominy substation on line #557 to Elmont. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, #n6055: Replace wave trap at North Xxxx substation on the following Interconnection Facilities:
a. One (1) 115kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead #576 line. PJM Network Upgrade #n6063: Replace wave trap at both Ladysmith and Possum Point Substations for the Ladysmith – Possum Pt 500 kV line extending from #568. PJM Network Upgrade #n5483: Replace wave traps at Ladysmith and Elmont substations on the high side of the collection substation to the point of change of ownership with VEPCO#574 line. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. : • One (1) 115kV 500/34.5/13.8 kV wye ground/wye ground/delta main power transformer with a rating of 213/240/267 MVA; • One (1) 500 kV circuit breaker; and • Communication equipment to the Interconnected Transmission Owner bidirectional metering equipment. Interconnected Transmission Owner shall construct and, andunless otherwise indicated, shall own, the following Interconnection Facilities: • Three (3), 500 kV, current transformers, metering class; • Three (3), 500 kV, coupling capacitor voltage transformers, metering class; • Three (3), 396 kV, station class lightning arresters; • One (1), 500 kV, 3000A double end break disconnect switch; and • Conductors, connectors, conduits, control cables, foundations, steel structures and grounding. PJM Network Upgrade #n6647: Expand Septa 500 kV substation by adding a 500 kV circuit breaker in the ring bus to create a new line position. PJM Network Upgrade #n5464: Replace wave traps at Chickahominy substation on line #557 to Elmont. PJM Network Upgrade #n6055: Replace wave trap at North Xxxx substation on the #576 line. PJM Network Upgrade #n6063: Replace wave trap at both Ladysmith and Possum Point Substations for the Ladysmith – Possum Pt 500 kV line #568. PJM Network Upgrade #n5483: Replace wave traps at Ladysmith and Elmont substations on the #574 line.
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Point of Interconnection: Interconnected Transmission Owner dead-end structure The Transmission Owner Interconnection Facilities to be built by the Interconnected Transmission Owner are described below and detailed in the AC1-033 Facilities Study report. To the extent that the AC1-033 Facilities Study report details conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: • 138 kV line beginning at the Point of Interconnection with Interconnection Customer and extending to the Kewanee Substation 138 kV bus. The scope of work includes:
1. Expansion and upgrade of the Kewanee Substation and 138 kV bus to tie in the Attachment Facilities: Engineering and construction oversight for Attachment Facilities subject to the Option to Build.;
2. Direct Connection Network Upgrades: Engineering and construction oversight for One (1) new 138kV circuit breaker;
3. Two (2) new 138kV motor-operated disconnect switches to be installed on each side of the new 115 kV threeL910118 circuit breaker; and
4. New 138kV Metering Equipment to be installed on the ComEd side of the Point of Interconnection. • Kewanee Substation upgrades to accommodate the AC1-breaker ring bus substation subject to the Option to Build. 033 interconnection (PJM Network Upgrade Number N7873No. N8073)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out The scope of the new 115kV switching station. PJM Network Upgrades #n7875, n7876, n7877, n7878 - Remote protection and communications work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the followingwork includes:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line1. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Relaying Upgrades at Kewanee Substation to Merck No. 5 Substation. The cut line will consume two of accommodate the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. One (1) 115kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead line extending from the high side of the collection substation to the point of change of ownership with VEPCOAC1-033 interconnection. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: • 138 kV line beginning at the high side of the generator step-up transformer (GSU) and extending to the Point of Interconnection; • Circuit breakers and associated equipment; • Relay and protective equipment, and Supervisory Control and Data Acquisition (SCADA) and telecommunications equipment to comply with the Applicable Technical Requirements and Standards identified in Schedule K of this CSA; and • Two physically diverse fiber optic cables between TSS 910 Midland Wind Farm and TSS 74 Kewanee. • Interconnection Customer (IC) shall install, own, operate, maintain, inspect, and test real- time telemetry to measure and transmit directly to PJM the real time MW, MVAR, voltage and status of electrical equipment such as circuit breakers and Motor Operated Disconnects, in conformance with the requirements listed in PJM Manuals M-01 and M- 14D. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities as detailed in the AC1-033 Facilities Study report. To the extent that the AC1-033 Facilities Study report details conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: • 138 kV line beginning at the high side of the generator step-up transformer (GSU) and extending to the Point of Interconnection; • Circuit breakers and associated equipment; • Relay and protective equipment, and Supervisory Control and Data Acquisition (SCADA) and telecommunications equipment to comply with the Applicable Technical Requirements and Standards identified in Schedule K of this CSA; and • Two physically diverse fiber optic cables between TSS 910 Midland Wind Farm and TSS 74 Kewanee. • Interconnection Customer (IC) shall install, own, operate, maintain, inspect, and test real- time telemetry to measure and transmit directly to PJM the real time MW, MVAR, voltage and status of electrical equipment such as circuit breakers and Motor Operated Disconnects, in conformance with the requirements listed in PJM Manuals M-01 and M- 14D. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: • 138 kV line beginning at the Point of Interconnection with Interconnection Customer and extending to the Kewanee Substation 138 kV bus. The scope of work includes:
1. Expansion and upgrade of the Kewanee Substation and 138 kV bus to tie in the Attachment Facilities;
2. One (1) 115kV new 138kV circuit breaker;
3. Two (2) new 138kV motor-operated disconnect switches to be installed on each side of the L91018 circuit breaker; and
4. New 138kV Metering Equipment to be installed on the ComEd side of the Point of Interconnection. • Kewanee Substation upgrades to accommodate the AC1-033 interconnection (PJM Network Upgrade No. N8073). The scope of work includes:
1. Relaying Upgrades at Kewanee Substation to accommodate the AC1-033 interconnection. The Interconnected Transmission Owner shall commence the scope of work identified in Schedules C and I of this CSA one month after both full execution of this CSA and completion of the construction kickoff call. The Interconnected Transmission Owner shall complete all Transmission Owner Interconnection Facilities set forth in Schedules C and I of this CSA and provide back feed to the Interconnection Customer’s Customer Facilities by 3/15/2024. The Interconnection Customer shall complete all Customer Interconnection Facilities set forth in Schedules G and I of this CSA by 4/15/2024. Item Description Responsibility PJM Network Upgrade # Work to Commence Work to be completed on or before 1 Attachment Facilities Interconnected Transmission Owner N/A Any time after effective date of this CSA March 15, and2024 2 Non Direct Connection Network Upgrades Interconnected Transmission Owner N8073 Any time after effective date of this CSA March 15, 2024 3 Construct the following Interconnection Facilities: • 138 kV line beginning at the high side of the GSU and extending to the Point of Interconnection with ComEd; • Circuit breakers and associated equipment; and • Relay and protective equipment, and SCADA and telecommunications equipment to comply Interconnection Customer N/A Any time after effective date of this CSA April 15, 2024 with the Applicable Technical Requirements and Standards identified in Schedule D of the AC1 Interconnection Service Agreement.
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. • Expansion of AEP’s Nottingham 138kV switching station, including the addition of three (3) 138 kV breakers, new protection & communications equipment, relay-settings adjustments, and fiber-optic cable. (Network Upgrade n5540) • Metering at Nottingham switching station (for two (2) generation connections). (Network Upgrade n5541) • Extension of two (2) 138kV transmission line spans from Nottingham switching station to the Point of Interconnection with Xxxxxxxx Power. (Network Upgrade n6066) • Two (2) new 138 kV transmission circuits approximately 4.5 miles in length which will connect the Customer Facility to AEP’s Nottingham 138 kV switching station • Two (2) generator step transformers with high side voltage equal to 138 kV • Two (2) 138 kV circuit breakers Transmission Owner: Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment following Interconnection Facilities: Engineering • Expansion of AEP’s Nottingham 138kV switching station, including the addition of three (3) 138 kV breakers, new protection & communications equipment, relay-settings adjustments, and construction oversight fiber-optic cable. (Network Upgrade n5540) • Metering at Nottingham switching station (for Attachment Facilities subject two (2) generation connections). (Network Upgrade n5541) • Extension of two (2) 138kV transmission line spans from Nottingham switching station to the Option to Build.
2. Direct Connection Network Upgrades: Engineering and construction oversight for first structure outside of the new 115 kV three-breaker ring bus substation subject to the Option to BuildNottingham station. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgradesn6066) Interconnection Customer: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out of the new 115kV switching station. PJM Network Upgrades #n7875, n7876, n7877, n7878 - Remote protection and communications work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. One : • Two (2) new 138 kV transmission circuits approximately 4.5 miles in length from the Customer Facility up to and including the first structure outside the Nottingham 138 kV switching station • Two (2) generator step transformers with high side voltage equal to 138 kV • Two (2) 138 kV circuit breakers Transmission Owner: AEP Engineering Start 06/11/2021 All Material Ordered 01/06/2022 Construction Start (Grading & Below Grade) 05/20/2022 Construction Start (Above Grade) 09/15/2022 Outage requests made by 11/20/2021 Outage (IPP Structure Foundations, Line Crossings, Safety Clearances) 1st Qtr 2022-2nd Qtr 2022 Outage (Cut-In & Testing) 2nd Qtr 2022 Ready for back feed 01/14/2023 In-Service Date (Backfeed) 01/14/2023 Interconnection Customer: Initial Back-feed through Project Substation Date March 1) 115kV circuit breaker, and
b. 2023 First generating turbine to be operational December 9, 2023 Second generating turbine to be operational January 1, 2024 Project Commercial Operation Date June 11, 2024 Applicable Technical Requirements and Standards are set forth in the following documents that are posted on the PJM website at xxxx://xxx.xxx.xxx/planning/design-engineering/to-tech- standards/private-aep.aspx, as the same may be updated from time-to-time: • Requirements for Connection of New Facilities or Changes to Existing Facilities Connected to the AEP Transmission System, Revision 2 dated January 1, 2019 • Standards for Siting, Real Estate, ROW and Environmental Permitting for Interconnection Projects; and • Independent Power Producer Option to Build Guidelines. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this ISA, the Tariff and/or this ISA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer portion of 115kV generator lead line extending from the high side represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the collection substation to Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the point of change of ownership with VEPCO“IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall construct and, unless otherwise indicated, shall own, change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the following Interconnection Facilities:
1CSA. One (1) 115kV circuit breaker, andService Agreement No. 6074 Service Agreement No. 6074
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment Facilities: Engineering and construction oversight for The Attachment Facilities subject to the Option to Build.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the new 115 kV three-breaker ring bus substation subject to the Option to Build. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out of the new 115kV switching station. PJM Network Upgrades #n7875, n7876, n7877, n7878 - Remote protection and communications work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation interconnecting switching station which is associated solely with the generator lead linesingle feed to the generating facilities collector station. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs)CCVT’s, metering accuracy current transformers (CTs)CT’s, disconnect switch, conductors, conductors and connectors. Purchase and install substation material:
1. One (1), 115kV, 2000A, 3-Phase center break gang operated switch.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation2. Three (3), subject 115kV, metering accuracy CCVT’s.
3. Three (3), 115kV,500:5 metering accuracy CT’s.
4. Conductor, connectors, conduits, control cables, foundations, steel structures and grounding material as per engineering standards from the point of interconnection to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck Nonew switching station. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. One (1) 115kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead #n7854.1 - Re-arrange line extending from the high side #65 to loop into and out of the collection new three breaker AE1-155 115 kV switching station Line 65 is an existing 115kV line that runs from Northern Neck substation to Harmony Village substation. AE1-155 provides for the point construction of a new substation located in the existing Line 65 right-of-way between existing structures 65/498 and 65/499 in Farnham, VA. PJM Network Upgrade #n7854.3 - Remote protection and communication work. Additional work is required at Northern Neck, Rappahannock, and Harmony Village substations. Drawing work, relay resets, and field support necessary to change the line 65 destinations at Xxxxxx XX, Xxxxxxxxx, Xxxxx & White Stone substations will also be completed. PJM Network Upgrade #n7854.2 - Build a three breaker AE1-155 115 kV switching station. The facilities identified provides for the initial construction of ownership with VEPCOa new 115 kV three breaker ring substation between structures 65/498 and 65/499. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: All Attachment Facilities from the Point of Interconnection to the generator leads, which consist of the following:
1. One (1) 34.5 kV generation Collector System 2. One (1) 34.5/115kV transformer with a rating of 85/115/138 MVA 3. One (1) 115kV circuit breakerbreaker 4. One (1) 115 kV generator lead line from the generation substation to the Point of Interconnection to the new switching station Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: All Attachment Facilities from the Point of Interconnection to the generator leads, which consist of the following:
1. One (1) 34.5 kV generation Collector System 2. One (1) 34.5/115kV transformer with a rating of 85/115/138 MVA 3. One (1) 115kV circuit breaker 4. One (1) 115 kV generator lead line from the generation substation to the Point of Interconnection to the new switching station Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: The Attachment Facilities include the portion of the interconnecting switching station which is associated solely with the single feed to the generating facilities collector station. The equipment associated with the Attachment Facilities include the metering accuracy CCVT’s, metering accuracy CT’s, disconnect switch, conductors and connectors. Purchase and install substation material:
1. One (1), 115kV, 2000A, 3-Phase center break gang operated switch.
2. Three (3), 115kV, metering accuracy CCVT’s.
3. Three (3), 115kV,500:5 metering accuracy CT’s.
4. Conductor, connectors, conduits, control cables, foundations, steel structures and grounding material as per engineering standards from the point of interconnection to the new switching station. PJM Network Upgrade #n7854.1 - Re-arrange line #65 to loop into and out of the new three breaker AE1-155 115 kV switching station Line 65 is an existing 115kV line that runs from Northern Neck substation to Harmony Village substation. AE1-155 provides for the construction of a new substation located in the existing Line 65 right-of-way between existing structures 65/498 and 65/499 in Farnham, VA. PJM Network Upgrade #n7854.3 - Remote protection and communication work. Additional work is required at Northern Neck, Rappahannock, and Harmony Village substations. Drawing work, relay resets, and field support necessary to change the line 65 destinations at Xxxxxx XX, Xxxxxxxxx, Xxxxx & White Stone substations will also be completed. PJM Network Upgrade #n7854.2 - Build a three breaker AE1-155 115 kV switching station. The facilities identified provides for the initial construction of a new 115 kV three breaker ring substation between structures 65/498 and 65/499. The Interconnected Transmission Owner shall commence the scope of work identified in Schedules C and I of this CSA one month after both full execution of this CSA and completion of the construction kickoff call. The Interconnected Transmission Owner shall complete all Transmission Owner Interconnection Facilities set forth in Schedules C and I of this CSA and provide back feed to the Interconnection Customer’s Customer Facilities by 4/15/2023. The Interconnection Customer shall complete all Customer Interconnection Facilities set forth in Schedules G and I of this CSA by 12/31/2023. Dominion Energy Facility Interconnection Requirements revision 19.0, dated April 1, 2021, shall apply. The Dominion Energy Facility Interconnection Requirements revision 19.0, dated April 1, 2021 is available on the PJM website. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
A. Voltage Ride Through Requirements
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Meigs County, Ohio GPS Coordinates: Latitude: 38.5500000 Longitude: 81.4600000 West Bashan 69kV Switch East Bashan 69kV Switch Coolville 69kV Substation Hemlock 69kV Substation Bashan 69kV 12kV M ITO IC Granny Run 69kV Switching Station ITO IC M Interconnected Transmission Owner Interconnection Customer Meter Existing To be Constructed for AC1-082 Point of Interconnection (POI) Ravenswood 69kV Substation . The Point of Interconnection is the first structure outside of the proposed Granny Run 69 kV station (such structure being located in Interconnection Customer’s 34.5-69 kV Collector Substation) with the Interconnected Transmission Owner owning the span of conductors, and the Interconnection Customer owning the structure. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment following Interconnection Facilities: • Engineering and construction oversight for Attachment Facilities subject to the Option to Build.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the design and construction of the new 115 Granny Run 69 kV three-breaker ring bus substation subject Interconnection Station and the portion of the generation lead transmission line from the new Granny Run kV Interconnection Station to the Option to BuildPoint of Interconnection. (PJM Network Upgrade Number N7873)
3n5589) • Construct 69 kV line extensions from the proposed dead-end structure 1 at the existing Ravenswood-Hemlock 69 kV circuit Right of Way to the new Granny Run 69 kV three breaker ring bus station and perform final connection of the circuit to the station. Non-Direct Connection Network Upgrades: (PJM Network Upgrade #n7874 – Rearrange n5590) • Upgrade line 119 to loop into protection and out of controls at the new 115kV switching stationRavenswood 69 kV Station. (PJM Network Upgrades #n7875, n7876, n7877, n7878 - Remote Upgrade n5592) • Upgrade line protection and communications workcontrols at the Xxxxxxx 00 xX Xxxxxxx. (XXX Network Upgrade n5593) Interconnection Customer shall construct, construct and Interconnected Transmission Owner shall own, own the following:
a: • Construct one (1) Attachment Facilities: Attachment Facilities subject 69 kV generator lead transmission line span from the Granny Run 69 kV Station to the Option Point of Interconnection, including the first structures outside the Granny Run 69 kV Station, and extend dual fiber-optic from the Point of Interconnection to Build, as indicated in the Facilities Study, include the portion of the Granny Run 69 kV Station control house. • Granny Run 69 kV Station – Install a new 115 69 kV three-three (3) circuit breaker ring bus substation station along the Ravenswood – Hemlock 69 kV line to interconnect the Customer Facility. Installation of associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs)protection and control equipment, metering accuracy current transformers (CTs)69 kV line risers, disconnect switch, conductorsSCADA, and connectors.
b) Direct Connection Network Upgrades: New 115 69 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line revenue metering will consume two of the positions in the ring bus. The third position will also be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. One (1) 115kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead line extending from the high side of the collection substation to the point of change of ownership with VEPCOrequired. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. : • One (1) 115kV 69/34.5 kV Delta / grounded wye main step-up transformer; • One (1) 69 kV circuit breaker; • 69 kV generator lead transmission line from the step-up transformer to the Point of Interconnection; • Dual fiber-optic cable from the Point of Interconnection to the generator collector station; • Relay and protective equipment, supervisory control and data acquisition (SCADA) equipment, fiber-optic equipment, and telecommunications equipment; and • Necessary metering equipment as specified in Schedule C of the XX0-000 XXX. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: • One (1) 69/34.5 kV Delta / grounded wye main step-up transformer; • One (1) 69 kV circuit breaker; • 69 kV generator lead transmission line from the step-up transformer to the Point of Interconnection; • Dual fiber-optic cable from the Point of Interconnection to the generator collector station; • Relay and protective equipment, supervisory control and data acquisition (SCADA) equipment, fiber-optic equipment, and telecommunications equipment; and • Necessary metering equipment as specified in Schedule C of the XX0-000 XXX. Under the Option to Build, Interconnection Customer shall construct and Interconnected Transmission Owner shall own the following: • Construct one (1) 69 kV generator lead transmission line span from the Granny Run 69 kV Station to the Point of Interconnection, including the first structures outside the Granny Run 69 kV Station, and extend dual fiber-optic from the Point of Interconnection to the Granny Run 69 kV Station control house. • Granny Run 69 kV Station – Install a new 69 kV three (3) circuit breaker ring bus station along the Ravenswood – Hemlock 69 kV line to interconnect the Customer Facility. Installation of associated protection and control equipment, 69 kV line risers, SCADA, and 69 kV revenue metering will also be required. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: • Engineering oversight for the design and construction of the new Granny Run 69 kV Interconnection Station and the portion of the generation lead transmission line from the new Granny Run kV Interconnection Station to the Point of Interconnection. (PJM Network Upgrade Number n5589) • Construct 69 kV line extensions from the proposed dead-end structure 1 at the existing Ravenswood-Hemlock 69 kV circuit Right of Way to the new Granny Run 69 kV three breaker ring bus station and perform final connection of the circuit to the station. (PJM Network Upgrade n5590) • Upgrade line protection and controls at the Ravenswood 69 kV Station. (PJM Network Upgrade n5592) • Upgrade line protection and controls at the Hemlock 69 kV Station. (PJM Network Upgrade n5593) Interconnected Transmission Owner: AEP Engineering Start Q2 2022 All Material Ordered Q3 2022 Construction Start (Grading & Below Grade) N/A Construction Start (Above Grade) N/A Outage requests made by Q2 2022 Outage (Structure Foundations, Line Crossings, Safety Clearances) Q3 2023 Outage (Cut-In & Testing) Q3 2023 Interconnection Facilities constructed by Interconnected Transmission Owner ready for back feed 10/1/2023 Dates above are for Interconnected Transmission Owner’s scope of work only. Interconnection Customer: The Interconnection Customer shall complete all Customer Interconnection Facilities and Transmission Owner Interconnection Facilities to be built by Interconnection Customer pursuant to Option to Build set forth in Schedules D, G and I of this CSA by October 1, 2023.
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. The Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment Facilities: Engineering and construction oversight for Attachment Facilities subject to Install 69kV check metering at the Option to Buildnew AE2-303 69kV interconnection switching station.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the AE2-303 69kV interconnection switching station – Construct a new 115 kV three-four breaker ring bus substation subject 69kV switching station to interconnect the Option to BuildCustomer Facility. (PJM Network Upgrade Number N7873)n7482.
3. NonHonda East Liberty-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 East Liberty Union REA-Honda Marysville Union REA 69 kV line – Rearrange Construct a new loop-in tap line 119 from Dayton’s existing Honda East Liberty- East Liberty Union REA-Honda Marysville Union REA 69 kV line to loop into and out of the new 115kV AE2- 303 69kV interconnection switching station. PJM Network Upgrades #n7875, n7876, n7877, n7878 - Remote protection and communications work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectorsUpgrade Number n7483.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes 4. Honda East Liberty 69kV Substation to Merck No– Modify relay settings. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) n7484.
5. Honda Marysville 69kV substation – Modify relay settings. PJM Network Upgrade Number n7485.
6. Peoria 69kV substation – Modify relay settings. PJM Network Upgrade Number n7486. The Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. a) One (1) 115kV attachment line between the new AE2-303 69kV interconnection switching station and the Customer Facility;
b) One (1) 69kV circuit breakerbreaker and associated equipment located at the Customer Facility;
c) One (1) 34.5/69kV generator step-up transformer located at the Customer Facility;
d) Minimum relay and protective equipment, supervisory control and data acquisition (SCADA) equipment, and telecommunications equipment; and
b. Interconnection Customer portion of 115kV generator lead line extending from the high side e) Necessary metering equipment as specified in Schedule C of the collection substation to the point of change of ownership with VEPCOAE2-303 Interconnection Service Agreement (“ISA”). The Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. a) One (1) 115kV attachment line between the new AE2-303 69kV interconnection switching station and the Customer Facility;
b) One (1) 69kV circuit breakerbreaker and associated equipment located at the Customer Facility;
c) One (1) 34.5/69kV generator step-up transformer located at the Customer Facility;
d) Minimum relay and protective equipment, supervisory control and data acquisition (SCADA) equipment, and telecommunications equipment; and
e) Necessary metering equipment as specified in Schedule C of the AE2-303 Interconnection Service Agreement (“ISA”). The Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Install 69kV check metering at the new AE2-303 69kV interconnection switching station.
2. AE2-303 69kV interconnection switching station – Construct a new four breaker ring bus 69kV switching station to interconnect the Customer Facility. PJM Network Upgrade Number n7482.
3. Honda East Liberty-East Liberty Union REA-Honda Marysville Union REA 69 kV line – Construct a new loop-in tap line from Dayton’s existing Honda East Liberty-East Liberty Union REA-Honda Marysville Union REA 69 kV line to the new AE2-303 69kV interconnection switching station. PJM Network Upgrade Number n7483.
4. Honda East Liberty 69kV Substation – Modify relay settings. PJM Network Upgrade Number n7484.
5. Honda Marysville 69kV substation – Modify relay settings. PJM Network Upgrade Number n7485.
6. Peoria 69kV substation – Modify relay settings. PJM Network Upgrade Number n7486. The schedule of work for the Interconnected Transmission Owner work as set for in Schedule C is: Preliminary Engineering 1 4 Detailed Engineering 4 12 Equipment Procurement - Delivery 12 15 Above Grade Construction 15 22 Testing & Commissioning 22 24 Month #1 corresponds to the first month after this CSA is effective. The schedule of work for the Interconnection Customer work is: By December 1, 2023: Complete all Customer Interconnection Facilities set forth in Schedule G of this CSA. “Requirements for the Connection of Facilities to The Dayton Power & Light Co. Transmission System,” dated January 2021, shall apply and are available on the PJM website. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
A. Voltage Ride Through Requirements
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: Attachment Facilities:
(1. Attachment Facilities: Engineering ) One (1) 230 kV, 3000A, 3-phase center break gang operated switch;
(2) Three (3) 115 kV metering accuracy coupling capacitor voltage transformers;
(3) Three (3) 115 kV metering accuracy current transformers; and
(4) Conductors, connectors, conduits, control cables, foundations, steel structures, and construction oversight for Attachment Facilities subject to the Option to Build.
2grounding. Direct Connection Network Upgrades: Engineering and construction oversight for the new 115 kV three-breaker ring bus substation subject to the Option to Build. :
(5) PJM Network Upgrade Number N7873)
3#n6704 - Three breaker 115 kV switching station. Non-Direct Connection Network Upgrades: :
(6) PJM Network Upgrade #n7874 – Rearrange n6705 - Re-arrange line 119 #85 to loop into and out of the new 115kV three breaker 115 kV switching station. , and
(7) PJM Network Upgrades Upgrade #n7875, n7876, n7877, n7878 n6706 - Remote protection and communications communication work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. One (1) 115kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead line extending from the high side of the collection substation to the point of change of ownership with VEPCO. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. (a) Three (3) 115kV circuit breakers, and
(b) One (1) 115 kV generator lead beginning at the high sides of the main power transformers, at the collector substation, and extending to the point of change of ownership with Interconnected Transmission Owner. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
(a) Three (3) 115kV circuit breakerbreakers, and
(b) One (1) 115 kV generator lead beginning at the high sides of the main power transformers, at the collector substation, and extending to the point of change of ownership with Interconnected Transmission Owner. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: Attachment Facilities:
(1) One (1) 230 kV, 3000A, 3-phase center break gang operated switch;
(2) Three (3) 115 kV metering accuracy coupling capacitor voltage transformers;
(3) Three (3) 115 kV metering accuracy current transformers; and
(4) Conductors, connectors, conduits, control cables, foundations, steel structures, and grounding. Direct Connection Network Upgrades:
(5) PJM Network Upgrade #n6704 - Three breaker 115 kV switching station. Non-Direct Connection Network Upgrades:
(6) PJM Network Upgrade #n6705 - Re-arrange line #85 to loop into and out of the new three breaker 115 kV switching station, and
(7) PJM Network Upgrade #n6706 - Remote protection and communication work. Interconnected Transmission Owner: By February 28, 2023: Initiate construction of AD1-041 substation By November 30, 2023: Complete construction of the facilities set forth in Schedule C of this CSA Interconnection Customer: By November 30, 2022: Initiate construction of Customer Interconnection Facilities By November 30, 2023: Complete all Customer Interconnection Facilities set forth in Schedule G of this CSA By December 31, 2022: Provide the Interconnected Transmission Owner a clear, graded, level, and permitted site for the new switching station Dominion Energy Facility Interconnection Requirements revision 19.0, dated April 1, 2021, shall apply. Dominion Energy Facility Interconnection Requirements revision 19.0, dated April 1, 2021 is available on the PJM website. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Install the following Attachment Facilities on the Interconnected Transmission Owner shall construct andside of the Point of Interconnection: • One (1) 115 kV, unless otherwise indicated2000 A center break switch; • Three (3) 115 kV, shall ownmetering accuracy capacitive coupled voltage transformers; • Three (3) 115 kV, the following:
1metering accuracy current transformers; • Relay and metering panels; and • Conductor, connectors, conduit, control cable, foundations and grounding material. Attachment Facilities: Engineering and construction oversight for Attachment Facilities subject to the Option to Build.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the new 115 kV three-breaker ring bus substation subject to the Option to Build. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange n6235 - Build a three breaker AC1-043 115 kV switching station. The site is located adjacent to the Interconnected Transmission Owner’s 115 kV line 119 #2 from Mountain Run substation to Xxxxxxxx substation. PJM Network Upgrade #n6236 - Re-arrange line #2 to loop into and out of the new 115kV three breaker AC1-043 115 kV switching stationstation between Mountain Run to Xxxxxxxx substations. PJM Network Upgrades #n7875, n7876, n7877, n7878 - Remote protection and communications communication work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation protection requirements to Merck Noreliably interconnect the proposed generating facility with the transmission system determined that work is required at Mountain Run, Oak Green, and Remington 115 kV substations. 5 Substation. The cut line will consume two of • One (1) 115 kV grounded wye / 34.5 kV grounded wye main power transformer; • One (1) 115 kV circuit breaker; and • Communication equipment to the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnected Transmission Owner bidirectional metering equipment Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. : • One (1) 115kV 115 kV grounded wye / 34.5 kV grounded wye main power transformer; • One (1) 115 kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead line extending from the high side of the collection substation ; and • Communication equipment to the point of change of ownership with VEPCO. Interconnection Customer Interconnected Transmission Owner bidirectional metering equipment Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: Install the following Interconnection Facilities:
1. Attachment Facilities on the Interconnected Transmission Owner side of the Point of Interconnection: • One (1) 115kV circuit breaker115 kV, and2000 A center break switch; • Three (3) 115 kV, metering accuracy capacitive coupled voltage transformers; • Three (3) 115 kV, metering accuracy current transformers; • Relay and metering panels; and • Conductor, connectors, conduit, control cable, foundations and grounding material. PJM Network Upgrade #n6235 - Build a three breaker AC1-043 115 kV switching station. The site is located adjacent to the Interconnected Transmission Owner’s 115 kV line #2 from Mountain Run substation to Xxxxxxxx substation. PJM Network Upgrade #n6236 - Re-arrange line #2 to loop into and out of the new three breaker AC1-043 115 kV switching station between Mountain Run to Xxxxxxxx substations. Remote protection and communication work. Interconnected Transmission Owner’s protection requirements to reliably interconnect the proposed generating facility with the transmission system determined that work is required at Mountain Run, Oak Green, and Remington 115 kV substations. The Interconnected Transmission Owner shall commence the scope of work identified in Schedules C and I of this CSA one month after both full execution of the Queue No. AC1- 043 CSA and completion of the construction kickoff call. The Interconnected Transmission Owner shall complete all Transmission Owner Interconnection Facilities set forth in Schedules C and I of this CSA and provide back feed to the Interconnection Customer’s Customer Facilities by October 15, 2021. The Interconnection Customer shall commence the scope of work identified in Schedules G and I of this CSA no later than one month after both full execution of the Queue No. AC1- 043 CSA and completion of the construction kickoff call. The Interconnection Customer shall complete all Customer Interconnection Facilities set forth in Schedules G and I of this CSA by October 15, 2021. Dominion Energy Facility Interconnection Requirements revision 19.0, dated April 1, 2021, shall apply. The Dominion Energy Facility Interconnection Requirements revision 19.0, dated April 1, 2021, are available on the PJM website. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
A. Voltage Ride Through Requirements
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. M Revenue Meter Xxxxxxxx Xxxxxxxx Xxxxxxxx The Point of Interconnection is at the first (dead-end) structure outside (north-west) of the Nottingham 138 kV Station fence. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, owns the following:
1. Attachment Facilities: Engineering and construction oversight for Attachment Facilities subject span from the Nottingham 138 kV Station to the Option to Build.
2dead-end, including the jumpers and structure at the dead-end. Direct Connection Network Upgrades: Engineering Interconnection Customer owns the span and construction oversight for structures from the new 115 kV threedead-breaker ring bus substation subject end to the Option AE2-290 generation collector station. • Construct one (1) 138 kV generator lead transmission line span from the Nottingham 138 kV Station to Buildthe Point of Interconnection, including the first structure outside the Nottingham 138 kV Station, install 138 kV revenue meter, and extend dual fiber-optic from the Point of Interconnection to the Nottingham 138 kV Station control house. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out n7452) • Expand Nottingham 138 kV Station, including the addition of the new 115kV switching station. PJM Network Upgrades #n7875two (2) 138 kV circuit breakers, n7876, n7877, n7878 - Remote installation of associated protection and communications work. Interconnection Customer shall constructcontrol equipment, 138 kV line risers, and Interconnected Transmission Owner shall own, the following:
asupervisory control and data acquisition (SCADA) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead lineequipment. (PJM Network Upgrade Number N7873n7453) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. : • One (1) 115kV 138/34.5 kV grounded wye / grounded wye main step-up transformer; • One (1) 138 kV circuit breaker, and
b. Interconnection Customer portion of 115kV ; • 138 kV generator lead transmission line extending from the high side step-up transformer to the Point of Interconnection; • Fiber-optic cable from the Point of Interconnection to the generator collector station; • Relay and protective equipment, supervisory control and data acquisition (SCADA) equipment, fiber-optic equipment, and telecommunications equipment; and • Necessary metering equipment as specified in Schedule C of the collection substation XX0-000 XXX. Transmission Owner: Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following: • Construct one (1) 138 kV generator lead transmission line span from the Nottingham 138 kV Station to the point Point of change Interconnection, including the first structure outside the Nottingham 138 kV Station, install 138 kV revenue meter, and extend dual fiber-optic from the Point of ownership with VEPCOInterconnection to the Nottingham 138 kV Station control house. (PJM Network Upgrade n7452) • Expand Nottingham 138 kV Station, including the addition of two (2) 138 kV circuit breakers, installation of associated protection and control equipment, 138 kV line risers, and supervisory control and data acquisition (SCADA) equipment. (PJM Network Upgrade n7453) Interconnection Customer: Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. : • One (1) 115kV 138/34.5 kV grounded wye / grounded wye main step-up transformer; • One (1) 138 kV circuit breaker; • 138 kV generator lead transmission line from the step-up transformer to the Point of Interconnection; • Fiber-optic cable from the Point of Interconnection to the generator collector station; • Relay and protective equipment, andsupervisory control and data acquisition (SCADA) equipment, fiber-optic equipment, and telecommunications equipment; and • Necessary metering equipment as specified in Schedule C of the XX0-000 XXX. Interconnected Transmission Owner: AEP Engineering Start Q2 2022 All Material Ordered Q2 2022 Construction Start (Grading & Below Grade) Q4 2022 Construction Start (Above Grade) Q1 2023 Outage requests made by TBD Outage (Structure Foundations, Line Crossings, Safety Clearances) TBD Outage (Cut-In & Testing) TBD Ready for Back Feed 05/05/2023 Interconnection Customer: Interconnection Customer shall complete all Customer Interconnection Facilities set forth in Schedules G and I of this CSA by October 30, 2023. Applicable Technical Requirements and Standards are set forth in the following documents that are posted on the PJM website: • Requirements for Connection of New Facilities or Changes to Existing Facilities Connected to the AEP Transmission System, Revision 3 dated June 30, 2021; • Standards and Expectations for Siting, Real Estate, Right-of-Way, and Environmental Permitting for Transmission Interconnection Projects, Version 2 dated August 20, 2020; and • Independent Power Producer (IPP) Option to Build Guidelines, Revision 2 dated December 7, 2020. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
A. Voltage Ride Through Requirements
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. POI Project Substation Install the following Attachment Facilities on the Interconnected Transmission Owner shall construct andside of the Point of Interconnection: • One (1) 115 kV, unless otherwise indicated2000A, shall own, the following:
1. Attachment Facilities: Engineering and construction oversight for Attachment Facilities subject to the Option to Build.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the new 3-phase Center Break Gang Operated Switches • Three (3) 115 kV three-breaker ring bus substation subject to the Option to Build. metering accuracy CCVT’s • Three (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: ) 115 kV metering accuracy CT’s • Conductors, connectors, conduits, control cables, foundations, steel structures and grounding material as per engineering standards PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out of the new 115kV n6281- Build a three breaker AC1-098_099 115 kV switching station. PJM Network Upgrades Upgrade #n7875, n7876, n7877, n7878 - n6051- Replace wave trap at both Clubhouse and Sapony 230 kV substations (line #238). PJM Network Upgrade #n6118- Replace Battleboro substation terminal equipment. Upgrading the breaker leads at Battleboro will bring the rating to 398 MVA. PJM Network Upgrade #n6282 – Construction of new substation connection on Transmission Line 1015 between South Justice Branch and Scotland Neck Substation into the new AC1- 098_099 three breaker ring bus. PJM Network Upgrade #n6283- Remote protection and communications work. Interconnection Customer shall constructcommunication work at Earleys 115 kV, Scotland Neck 115 kV, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new South Justice Branch 115 kV three-breaker ring bus substation associated solely with the generator lead linesubstations. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. • One (1) 115kV 115 kV grounded wye / 34.5 kV grounded wye main power transformer; • One (1) 115 kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead line extending from the high side of the collection substation ; and • Two (2) 6.0 MVAr capacitor banks • Communication equipment to the point of change of ownership with VEPCOInterconnected Transmission Owner bidirectional metering equipment. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. : • One (1) 115kV 115 kV grounded wye / 34.5 kV grounded wye main power transformer; • One (1) 115 kV circuit breaker; and • Two (2) 6.0 MVAr capacitor banks • Communication equipment to the Interconnected Transmission Owner bidirectional metering equipment. Interconnected Transmission Owner shall construct and, andunless otherwise indicated, shall own, the following: Install the following Attachment Facilities on the Interconnected Transmission Owner side of the Point of Interconnection: • One (1) 115 kV, 2000A, 3-phase Center Break Gang Operated Switches
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Windsor, Virginia GPS: 36.820699, -76.778719 Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment Facilities: Engineering ) 115 kV line beginning at the point of change of ownership with Interconnection Customer and construction oversight for Attachment Facilities subject extending to the Option to Buildnew three breaker 115 kV switching station;
2) One (1) 115 kV, 2000A, 3-phase center break gang operated switch;
3) Three (3) 115 kV metering accuracy coupling capacitor voltage transformers;
4) Three (3) 115 kV metering accuracy current transformers; and
5) Conductors, connectors, conduits, control cables, foundations, steel structures, and grounding.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the new 6) New three breaker 115 kV three-breaker ring bus substation subject to the Option to Buildswitching station. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange n6900.
7) Re-arrange line 119 #44 to loop into and out of the new 115kV three breaker 115 kV switching station. PJM Network Upgrades Upgrade #n7875, n7876, n7877, n7878 - n6901.
8) Remote protection and communications communication work. Interconnection Customer shall construct, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. One (1) 115kV circuit breaker, and
b. Interconnection Customer portion of 115kV generator lead line extending from the high side of the collection substation to the point of change of ownership with VEPCO#n6902. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a) 115 kV line beginning at the high side of the 115/34.5/13.8 kV main power transformer (“MPT”) and extending to the point of change of ownership with VEPCO;
b) 115 kV circuit breaker; and
c) Communication equipment to VEPCO’s bidirectional metering equipment. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a) 115 kV line beginning at the high side of the MPT and extending to the point of change of ownership with VEPCO;
b) 115 kV circuit breaker; and
c) Communication equipment to VEPCO’s bidirectional metering equipment. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. ) 115 kV line beginning at the point of change of ownership with Interconnection Customer and extending to the new three breaker 115 kV switching station;
2) One (1) 115kV circuit breaker115 kV, 2000A, 3-phase center break gang operated switch;
3) Three (3) 115 kV metering accuracy coupling capacitor voltage transformers;
4) Three (3) 115 kV metering accuracy current transformers; and
5) Conductors, connectors, conduits, control cables, foundations, steel structures, and grounding.
6) New three breaker 115 kV switching station. PJM Network Upgrade #n6900.
7) Re-arrange line #44 to loop into and out of the new three breaker 115 kV switching station. PJM Network Upgrade #n6901.
8) Remote protection and communication work. PJM Network Upgrade #n6902. Interconnected Transmission Owner shall commence the scope of work identified in Schedules C and I of this CSA one month after both full execution of this CSA and completion of the construction kickoff call. Interconnected Transmission Owner shall complete all facilities set forth in Schedule C of this CSA and provide back feed to the Customer Facility by October 15, 2024. Interconnection Customer shall commence the scope of work identified in Schedules G and I of this CSA one month after both full execution of this CSA and completion of the construction kickoff call. Interconnection Customer shall complete all Customer Interconnection Facilities set forth in Schedule G of this CSA by October 15, 2024. Dominion Energy Facility Interconnection Requirements revision 20.0, dated April 1, 2022, shall apply. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
A. Voltage Ride Through Requirements
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. • Nottingham-Yager #1 138 kV line - FE/ATSI owns and operates the transmission lines between the AEP owned and operated substations (Nottingham and Yager). To mitigate this overload, the Nottingham-Yager #1 138 kV Line (18.5 miles) would need to be rebuilt and reconductored, replacing the existing 477 ACSR conductor with 795 ACSR. This work is to rebuild and reconductor the 14.9 miles portion of the line. (Network Upgrade n5473) • Nottingham-Yager #1 138 kV line - FE / ATSI owns and operates the transmission lines between the AEP owned and operated substations (Nottingham and Yager). To mitigate this overload, the Nottingham-Yager #1 138 kV Line (18.5 miles) would need to be rebuilt and reconductored, replacing the existing 477 ACSR conductor with 795 ACSR. This work is for the installation of steel arms, 795 ACSR conductor, static conductor and associated hardware on the approximately 3.6 miles portion of the 138 kV line that shares the same structures as the Holloway-Knox 138 kV line. (Network Upgrade n5473) • Project management, construction management, forestry, and right-of-way. (Network Upgrade n5473) • Knox Substation - Upgrade line protection and control settings at the Knox FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5546) • Brookside Substation - Upgrade line protection and control settings at the Brookside FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5547) • Longview Substation - Upgrade line protection and control settings at the Longview FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5548) • Harmon Substation - Upgrade line protection and control settings at the Harmon FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5549) • Interconnected Transmission Owner shall construct andacknowledges that, unless otherwise indicated, shall own, notwithstanding the following:
1. Attachment Facilities: Engineering and construction oversight for Attachment Facilities subject to the Option to Build.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the new 115 kV three-breaker ring bus substation subject to the Option to Build. (PJM Network Upgrade Number N7873)
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out statement on page 21 of the new 115kV switching station. August 2020, “PJM Network Upgrades Generator Interconnection Request, Queue #n7875AC1- 103/AD2-005, n7876Nottingham 138 kV, n7877Facilities Study”, n7878 - Remote protection and communications work. Interconnection Customer shall constructis not responsible for any access rights, and easements, rights of way or permits necessary for Interconnected Transmission Owner shall own, to perform the following:
aforegoing scope of work. • Two new 138 kV transmission circuits approximately 4.5 miles in length which will connect the Customer Facility to AEP’s Nottingham 138 kV switching station • Two (2) Attachment Facilities: Attachment Facilities subject generator step transformers with high side voltage equal to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 138 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers • Two (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b2) Direct Connection Network Upgrades: New 115 138 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected circuit breakers Affected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. : The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (PJM Network Upgrade Number N7873) Interconnection Customer Affected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. One : • Nottingham-Yager #1 138 kV line - FE/ATSI owns and operates the transmission lines between the AEP owned and operated substations (1Nottingham and Yager). To mitigate this overload, the Nottingham-Yager #1 138 kV Line (18.5 miles) 115kV circuit breakerwould need to be rebuilt and reconductored, and
b. replacing the existing 477 ACSR conductor with 795 ACSR. This work is to rebuild and reconductor the 14.9 miles portion of the line. (Network Upgrade n5473) • Nottingham-Yager #1 138 kV line - FE / ATSI owns and operates the transmission lines between the AEP owned and operated substations (Nottingham and Yager). To mitigate this overload, the Nottingham-Yager #1 138 kV Line (18.5 miles) would need to be rebuilt and reconductored, replacing the existing 477 ACSR conductor with 795 ACSR. This work is for the installation of steel arms, 795 ACSR conductor, static conductor and associated hardware on the approximately 3.6 miles portion of the 138 kV line that shares the same structures as the Holloway-Knox 138 kV line. (Network Upgrade n5473) • Project management, construction management, forestry, and right-of-way. (Network Upgrade n5473) • Knox Substation - Upgrade line protection and control settings at the Knox FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5546) • Brookside Substation - Upgrade line protection and control settings at the Brookside FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5547) • Longview Substation - Upgrade line protection and control settings at the Longview FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5548) • Harmon Substation - Upgrade line protection and control settings at the Harmon FE 138 kV substations to coordinate with the expanded Nottingham 138 kV substation. (Network Upgrade n5549) • Interconnected Transmission Owner acknowledges that, notwithstanding the statement on page 21 of the August 2020, “PJM Generator Interconnection Request, Queue #AC1- 103/AD2-005, Nottingham 138 kV, Facilities Study”, Interconnection Customer portion is not responsible for any access rights, easements, rights of 115kV generator lead line extending from way or permits necessary for Interconnected Transmission Owner to perform the high side foregoing scope of the collection substation to the point of change of ownership with VEPCO. Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
1. One (1) 115kV circuit breaker, andwork.
Appears in 1 contract
Consent and Approval. Such Constructing Entity has sought or obtained, or, in accordance with the Interconnection Construction Service Agreement will seek or obtain, each consent, approval, authorization, order, or acceptance by any Governmental Authority in connection with the execution, delivery and performance of such Agreement and it will provide to any Governmental Authority notice of any actions under such Agreement that are required by Applicable Laws and Regulations. Interconnected Transmission Owner shall construct and, unless otherwise indicated, shall own, the following:
1. Attachment following Interconnection Facilities: Engineering and construction oversight for Attachment Facilities subject to the Option to Build.
2. Direct Connection Network Upgrades: Engineering and construction oversight for the new 115 kV three-breaker ring bus substation subject to the Option to Build. (PJM Network Upgrade Number N7873)N6688 69 kV circuit from the Face Rock – Xxxxxx #13 69 kV line to the Point of Interconnection
3. Non-Direct Connection Network Upgrades: PJM Network Upgrade #n7874 – Rearrange line 119 to loop into and out of the new 115kV switching station. PJM Network Upgrades #n7875(1) Motor Operated Load Break Air Break Switch • Associated poles, n7876, n7877, n7878 - Remote protection and communications work. Interconnection Customer shall constructstructures, and Interconnected Transmission Owner shall own, the following:
a) Attachment Facilities: Attachment Facilities subject to the Option to Build, as indicated in the Facilities Study, include the portion of the new 115 kV three-breaker ring bus substation associated solely with the generator lead line. The equipment associated with the Attachment Facilities include the metering accuracy capacitor voltage transformers (CCVTs), metering accuracy current transformers (CTs), disconnect switch, conductors, and connectors.
b) Direct Connection Network Upgrades: New 115 kV three-breaker ring bus substation, subject to the Option to Build as indicated in the Facilities Study, located near Transmission Structure 119/413 on Interconnected Transmission Owner’s 119 Line from Grottoes Substation to Merck No. 5 Substation. The cut line will consume two of the positions in the ring bus. The third position will be for the generator lead line. (foundations PJM Network Upgrade Number N7873) N6689 • Face Rock – Xxxxxx #13 69 kV line modifications to tie in the new AE1- 226 Attachment Facilities to the transmission system PJM Network Upgrade Number N6690 • Relay modification work Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities:
a. : • 69 kV line from the Customer Facility to the Point of Interconnection • One (1) 115kV circuit breaker34.5/69 kV generator step-up transformer located at the Customer Facility • Circuit breakers and associated equipment located at the Customer Facility • Relay and protective equipment, and
b. Interconnection Customer portion and Supervisory Control and Data Acquisition (SCADA) and telecommunications equipment including the Intertie Protective Relaying (IPR) facilities and SCADA Remote Terminal Unit (RTU), to comply with the Applicable Technical Requirements and Standards identified in Schedule K of 115kV generator lead line extending from the high side of the collection substation to the point of change of ownership with VEPCO. Interconnection Customer this CSA Interconnected Transmission Owner shall construct and, and unless otherwise indicated, shall own, the following Interconnection Facilities:: PJM Network Upgrade Number N6688 69 kV circuit from the Face Rock – Xxxxxx #13 69 kV line to the Point of Interconnection
1. ) Motor Operated Load Break Air Break Switch • associated poles, structures and foundations PJM Network Upgrade Number N6689 • Face Rock – Xxxxxx #13 69 kV line modifications to tie in the new AE1- 226 Attachment Facilities to the transmission system PJM Network Upgrade Number N6690 • Relay modification work Interconnection Customer Interconnection Customer shall construct and unless otherwise indicated, shall own, the following Interconnection Facilities: • 69 kV line from the Customer Facility to the Point of Interconnection • One (1) 115kV circuit breaker34.5/69 kV generator step-up transformer located at the Customer Facility • Circuit breakers and associated equipment located at the Customer Facility • Relay and protective equipment, andand Supervisory Control and Data Acquisition (SCADA) and telecommunications equipment including the Intertie Protective Relaying (IPR) facilities and SCADA Remote Terminal Unit (RTU), to comply with the Applicable Technical Requirements and Standards identified in Schedule K of this CSA All work to install the Interconnected Transmission Owner Interconnection Facilities listed in Schedule C of this CSA is estimated to be completed within 15 months. The schedule of work for the Interconnected Transmission Owner is summarized below: Preliminary Engineering 1 3 3 Detailed Engineering 4 9 6 Construction Planning 10 13 4 Construction and Backfeed 14 15 2 Schedule estimates are subject to change due to system availability and weather conditions. Interconnection Customer: The schedule of work for the Interconnection Customer is: By July 1, 2022, complete construction of all Customer Interconnection Facilities listed in Schedule G of this CSA. PPL Electric Utilities Corporation Relay and Control Requirements for Parallel Operation of Generation (138 kV & 69 kV) Revision 0, dated January 31, 2018 and Real Estate, Right of Way Acquisition and Permitting Requirements and Procedures for Independent Power Producers Revision 0, dated July 17, 2018, shall apply. The PPL Electric Utilities Corporation Relay and Control Requirements for Parallel Operation of Generation (138 kV & 69 kV) Revision 0, dated January 31, 2018 and Real Estate, Right of Way Acquisition and Permitting Requirements and Procedures for Independent Power Producers Revision 0, dated July 17, 2018, are available on the PJM website. To the extent that these Applicable Technical Requirements and Standards conflict with the terms and conditions of the Tariff or any other provision of this CSA, the Tariff and/or this CSA shall control. As provided in Section 2.4.1 of Appendix 2 to this CSA and subject to the requirements thereof, Interconnection Customer represents that it meets all qualifications and requirements as set forth in Section 118(a) and 118(b) of the Internal Revenue Code of 1986, as amended and interpreted by Notice 2016-36, 2016-25 I.R.B. (6/20/2016) (the “IRS Notice”). Interconnection Customer agrees to conform with all requirements of the safe harbor provisions specified in the IRS Notice, as they may be amended, as required to confer non-taxable status on some or all of the transfer of property, including money, by Interconnection Customer to Interconnected Transmission Owner with respect to the payment of the Costs of construction and installation of the Transmission Owner Interconnection Facilities specified in this CSA. Nothing in Interconnection Customer’s agreement pursuant to this Schedule L shall change Interconnection Customer’s indemnification obligations under Section 2.4.2 of Appendix 2 to the CSA.
A. Voltage Ride Through Requirements
Appears in 1 contract