Construction Utilities. Contractor shall be responsible for the cost, supply and availability of electric power and distribution requirements for the performance of the Work at the Job Site. Contractor shall provide its own telephone, facsimile, radio, telex and other communication facilities at the Job Site as necessary for the performance of the Work. In addition, Contractor shall provide its own temporary lighting, water and sewer facilities at the Job Site.
Construction Utilities. Existing Utilities; Removal, Relocation and Protection.
Construction Utilities. Electricity and water, in reasonable quantities, will be provided without cost to the Contractor. Reasonable quantities is defined as lighting, portable power tools, drinking water, etc. Any uses in excess of the above, and not previously approved by the Building Manager, will be billed back to the Contractor at a rate not to exceed that charged by the applicable utility plus a 21% administrative fee. Contractor is responsible for any temporary connections, extensions, etc., to enable use of these utilities and will remove same upon completion of work. 21.
Construction Utilities. 6.15.1 Hydrotest water Owner shall provide about 200,000 m3 of hydrotest water of suitable quality per API 620, Appendix Q, within 4000 feet of the Tanks. Provision of and payment for Tank hydrotest water is the responsibility of Owner. Upon completion of the hydrotest the water shall be returned to Owner within 4000 feet of the Tanks.
Construction Utilities. Bayer shall supply certain utilities to the Leased Premises for EDNC's use in the construction of the EDNC Baytown Plant. Bayer shall invoice EDNC monthly for such construction utilities at Bayer's Net Distributed Cost.
Construction Utilities. The Design-Builder shall provide, make all arrangements necessary to secure the availability of all Utilities necessary for the performance of the Design-Build Work. The Design-Builder shall be responsible for the payment of all Utility bills in a timely manner in connection with all Design-Build Work performed from the issuance of the Notice to Proceed with Stage 2 Design-Build Work until the Substantial Completion Date.
Construction Utilities. 2 2.7 Hazardous Wastes or Materials ...................................... 2
Construction Utilities. Owner shall make arrangements for the supply of, and shall supply at no cost to Contractor, all utilities (other than telephone services) required during construction, commissioning, startup, and Facility testing until Substantial Completion.
Construction Utilities. The following construction utilities that are required for the prosecution of the Work shall be provided by either Subcontractor or Contractor as listed herein: Communications: Telephone, Fax, Radio Compressed air including air compressors, fuels, lubricants, hoses, piping Temporary Lighting: for Subcontractor’s working area as required by applicable law and as necessary for the proper execution of the Work and protection of workers. Conductors shall be not less than 12 AWG copper and insulated for 480 volts. A breaker shall be provided for the protection of each circuit. Temporary Heat as required for the efficient prosecution of the Work and to prevent freeze damage during construction. Heating methods shall be submitted for Contractors approval prior to use. Salamanders or other heating methods which constitute a hazard to personnel or property shall not be used; open fires will not be allowed. All heating equipment shall be equipped with personal protection to avoid xxxxx.
Construction Utilities. 16 2.1.4 OWNER'S REPRESENTATIVE 16 2.1.5 OWNER'S GOVERNMENTAL APPROVALS 16 2.1.6 REGISTRATION AND FINANCING REQUIREMENTS 17 2.1.7 OPERATING PERSONNEL 17 2.1.8 CUSTOMS CLEARANCE 17 2.1.9 INTERCONNECTIONS TO THE UTILITY 18 2.1.10 RELEVANT INFORMATION FOR CONTRACTOR 18 2.1.11 SPARE PARTS 18 2.1.12 OTHER ITEMS OF OWNER SUPPLY 18 2.1.13 PAYMENT OBLIGATIONS TO CONTRACTOR 18 2.2 HAZARDOUS MATERIALS 18 2.3 ITEMS REQUIRED FOR CHECK-OUT, START-UP AND PERFORMANCE TESTING 18 2.4 COMPLIANCE WITH APPLICABLE LAWS 19 2.5 ENGAGEMENT OF OWNER'S ENGINEER 19 2.6 OWNER'S SITE WORKS 19 2.7 LETTER OF CREDIT 19 ARTICLE III. RESPONSIBILITIES OF CONTRACTOR 20 3.1 CONTRACTOR'S GENERAL OBLIGATION TO PROVIDE FACILITY 20 3.2 SPECIFIC OBLIGATIONS 20 3.2.1 HANDLING OF EQUIPMENT AND MATERIALS, ETC 20 3.2.2 QUALITY OF EQUIPMENT AND MATERIALS, ETC 21 3.2.3 CONSTRUCTION MEANS, METHODS, ETC 21 3.2.4 KEY PERSONNEL 21 3.2.5 MAINTENANCE OF JOB SITE 21 3.2.6 JOB SITE SAFETY 22 3.2.7 INTERCONNECTION TO THE UTILITY 22 3.2.8 SPECIAL TOOLS, SPARE PARTS RECOMMENDATIONS 22