Common use of Contractor trouble tickets Clause in Contracts

Contractor trouble tickets. The Contractor shall document the trouble ticket Outage Duration using the Stop Clock Condition (SCC) listed in Table 4.2.5.7 and include start and stop time stamps in the Contractor’s Trouble Ticket Reporting Tool for each application of a SCC.

Appears in 1 contract

Samples: www.verizon.com

AutoNDA by SimpleDocs

Contractor trouble tickets. The Contractor shall document the trouble ticket Outage Duration using the Stop Clock Condition (SCC) listed in Table 4.2.5.7 1.3.5.7 and include start and stop time stamps in the Contractor’s Trouble Ticket Reporting Tool for each application of a an SCC.

Appears in 1 contract

Samples: www.verizon.com

Contractor trouble tickets. The Contractor shall document the trouble ticket Outage Duration using the Stop Clock Condition (SCC) listed in Table 4.2.5.7 1.1.4.7 and include start and stop time stamps in the Contractor’s Trouble Ticket Reporting Tool for each application of a SCC. Stop Clock Conditions are limited to the conditions listed in Table 1.1.4.7.

Appears in 1 contract

Samples: www.verizon.com

AutoNDA by SimpleDocs

Contractor trouble tickets. The Contractor shall document the trouble ticket Outage Duration using the Stop Clock Condition (SCC) listed in Table 4.2.5.7 1.5.4.6 and include start and stop time stamps in the Contractor’s Trouble Ticket Reporting Tool for each application of a an SCC.

Appears in 1 contract

Samples: www.verizon.com

Time is Money Join Law Insider Premium to draft better contracts faster.