Coordination with CAISO Sample Clauses

Coordination with CAISO. Seller shall be responsible in accordance with Section 3.3(b)(ii) for all outage coordination communications with the CAISO. Buyer shall cooperate with Seller in arranging and coordinating all Project outages with the CAISO.
Coordination with CAISO. Seller shall be responsible in accordance with Section E, paragraph1, above for all outage coordination communications with the CAISO. Buyer shall cooperate with Seller in arranging and coordinating all Project outages with the CAISO. Seller shall install a Telemetering System at the Facility, unless otherwise agreed to by Buyer. If the Project is interconnected to a portion of SDG&E’s distribution system operating at a voltage below 10 kV, then a Telemetering System may be required on Projects 250 kW or greater. SDG&E shall only require telemetering to the extent that less intrusive and/or more cost effective options for providing the necessary data in real time are not available. In no event shall the Aggregated Telemetering System Installation Costs exceed Twenty Thousand dollars ($20,000.00) (the “Aggregated Telemetering Cost Cap”); provided that if the Aggregated Telemetering System Installation Costs exceed the Aggregated Telemetering Cost Cap then Buyer shall have the right, but not the obligation, in its sole discretion, to agree to pay for such costs in excess of the Aggregated Telemetering Cost Cap. To the extent requested by ▇▇▇▇▇, Seller shall provide evidence of the Aggregated Telemetering System Installation Costs satisfactory to Buyer. [Only applicable if Facility is less than 0.5MW] In accordance with the provisions in Section 11.2, GEP Damages means the liquidated damages payment due by Seller to Buyer, calculated on an annual basis for the applicable Performance Measurement Period as follows: [(A-B) × (C-D)] Where: A = the Guaranteed Energy Production for the Performance Measurement Period, in MWh B = Sum of Delivered Energy over the Performance Measurement Period, in MWh C = Replacement price for the Performance Measurement Period, in $/MWh, reflecting the sum of (a) the simple average of the simple average of the Day-Ahead IFM hourly price, as published by the CAISO, for the Existing Zone Generation Trading Hub, in which the Project resides, plus