Cost Allocation for Multiple BPTF Thermal Transmission Security Issues Sample Clauses

Cost Allocation for Multiple BPTF Thermal Transmission Security Issues. If a single solution addresses multiple BPTF thermal transmission security issues, the ISO will calculate weighting factors based on the ratio of the present value of the estimated costs for individual solutions to each BPTF thermal transmission security issue. The present values of the estimated costs for the individual solutions shall be based on a common base date that will be the beginning of the calendar month in which the cost allocation analysis is performed (the “Base Date”). The ISO will apply the weighting factors to the cost allocation calculated for each Subzone for each individual BPTF thermal transmission security issue. The following example illustrates the cost allocation for such a solution: A cost allocation analysis for the selected solution is to be performed during a given month establishing the beginning of that month as the Base Date. The ISO has identified two BPTF thermal transmission security issues, Overload X and Overload Y, and the ISO has selected a single solution (Project Z) to address both BPTF thermal transmission security issues. The cost of a solution to address only Overload X (Project X) is Cost(X), provided in a given year’s dollars. The number of years from the Base Date to the year associated with the cost estimate of Project (X) is N(X). The cost of a solution to address only Overload Y (Project Y) is Cost(Y), provided in a given year’s dollars. The number of years from the Base Date to the year associated with the cost estimate of Project Y is N(Y). The discount rate, D, to be used for the present value analysis shall be the current after-tax weighted average cost of capital for the Transmission Owners. Based on the foregoing assumptions, the following formulas will be used: Present Value of Cost (X) = PV Cost (X) = Cost (X) / (1+D)N(X) Present Value of Cost (Y) = PV Cost (Y) = Cost (Y) / (1+D)N(Y) Overload X weighting factor = PV Cost (X)/[PV Cost (X) + PV Cost (Y)] Overload Y weighting factor = PV Cost (Y)/[PV Cost (X) + PV Cost (Y)] Applying those formulas, if: Cost (X) = $100 Million and N(X) = 6.25 years Cost (Y) = $25 Million and N(Y) = 4.75 years D = 7.5% per year Then: PV Cost (X) = 100/(1+0.075) 6.25 = 63.635 Million PV Cost (Y) = 25/(1+0.075)4.75 = 17.732 Million Overload X weighting factor = 63.635 / (63.635 + 17.732) = 78.21% Overload Y weighting factor = 17.732 / (63.635 + 17.732) = 21.79% Applying those weighing factors, if: Subzone A cost allocation for Overload X is 15% Subzone A cost allocation fo...
AutoNDA by SimpleDocs

Related to Cost Allocation for Multiple BPTF Thermal Transmission Security Issues

  • Cost Allocation Cost allocation of Generator Interconnection Related Upgrades shall be in accordance with Schedule 11 of Section II of the Tariff.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

Time is Money Join Law Insider Premium to draft better contracts faster.