Common use of Cost Allocation Moratorium Clause in Contracts

Cost Allocation Moratorium. (i) During the five (5) year period commencing on the Operations Date (the “Moratorium Period”), neither the PTOs, pursuant to Section 3.04(b), nor the ISO, pursuant to Section 3.04(e), shall submit filings under Section 205 of the Federal Power Act to modify: (A) the provisions and schedules of the ISO OATT governing the split between PTF and Non-PTF transmission facilities in effect prior to the Operations Date for purposes of allocating costs to Transmission Customers; (B) the provisions and schedules of the ISO OATT establishing the methodology by which the costs of Transmission Upgrades and New Transmission Facilities related to generator interconnections are allocated under the ISO OATT; and (C) the provisions and schedules of the ISO OATT establishing the methodology by which the costs of New Transmission Facilities and Transmission Upgrades are allocated under the ISO OATT; (ii) The Parties’ agreement to forego submission of Section 205 filings during the Moratorium Period with respect to the items listed in Section 3.04(h)(i) (A) through (C) above shall not restrict in any way the rights of the PTOs, pursuant to and in accordance with Sections 3.04(b) or 3.04(a), to submit Section 205 filings to modify any elements of the rates applicable to Transmission Service other than those items listed in Section 3.04(h)(i) (A) through (C). Nothing in this Section 3.04(h) shall restrict in any way the rights of the PTOs to submit Section 205 filings to establish incentive or performance-based rates in accordance with Section 3.04(b)(iii) or to submit Section 205 filings to establish formula or stated rates in accordance with Section 3.04(b)(i), provided that such filings do not propose to modify the items listed in Section 3.04(h)(i) (A) through (C). Nothing in this Section 3.04(h) shall restrict in any way the rights of the ISO, pursuant to and in accordance with Section 3.04(e), to submit Section 205 filings to modify any elements of the rates applicable to Transmission Service other than, provided that such filings do not propose to modify the items listed in Section 3.04(h)(i) (A) through (C). (iii) Notwithstanding Section 3.04(h)(i)(B) above, to the extent that the requirements for any New Transmission Facilities or Transmission Upgrades associated with new or existing generation set forth in the ISO OATT are modified during the Moratorium Period in a manner that creates a new or modified category of generator-related transmission costs, the PTOs shall have the authority, in accordance with Section 3.04(b), to submit Section 205 filings during the Moratorium Period to establish the methodology by which such new or modified generator-related transmission costs are allocated. (iv) Nothing in this Section 3.04(h) shall supersede or alter the effect of any FERC orders concerning the allocation of costs for specific transmission facilities in the New England region. (v) Nothing in this Section 3.04(h) shall restrict in any way the rights of the ISO or of any PTO during the Moratorium Period to submit a filing under Section 206 of the Federal Power Act to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C). (vi) After the end of the Moratorium Period, the PTOs may exercise their rights in accordance with Section 3.04(b)to submit Section 205 filings to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C); provided that: (A) The PTOs must provide the ISO, the Regional State Committee established by the states in the ISO region (the “Regional State Committee”), and stakeholders no less than 90 days advance notification of the proposed filing, including a detailed description of any proposed change to the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto). The PTOs, the ISO and the Regional State Committee shall engage in a process of consultation and negotiation in order to attempt to reach consensus on such filing. (B) At least 30 days prior to the proposed filing date the Regional State Committee may inform the PTOs that the Committee opposes the PTOs’ proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto). (C) If the Regional State Committee opposes the PTOs’ proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto), the PTOs may make the Section 205 filing to modify the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto); provided that: (1) such filing may not go into effect until FERC has approved the filing; (2) the Regional State Committee will have the right to provide the PTOs with an alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) which the PTOs will include in their Section 205 filing and which will be considered on an equal footing with the PTOs’ proposal in the FERC proceeding, and (3) such alternative proposal shall not adversely affect the rights of the affected PTO(s) to fully recover their FERC-allowed revenue requirements and the amount of incentive payments associated with FERC-allowed incentive arrangements for the PTO(s) or result in any costs previously approved or accepted for recovery under either a federal or state-jurisdictional rate thereafter becoming unrecoverable under either a federal or state-jurisdictional rate. (D) If, notwithstanding the requirements of Section 3.04(h)(vi)(C), the Regional State Committee submits an alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) that any PTO believes causes an under-recovery of costs when used in conjunction with the other elements of the rate design for transmission rates filed by the PTOs (or the one already in effect if the PTOs’ filing does not propose to change the rate design), the PTO(s) will have the right: (1) to include in such filing an explanation of why the PTO or PTOs believe the Regional State Committee proposal causes an under-recovery of costs contrary to the requirements of Section 3.04(h)(vi)(C); and (2) to file a modified rate design that eliminates such under-recovery (or a rate mechanism filed by one or more PTOs individually for that purpose, when the under-recovery affects them uniquely) in the event that the alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) is approved by the FERC placed into effect coincident with the effective date of such proposal. (E) Any requirements established by this Section 3.04(h)(vi) with respect to the Regional State Committee shall not subject any PTO or ISO-NE to the jurisdiction or authority of any agent or agency of any state participating in the Regional State Committee. (vii) After the end of the Moratorium Period, the ISO may exercise its rights in accordance with Section 3.04(e) to submit Section 205 filings to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C) if the PTOs fail to alleviate the conditions specified in Section 3.04(e).

Appears in 2 contracts

Samples: Transmission Operating Agreement (Nstar/Ma), Transmission Operating Agreement (Connecticut Light & Power Co)

AutoNDA by SimpleDocs

Cost Allocation Moratorium. (i) During the five (5) year period commencing on the Operations Date (the “Moratorium Period”), neither the PTOs, pursuant to Section 3.04(b), nor the ISO, pursuant to Section 3.04(e), shall submit filings under Section 205 of the Federal Power Act to modify: (A) the provisions and schedules of the ISO OATT governing the split between PTF and Non-PTF transmission facilities in effect prior to the Operations Date for purposes of allocating costs to Transmission Customers; (B) the provisions and schedules of the ISO OATT establishing the methodology by which the costs of Transmission Upgrades and New Transmission Facilities related to generator interconnections are allocated under the ISO OATT; and (C) the provisions and schedules of the ISO OATT establishing the methodology by which the costs of New Transmission Facilities and Transmission Upgrades are allocated under the ISO OATT; (ii) The Parties’ agreement to forego submission of Section 205 filings during the Moratorium Period with respect to the items listed in Section 3.04(h)(i) (A) through (C) above shall not restrict in any way the rights of the PTOs, pursuant to and in accordance with Sections 3.04(b) or 3.04(a), to submit Section 205 filings to modify any elements of the rates applicable to Transmission Service other than those items listed in Section 3.04(h)(i) (A) through (C). Nothing in this Section 3.04(h) shall restrict in any way the rights of the PTOs to submit Section 205 filings to establish incentive or performance-based rates in accordance with Section 3.04(b)(iii) or to submit Section 205 filings to establish formula or stated rates in accordance with Section 3.04(b)(i), provided that such filings do not propose to modify the items listed in Section 3.04(h)(i) (A) through (C). Nothing in this Section 3.04(h) shall restrict in any way the rights of the ISO, pursuant to and in accordance with Section 3.04(e), to submit Section 205 filings to modify any elements of the rates applicable to Transmission Service other than, provided that such filings do not propose to modify the items listed in Section 3.04(h)(i) (A) through (C). (iii) Notwithstanding Section 3.04(h)(i)(B) above, to the extent that the requirements for any New Transmission Facilities or Transmission Upgrades associated with new or existing generation set forth in the ISO OATT are modified during the Moratorium Period in a manner that creates a new or modified category of generator-related transmission costs, the PTOs shall have the authority, in accordance with Section 3.04(b), to submit Section 205 filings during the Moratorium Period to establish the methodology by which such new or modified generator-related transmission costs are allocated. (iv) Nothing in this Section 3.04(h) shall supersede or alter the effect of any FERC orders concerning the allocation of costs for specific transmission facilities in the New England region. (v) Nothing in this Section 3.04(h) shall restrict in any way the rights of the ISO or of any PTO during the Moratorium Period to submit a filing under Section 206 of the Federal Power Act to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C). (vi) After the end of the Moratorium Period, the PTOs may exercise their rights in accordance with Section 3.04(b)to submit Section 205 filings to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C); provided that: (A) The PTOs must provide the ISO, the Regional State Committee established by the states in the ISO region (the “Regional State Committee”), and stakeholders no less than 90 days advance notification of the proposed filing, including a detailed description of any proposed change to the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto). The PTOs, the ISO and the Regional State Committee shall engage in a process of consultation and negotiation in order to attempt to reach consensus on such filing. (B) At least 30 days prior to the proposed filing date the Regional State Committee may inform the PTOs that the Committee opposes the PTOs’ proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto). (C) If the Regional State Committee opposes the PTOs’ proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto), the PTOs may make the Section 205 filing to modify the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto); provided that: (1) such filing may not go into effect until FERC has approved the filing; (2) the Regional State Committee will have the right to provide the PTOs with an alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) which the PTOs will include in their Section 205 filing and which will be considered on an equal footing with the PTOs’ proposal in the FERC proceeding, and (3) such alternative proposal shall not adversely affect the rights of the affected PTO(s) to fully recover their FERC-allowed revenue requirements and the amount of incentive payments associated with FERC-allowed incentive arrangements for the PTO(s) or result in any costs previously approved or accepted for recovery under either a federal or state-jurisdictional rate thereafter becoming unrecoverable under either a federal or state-jurisdictional rate. (D) If, notwithstanding the requirements of Section 3.04(h)(vi)(C), the Regional State Committee submits an alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) that any PTO believes causes an under-recovery of costs when used in conjunction with the other elements of the rate design for transmission rates filed by the PTOs (or the one already in effect if the PTOs’ filing does not propose to change the rate design), the PTO(s) will have the right: (1) to include in such filing an explanation of why the PTO or PTOs believe the Regional State Committee proposal causes an under-recovery of costs contrary to the requirements of Section 3.04(h)(vi)(C); and (2) to file a modified rate design that eliminates such under-recovery (or a rate mechanism filed by one or more PTOs individually for that purpose, when the under-recovery affects them uniquely) in the event that the alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) is approved by the FERC placed into effect coincident with the effective date of such proposal. (E) Any requirements established by this Section 3.04(h)(vi) with respect to the Regional State Committee shall not subject any PTO or ISO-NE to the jurisdiction or authority of any agent or agency of any state participating in the Regional State Committee. (vii) After the end of the Moratorium Period, the ISO may exercise its rights in accordance with Section 3.04(e) to submit Section 205 filings to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C) if the PTOs fail to alleviate the conditions specified in Section 3.04(e). (i) The ISO shall have sole authority to submit Section 205 filings to recover its administrative, capital and other costs (including the collection of funds from Transmission Customers to support payment of FERC annual charges with respect to transmission service for which the ISO is the Transmission Provider as defined in FERC rules and orders) including the design of any charges therefore (the “ISO Administrative Charge”). (j) Nothing in this Agreement shall restrict in any way the rights of the ISO or of any PTO to submit an application under Section 206 of the Federal Power Act for revisions to the rates, terms and conditions of service under the ISO OATT. Nothing in this Agreement shall subject any Publicly-Owned PTO to regulation of rates and charges applicable to its transmission facilities under Sections 205 or 206 of the Federal Power Act; provided, however, that the justness and reasonableness of regional transmission rates or charges may be evaluated in light of the levels of, and manner in which, the costs of Publicly-Owned PTOs’ transmission facilities are recovered under regional transmission rates. (k) Nothing in this Agreement shall restrict in any way the rights of any PTO to submit a proposal under Section 205 of the Federal Power Act to participate in, join, or become an ITC pursuant to Attachment M to the ISO OATT and, upon approval of such proposal, to withdraw from this Agreement in accordance with Section 10.01 of this Agreement.

Appears in 2 contracts

Samples: Transmission Operating Agreement, Transmission Operating Agreement

AutoNDA by SimpleDocs

Cost Allocation Moratorium. (i) During the five (5) year period commencing on the Operations Date (the “Moratorium Period”), neither the PTOs, pursuant to Section 3.04(b), nor the ISO, pursuant to Section 3.04(e), shall submit filings under Section 205 of the Federal Power Act to modify: (A) the provisions and schedules of the ISO OATT governing the split between PTF and Non-PTF transmission facilities in effect prior to the Operations Date for purposes of allocating costs to Transmission Customers; (B) the provisions and schedules of the ISO OATT establishing the methodology by which the costs of Transmission Upgrades and New Transmission Facilities related to generator interconnections are allocated under the ISO OATT; and (C) the provisions and schedules of the ISO OATT establishing the methodology by which the costs of New Transmission Facilities and Transmission Upgrades are allocated under the ISO OATT; (ii) The Parties’ agreement to forego submission of Section 205 filings during the Moratorium Period with respect to the items listed in Section 3.04(h)(i) (A) through (C) above shall not restrict in any way the rights of the PTOs, pursuant to and in accordance with Sections 3.04(b) or 3.04(a), to submit Section 205 filings to modify any elements of the rates applicable to Transmission Service other than those items listed in Section 3.04(h)(i) (A) through (C). Nothing in this Section 3.04(h) shall restrict in any way the rights of the PTOs to submit Section 205 filings to establish incentive or performance-based rates in accordance with Section 3.04(b)(iii) or to submit Section 205 filings to establish formula or stated rates in accordance with Section 3.04(b)(i), provided that such filings do not propose to modify the items listed in Section 3.04(h)(i) (A) through (C). Nothing in this Section 3.04(h) shall restrict in any way the rights of the ISO, pursuant to and in accordance with Section 3.04(e), to submit Section 205 filings to modify any elements of the rates applicable to Transmission Service other than, provided that such filings do not propose to modify the items listed in Section 3.04(h)(i) (A) through (C). (iii) Notwithstanding Section 3.04(h)(i)(B) above, to the extent that the requirements for any New Transmission Facilities or Transmission Upgrades associated with new or existing generation set forth in the ISO OATT are modified during the Moratorium Period in a manner that creates a new or modified category of generator-related transmission costs, the PTOs shall have the authority, in accordance with Section 3.04(b), to submit Section 205 filings during the Moratorium Period to establish the methodology by which such new or modified generator-related transmission costs are allocated. (iv) Nothing in this Section 3.04(h) shall supersede or alter the effect of any FERC orders concerning the allocation of costs for specific transmission facilities in the New England region. (v) Nothing in this Section 3.04(h) shall restrict in any way the rights of the ISO or of any PTO during the Moratorium Period to submit a filing under Section 206 of the Federal Power Act to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C). (vi) After the end of the Moratorium Period, the PTOs may exercise their rights in accordance with Section 3.04(b)to submit Section 205 filings to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C); provided that: (A) The PTOs must provide the ISO, the Regional State Committee established by the states in the ISO region (the “Regional State Committee”), and stakeholders no less than 90 days advance notification of the proposed filing, including a detailed description of any proposed change to the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto). The PTOs, the ISO and the Regional State Committee shall engage in a process of consultation and negotiation in order to attempt to reach consensus on such filing. (B) At least 30 days prior to the proposed filing date the Regional State Committee may inform the PTOs that the Committee opposes the PTOs’ proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto). (C) If the Regional State Committee opposes the PTOs’ proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto), the PTOs may make the Section 205 filing to modify the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto); provided that: (1) such filing may not go into effect until FERC has approved the filing; (2) the Regional State Committee will have the right to provide the PTOs with an alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) which the PTOs will include in their Section 205 filing and which will be considered on an equal footing with the PTOs’ proposal in the FERC proceeding, and (3) such alternative proposal shall not adversely affect the rights of the affected PTO(s) to fully recover their FERC-allowed revenue requirements and the amount of incentive payments associated with FERC-allowed incentive arrangements for the PTO(s) or result in any costs previously approved or accepted for recovery under either a federal or state-jurisdictional rate thereafter becoming unrecoverable under either a federal or state-jurisdictional rate. (D) If, notwithstanding the requirements of Section 3.04(h)(vi)(C), the Regional State Committee submits an alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) that any PTO believes causes an under-recovery of costs when used in conjunction with the other elements of the rate design for transmission rates filed by the PTOs (or the one already in effect if the PTOs’ filing does not propose to change the rate design), the PTO(s) will have the right: (1) to include in such filing an explanation of why the PTO or PTOs believe the Regional State Committee proposal causes an under-under- recovery of costs contrary to the requirements of Section 3.04(h)(vi)(C); and (2) to file a modified rate design that eliminates such under-recovery (or a rate mechanism filed by one or more PTOs individually for that purpose, when the under-recovery affects them uniquely) in the event that the alternative proposal to change the cost allocation provisions set forth in Schedules 11 or 12 of the ISO OATT as of the Operations Date (or the successors thereto) is approved by the FERC placed into effect coincident with the effective date of such proposal. (E) Any requirements established by this Section 3.04(h)(vi) with respect to the Regional State Committee shall not subject any PTO or ISO-NE to the jurisdiction or authority of any agent or agency of any state participating in the Regional State Committee. (vii) After the end of the Moratorium Period, the ISO may exercise its rights in accordance with Section 3.04(e) to submit Section 205 filings to modify the provisions and schedules described in Section 3.04(h)(i) (A) through (C) if the PTOs fail to alleviate the conditions specified in Section 3.04(e).

Appears in 1 contract

Samples: Transmission Operating Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!