Counted As Single Response Sample Clauses

Counted As Single Response. Each incident will be counted as a single response regardless of the number of Ambulances that respond.
AutoNDA by SimpleDocs

Related to Counted As Single Response

  • REQUIRED PRICE PROPOSAL RESPONSE All pricing must be fixed cost, inclusive of all expenses and fees if this Statement of Work proposal is for a fixed price agreement. (Remove if Time and Materials agreement) For Time and Materials the pricing proposal must include estimated effort hours, hourly rate for proposed personnel, projected timeline, including timing expectations for the State functional and technical resources and be submitted as a separate document from the rest of the proposal. (Remove if not Time and Materials)

  • Waist to Shoulder Full abilities Up to 5 kilograms 5 - 10 kilograms Other (please specify): Stair Climbing: Full abilities Up to 5 steps 6 - 12 steps Other (please specify): Use of hand(s):Left Hand Right Hand Gripping Gripping Pinching Pinching Other (please specify): Other (please specify): APPENDIX B – ABILITIES FORM Bending/twisting repetitive movement of (please specify): Work at or above shoulder activity: Chemical exposure to: Travel to Work: Ability to use public transit Ability to drive car Yes Yes No No

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Optional Xactimate Response Attachment (Part 2)

  • Limitation de responsabilité DANS LA MESURE OÙ LA LÉGISLATION EN VIGUEUR NE L’INTERDIT PAS, EN AUCUN CAS APPLE NE SERA RESPONSABLE DE DOMMAGE CORPOREL NI DE QUELCONQUE DOMMAGE ACCIDENTEL, SPÉCIAL, INDIRECT OU ACCESSOIRE, Y COMPRIS DE FAÇON NON LIMITATIVE, LES DOMMAGES DUS AUX PERTES DE BÉNÉFICES, PERTES DE DONNÉES OU D’INFORMATIONS, INTERRUPTION DES ACTIVITÉS OU TOUT AUTRE DOMMAGE COMMERCIAL OU PERTE COMMERCIALE RÉSULTANT DE OU RELATIFS À VOTRE UTILISATION OU VOTRE INAPTITUDE À UTILISER LE LOGICIEL APPLE ET LES SERVICES OU TOUT LOGICIEL XX XXXXXX PARTIE CONJOINTEMENT AVEC LE LOGICIEL APPLE, QUELLE QU’EN SOIT LA CAUSE, SANS TENIR COMPTE DE LA THÉORIE DE LA RESPONSABILITÉ (QUE CE SOIT POUR RUPTURE DE CONTRAT, EN RESPONSABILITÉ CIVILE, OU AUTRE) ET MÊME SI APPLE A ÉTÉ INFORMÉ DE LA POSSIBILITÉ DE TELS DOMMAGES. CERTAINES JURIDICTIONS NE PERMETTANT PAS LA LIMITATION DE RESPONSABILITÉ POUR DOMMAGES PERSONNELS, INDIRECTS OU ACCESSOIRES, IL EST POSSIBLE QUE CETTE LIMITATION NE VOUS CONCERNE PAS. La responsabilité totale d’Apple envers vous au titre de tout dommage (en dehors de ce que la législation pourrait exiger dans les cas impliquant une blessure) n’excédera en aucun cas la somme de cinquante dollars (50 $). Les limitations susdites s’appliqueront même si le recours indiqué ci-dessus fait défaut à sa vocation essentielle.

  • Timely and Sustained Response Interconnection Customer shall ensure that the Small Generating Facility’s real power response to sustained frequency deviations outside of the deadband setting is automatically provided and shall begin immediately after frequency deviates outside of the deadband, and to the extent the Small Generating Facility has operating capability in the direction needed to correct the frequency deviation. Interconnection Customer shall not block or otherwise inhibit the ability of the governor or equivalent controls to respond and shall ensure that the response is not inhibited, except under certain operational constraints including, but not limited to, ambient temperature limitations, physical energy limitations, outages of mechanical equipment, or regulatory requirements. The Small Generating Facility shall sustain the real power response at least until system frequency returns to a value within the deadband setting of the governor or equivalent controls. An Applicable Reliability Standard with equivalent or more stringent requirements shall supersede the above requirements.

  • Requirement to Have a Single Audit The Subrecipient will complete the Subrecipient Annual Report annually within 45 days after its fiscal year end, informing the State of Vermont whether or not a Single Audit is required for the prior fiscal year. If a Single Audit is required, the Subrecipient will submit a copy of the audit report to the granting Party within 9 months. If a single audit is not required, only the Subrecipient Annual Report is required. For fiscal years ending before December 25, 2015, a Single Audit is required if the subrecipient expends $500,000 or more in Federal assistance during its fiscal year and must be conducted in accordance with OMB Circular A-133. For fiscal years ending on or after December 25, 2015, a Single Audit is required if the subrecipient expends $750,000 or more in Federal assistance during its fiscal year and must be conducted in accordance with 2 CFR Chapter I, Chapter II, Part 200, Subpart F. The Subrecipient Annual Report is required to be submitted within 45 days, whether or not a Single Audit is required.

  • Emergency Response Partners must develop, maintain, and carry out a response plan for public water system emergencies, including disease outbreaks, spills, operational failures, and water system contamination. Partners must notify DWS in a timely manner of emergencies that may affect drinking water supplies.

  • Firm Response The Department should make an award within sixty (60) days after the date of the opening, during which period responses shall remain firm and shall not be withdrawn. If award is not made within sixty (60) days, the response shall remain firm until either the Department awards the Contract or the Department receives from the bidder written notice that the response is withdrawn. Any response that expresses a shorter duration should, in the Department's sole discretion, be accepted or rejected.

Time is Money Join Law Insider Premium to draft better contracts faster.