CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 (Service Levels) and 6.4.1(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Services only (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii) or 38.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Replacement Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 3 contracts
Samples: Call Off Contract, Call Off Terms for Services, Call Off Contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Remedies
27.1. Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 (Service Levels) and 6.4.1(b) (Delay Payments)arising, if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Services have been Delivered) do any of the following: :
27.1.1 at the Customer's option, give the Supplier the opportunity (at the Supplier's ’s expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; ;
27.1.2 carry out, at the Supplier's ’s expense, any work necessary to make the provision of the Services comply with this Call Off Contract; ;
27.1.3 if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): ):
(a) instruct the Supplier to comply with the Rectification Plan Process; ;
(b) suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 33 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Services; ;
(c) without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Services only (whereupon the relevant provisions of Clause 44 33 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; ;
27.2. Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii27.1.3(b) or 38.1.1(c)(iii27.1.3(c), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Replacement Services.
27.3. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i): 27.1.3(a):
27.3.1 the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. .
27.3.2 the draft Rectification Plan shall set out: :
(a) full details of the Default that has occurred, including a cause analysis; ;
(b) the actual or anticipated effect of the Default; and and
(c) the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable).
27.4. The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 5 of this Call Off Contract Schedule 11 6 (Dispute Resolution Procedure).
27.5. The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: :
27.5.1 is insufficiently detailed to be capable of proper evaluation; ;
27.5.2 will take too long to complete; ;
27.5.3 will not prevent reoccurrence of the Default; and/or and/or
27.5.4 will rectify the Default but in a manner which is unacceptable to the Customer.
27.6. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft.
27.7. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 2 contracts
Samples: Contract for Services, Contract for Services
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 (Service Levels) and 6.4.1(b) (Delay Payments), if the Supplier Service Provider commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Services have been Delivered) do any of the following: at the Customer's option, give the Supplier Service Provider the opportunity (at the SupplierService Provider's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the SupplierService Provider's expense, any work necessary to make the provision of the Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier Service Provider to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Services only (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii) or 38.1.1(c)(iii), the Customer shall have the right to charge the Supplier Service Provider for and the Supplier Service Provider shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Replacement Services. Rectification Plan Process Where the Customer has instructed the Supplier Service Provider to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i): the Supplier Service Provider shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier Service Provider shall submit a draft Rectification Plan even if the Supplier Service Provider disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier Service Provider proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier Service Provider shall promptly provide to the Customer any further documentation that the Customer requires to assess the SupplierService Provider’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 139 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier Service Provider if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier Service Provider whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier Service Provider shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier Service Provider shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier Service Provider shall immediately start work on the actions set out in the Rectification Plan.
Appears in 2 contracts
Samples: Call Off Terms, Call Off Terms
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Contract Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 16.6 (Service LevelsLevels and Service Credits) and 6.4.1(b6.1.11(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's Suppliers expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's Suppliers expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 54 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 54 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii48.1.1(c)(ii) or 38.1.1(c)(iii48.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i48.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s Suppliers root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 101.5 of this Call Off Contract Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Contract Order Form
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 16.6 (Service LevelsLevels and Service Credits) and 6.4.1(b6.1.11(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 59 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 59 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii53.1.1(e) or 38.1.1(c)(iii53.1.1(f), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i53.1.1(d): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 31 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Call Off Contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 15.6 (Service LevelsLevels and Service Credits) and 6.4.1(b6.1.11(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 55 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 55 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii49.1.1(e) or 38.1.1(c)(iii49.1.1(f), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i49.1.1(d): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 28.5 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Call Off Contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Lease Agreement Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 16.6 (Service LevelsLevels and Service Credits) and 6.4.1(b6.1.11(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract Lease Agreement then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract Lease Agreement are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off ContractLease Agreement; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract Lease Agreement (whereupon the relevant provisions of Clause 44 53 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; without terminating or suspending the whole of this Call Off ContractLease Agreement, terminate or suspend this Call Off Contract Lease Agreement in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 53 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii47.1.1(c)(ii) or 38.1.1(c)(iii47.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i47.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a root cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 31.5 of this Call Off Lease Agreement Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Lease Agreement
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising Remedies
4.1 (including under Call Off Schedule 6 (Service Levels and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 (Service Levels) and 6.4.1(bb) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): ):
(i) instruct the Supplier to comply with the Rectification Plan Process; ;
(ii) suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; ;
(iii) without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii) or 38.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: :
(i) full details of the Default that has occurred, including a cause analysis; ;
(ii) the actual or anticipated effect of the Default; and and
(iii) the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 5 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Call Off Contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 (Service Levels) and 6.4.1(bClause6.4.1(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 45 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Services only (whereupon the relevant provisions of Clause 44 45 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii39.1.1(c)(ii) or 38.1.1(c)(iii39.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Replacement Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i39.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 146 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 (Service Levels) and 6.4.1(b) (Delay Payments), if the Supplier Service Provider commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Services have been Delivered) do any of the following: at the Customer's option, give the Supplier Service Provider the opportunity (at the SupplierService Provider's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the SupplierService Provider's expense, any work necessary to make the provision of the Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier Service Provider to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Services only (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii) or 38.1.1(c)(iii), the Customer shall have the right to charge the Supplier Service Provider for and the Supplier Service Provider shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Replacement Services. Rectification Plan Process Where the Customer has instructed the Supplier Service Provider to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i): the Supplier Service Provider shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier Service Provider shall submit a draft Rectification Plan even if the Supplier Service Provider disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier Service Provider proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier Service Provider shall promptly provide to the Customer any further documentation that the Customer requires to assess the SupplierService Provider’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 131 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier Service Provider if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier Service Provider whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier Service Provider shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier Service Provider shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier Service Provider shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Call Off Terms
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising Remedies
4.1 (including under Call Off Schedule 6 (Service Levels and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 (Service Levels) and 6.4.1(bb) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): ):
(i) instruct the Supplier to comply with the Rectification Plan Process; ;
(ii) suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; ;
(iii) without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii) or 38.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.:
Appears in 1 contract
Samples: Call Off Contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 15.6 (Service LevelsLevels and Service Credits) and 6.4.1(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Products and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Products and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Products and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 47 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Products and/or Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Products and/or Services only (whereupon the relevant provisions of Clause 44 47 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii41.1.1(c)(ii) or 38.1.1(c)(iii41.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Products and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Products and/or Replacement Products and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i41.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 5 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Call Off Order Form
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 16.6 (Service LevelsLevels and Service Credits) and 6.4.1(b6.1.11(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 53 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 53 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii47.1.1(c)(ii) or 38.1.1(c)(iii47.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i47.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a root cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 31.5 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Call Off Contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 16.6 (Service LevelsLevels and Service Credits) and 6.4.1(b6.1.11(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Goods and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Goods and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Goods and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 57 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Goods and/or Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Goods and/or Services only (whereupon the relevant provisions of Clause 44 57 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii51.1.1(c)(ii) or 38.1.1(c)(iii51.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Goods and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Goods and/or Replacement Goods and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i51.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 109 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
CUSTOMER REMEDIES FOR DEFAULT. Remedies Without prejudice to any other right or remedy of the Customer howsoever arising (including under Call Off Schedule 6 (Service Levels Levels, Service Credits and Performance Monitoring)) and subject to the exclusive financial remedy provisions in Clauses 13.6 15.6 (Service LevelsLevels and Service Credits) and 6.4.1(b) (Delay Payments), if the Supplier commits any Default of this Call Off Contract then the Customer may (whether or not any part of the Products and/or Services have been Delivered) do any of the following: at the Customer's option, give the Supplier the opportunity (at the Supplier's expense) to remedy the Default together with any damage resulting from such Default (where such Default is capable of remedy) or to supply Replacement Products and/or Services and carry out any other necessary work to ensure that the terms of this Call Off Contract are fulfilled, in accordance with the Customer's instructions; carry out, at the Supplier's expense, any work necessary to make the provision of the Products and/or Services comply with this Call Off Contract; if the Default is a material Default that is capable of remedy (and for these purposes a material Default may be a single material Default or a number of Defaults or repeated Defaults - whether of the same or different obligations and regardless of whether such Defaults are remedied - which taken together constitute a material Default): instruct the Supplier to comply with the Rectification Plan Process; suspend this Call Off Contract (whereupon the relevant provisions of Clause 44 47 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) the Products and/or Services; without terminating or suspending the whole of this Call Off Contract, terminate or suspend this Call Off Contract in respect of part of the provision of the Products and/or Services only (whereupon the relevant provisions of Clause 44 47 (Partial Termination, Suspension and Partial Suspension) shall apply) and step-in to itself supply or procure a third party to supply (in whole or in part) such part of the Good and/or Services; Where the Customer exercises any of its step-in rights under Clauses 38.1.1(c)(ii41.1.1(c)(ii) or 38.1.1(c)(iii41.1.1(c)(iii), the Customer shall have the right to charge the Supplier for and the Supplier shall on demand pay any costs reasonably incurred by the Customer (including any reasonable administration costs) in respect of the supply of any part of the Products and/or Services by the Customer or a third party and provided that the Customer uses its reasonable endeavours to mitigate any additional expenditure in obtaining Replacement Products and/or Replacement Products and/or Services. Rectification Plan Process Where the Customer has instructed the Supplier to comply with the Rectification Plan Process pursuant to Clause 38.1.1(c)(i41.1.1(c)(i): the Supplier shall submit a draft Rectification Plan to the Customer for it to review as soon as possible and in any event within 10 (ten) Working Days (or such other period as may be agreed between the Parties) from the date of Customer’s instructions. The Supplier shall submit a draft Rectification Plan even if the Supplier disputes that it is responsible for the Default giving rise to the Customer’s request for a draft Rectification Plan. the draft Rectification Plan shall set out: full details of the Default that has occurred, including a cause analysis; the actual or anticipated effect of the Default; and the steps which the Supplier proposes to take to rectify the Default (if applicable) and to prevent such Default from recurring, including timescales for such steps and for the rectification of the Default (where applicable). The Supplier shall promptly provide to the Customer any further documentation that the Customer requires to assess the Supplier’s root cause analysis. If the Parties do not agree on the root cause set out in the draft Rectification Plan, either Party may refer the matter to be determined by an expert in accordance with paragraph 164 133 of this Call Off Schedule 11 (Dispute Resolution Procedure). The Customer may reject the draft Rectification Plan by notice to the Supplier if, acting reasonably, it considers that the draft Rectification Plan is inadequate, for example because the draft Rectification Plan: is insufficiently detailed to be capable of proper evaluation; will take too long to complete; will not prevent reoccurrence of the Default; and/or will rectify the Default but in a manner which is unacceptable to the Customer. The Customer shall notify the Supplier whether it consents to the draft Rectification Plan as soon as reasonably practicable. If the Customer rejects the draft Rectification Plan, the Customer shall give reasons for its decision and the Supplier shall take the reasons into account in the preparation of a revised Rectification Plan. The Supplier shall submit the revised draft of the Rectification Plan to the Customer for review within five (5) Working Days (or such other period as agreed between the Parties) of the Customer’s notice rejecting the first draft. If the Customer consents to the Rectification Plan, the Supplier shall immediately start work on the actions set out in the Rectification Plan.
Appears in 1 contract
Samples: Call Off Contract