Damage to or Destruction of the Energy Production Facility Sample Clauses

Damage to or Destruction of the Energy Production Facility 
AutoNDA by SimpleDocs

Related to Damage to or Destruction of the Energy Production Facility

  • DAMAGE TO FACILITIES The Student will promptly report damages and request necessary repairs, in accordance with established and published procedures. The Student is responsible for damages caused by the Student. Damages to shared or common areas not attributable to a responsible person are the joint responsibility of all persons sharing the space or area. UCF DHRL reserves the right to charge the Student for damages caused by the Student. Charges may include, but are not limited to, extraordinary pest control charges, repair of walls, furniture or fixtures, and damages to common areas. UCF DHRL also reserves the right to charge the Student for a portion of damages caused to spaces shared by the Student when the person responsible for damages to shared spaces cannot be identified.

  • Damage to Equipment The Parties shall exercise all necessary precautions to avoid causing damage to the other Party’s poles and Equipment and other pole attachers’ Equipment and shall assume responsibility to each other for any and all loss from any damage to the other Party’s poles or Equipment and reimburse the other Party for the entire expense incurred in making such repairs. Each Party shall assume responsibility to third parties for any and all loss from any damage caused to third party’s Equipment by such Party and shall reimburse such third party for the entire expense incurred in making repairs.

  • Damage to Property Exhibitor is liable for any damage caused to building floors, walls or columns, or to standard booth equipment, or to other Exhibitor’s property. Exhibitor may not apply paint, lacquer, adhesives, or other coating to building columns and floors or to standard booth equipment.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • Condition of the Contractor’s Property or Equipment The Contractor shall make the Property and/or equipment available to the Judicial Council, pursuant to the terms and conditions set forth in this Agreement. The Contractor shall immediately remedy any problem with the Property’s physical plant or equipment that impairs or diminishes the quality of the Program. The Contractor shall ensure the appropriate hot water, heating, and ventilation is provided at the Property during the Program, inclusive in the prices set forth herein.

  • DAMAGE TO THE PROPERTY If the property is damaged, by fire or other casualty, after the Effective Date and before the Closing, the Seller will bear the risk of loss and the Buyer may cancel this Agreement without liability and the Escrow Money shall be returned to the Buyer. Alternatively, the Buyer will have the option of purchasing the Property at the agreed-upon Purchase Price and the Seller will credit the deductible, if any, and transfer to the Buyer at Closing any insurance proceeds or Seller's claim to any insurance proceeds payable for the damage. The Seller will cooperate with and assist the Buyer in collecting any such proceeds. The Seller shall not settle any insurance claim for damage caused by casualty without the consent of the Buyer. Furthermore, if any part of the Property, after the Effective Date and before the Closing, is taken in condemnation or under the right of eminent domain, or proceedings for such taking are pending or threatened, the Buyer may cancel this Agreement without liability and the Escrow Money will be returned to the Buyer. Alternatively, the Buyer will have the option of purchasing what is left of the Property at the agreed-upon Purchase Price and the Seller will transfer to the Buyer at Closing the proceeds of any award or the Seller's claim to any award payable for the taking. The Seller will cooperate with and assist the Buyer in collecting such an award.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

Time is Money Join Law Insider Premium to draft better contracts faster.