Damp Proof Course Sample Clauses

Damp Proof Course. Damp proof course shall either be with cement concrete or with cement mortar of specified thickness as mentioned in the relevant item of schedule. Damp proof course shall not be carried across doorways. It shall be laid for all walls except verandah retaining wall or for particular wall only directed by the Engineer-in-charge. It shall be laid flush with floor level or as instructed by the Engineer-in-charge. Damp proof course with cement concrete shall be of 25 or 38 mm thick in cement concrete M15/M20 as specified using 12mm. and down size aggregate well rammed and smoothened with trowel. It will be kept wet for 40 hours and after it has dried, two coats of hot bitumen shall be applied over it and allowed it to dry after which sand shall be sprinkled over it. Damp proof course with cement mortar shall be 12 or 20 mm thick in cement mortar 1:3 well mixed with crude oil at 5% by weight of cement used.
AutoNDA by SimpleDocs
Damp Proof Course. 5.1 Laying of vertical and horizontal damp proof course is to be in accordance with the regulations laid down by the Sanitary Authorities. The horizontal damp proof courses on walls are to consist of a mixture of pitch and sand applied hot. 5.2 The vertical damp proof membrane shall consist of 3mm thick water proofing membrane as specified under specifications for Roofing Works. The dpm shall be carried 150mm into the surrounding walls over the horizontal dpc (laps at joints shall not be measured extra).
Damp Proof Course. Damp proof course shall consist of a layer of 50 mm thick cement concrete (M- 15/ M-20). Over the layer of cement concrete, a thick coat of mineral asphalt (heated to 350 degree F to 400 degree F) shall be laid. The work shall be measured in square meter of specified thickness. Rate shall include cost of all materials and labour involved in all the above operations. All sanitary block floors shall be laid over a continuous bitumen damp proof course similar to above and to vertical faces of the wall for a height of 300 mm. and turned horizontally to a length of 150 mm. and shall be properly fused and made water tight around all plumbing work.
Damp Proof Course. Providing and laying damp proof course of cement concrete 1:2: 4 (using cement, sand and shingle), including bitumen coating :- b) with 2 coats of bitumen i) 1½" thick (40 mm) 100 .Sft 1531.00 5,279.85
Damp Proof Course 

Related to Damp Proof Course

  • Jury Duty and Court Appearances Leave of absence without loss of pay and benefits will be provided to an employee summoned to serve on a jury or when subpoenaed or summoned as a witness in a criminal or civil proceeding not occasioned by the employee's private affairs, or when the employee accompanies a dependent child when the child is subpoenaed or summoned to appear as a witness in a criminal or civil proceeding. An employee in receipt of pay or benefits under this Article has the responsibility to reimburse the employer all monies paid to him/her by the Court, except travelling and meal allowances not reimbursed by the employer.

  • Cooperation with Economic Studies If ICANN initiates or commissions an economic study on the impact or functioning of new generic top-­‐level domains on the Internet, the DNS or related matters, Registry Operator shall reasonably cooperate with such study, including by delivering to ICANN or its designee conducting such study all data related to the operation of the TLD reasonably necessary for the purposes of such study requested by ICANN or its designee, provided, that Registry Operator may withhold (a) any internal analyses or evaluations prepared by Registry Operator with respect to such data and (b) any data to the extent that the delivery of such data would be in violation of applicable law. Any data delivered to ICANN or its designee pursuant to this Section 2.15 that is appropriately marked as confidential (as required by Section 7.15) shall be treated as Confidential Information of Registry Operator in accordance with Section 7.15, provided that, if ICANN aggregates and makes anonymous such data, ICANN or its designee may disclose such data to any third party. Following completion of an economic study for which Registry Operator has provided data, ICANN will destroy all data provided by Registry Operator that has not been aggregated and made anonymous.

  • Further Actions Each party agrees to perform such further acts and execute such further documents as are necessary to effectuate the purposes hereof.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!