Design and Construction. In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.
Design and Construction. The System Upgrade Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless NYSEG and TrAILCo agree on another mutually acceptable deadline, TrAILCo shall deliver to NYSEG “as‐built” drawings, information and documents for the System Upgrade Facilities, such as: a one‐line diagram, a site plan showing the Watercure Line (as segmented) and the System Upgrade Facilities, plan and elevation drawings showing the layout of the System Upgrade Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with TrAILCo’s step‐down transformers, the facilities connecting the Watercure Line to the step‐down transformers and the System Upgrade Facilities, and the impedances (determined by factory tests) for the associated step‐down transformers and the Watercure Line. NYSEG shall provide to TrAILCo, and coordinate with TrAILCo, with respect to proposed specifications for the Watercure Line control and protection settings, transformer tap settings, and communications, if applicable. NYSEG and TrAILCo shall confer with the NYISO and PJM regarding the transfer of operational control of the System Upgrade Facilities to the NYISO, or PJM, as applicable, upon completion of such facilities.
Design and Construction. Without limiting the Contractor's obligations under the Contract or otherwise at law or in equity, the Contractor must: design the parts of the Works which the Contract requires it to design; and construct the Works, in a manner which: complies with the requirements of the ESD and WOL Plan; and xxxxxxxxx the achievement of the ESD Principles and the WOL Objectives.
Design and Construction. The Project shall be designed and constructed in accordance with NYSDOT standards and specifications and subject to NYSDOT approval. Design shall be under the supervision of a professional engineer or architect licensed in this State. Construction shall be under the supervision of a professional engineer or architect or other professional as agreed to by NYSDOT. All improvements undertaken pursuant to this Agreement will be designed, with normal maintenance, to render any bridge provided or improved hereunder structurally sound for a minimum period of 30 years, and any highway provided or improved hereunder structurally sound for a minimum period of 20 years, and any appurtenances provided or improved hereunder structurally sound for a minimum period of 10 years.
Design and Construction. Such Borrower shall design, ----------------------- construct, equip and operate its Systems substantially as previously disclosed to Lenders in the Milestone Plan and in accordance with prudent industry standards.
Design and Construction. 26
5.1 General Obligations of Developer; Scope of Initial Design and Construction 26 5.2 Performance, Design and Construction Standards; Deviations 27
Design and Construction. The Subrecipient shall cause this Project to be designed and constructed in accordance with plans and specifications delivered to, and approved by, the County and consistent with SCHEDULE A. The Subrecipient shall proceed with the acquisition and expeditious construction of the Project in conformity with law, with this Agreement, and with all applicable requirements of governmental authorities having jurisdiction with respect thereto.
Design and Construction. It is the intent of the Parties to keep each other fully informed as part of the process for the development, design, financing, and construction of the Stadium Project. • StadiumCo is the party responsible for the design, development and construction of the Stadium Project and, in discharging such obligation, StadiumCo will contract with and direct the architect(s), construction manager, and other professionals in the design and construction of the Stadium Project. The City will have final approval rights over the architect and the construction manager recommended by StadiumCo, which approval will not be unreasonably conditioned, withheld or delayed; provided that the City hereby approves the architects and contractors (construction manager, general contractor, or design-builder depending on delivery method chosen) identified on Exhibit 3. • The architect-engineer design team and contractor will have at least ten years of experience in the design, development and construction of comparable sports stadiums, arenas, and/or public assembly facilities. • The City will have the right to review the contract terms for the architect-engineer design team and contractor to ensure that the Stadium Project will be completed and in accordance with terms and conditions of the Stadium Lease and Development Agreement. • The City will have monitoring rights over Stadium Project construction. Such monitoring rights may include, at the City’s discretion, the City contracting with a construction monitor to review the Stadium Project construction for compliance with approved plans and specifications and all other applicable requirements. The costs of such construction monitor and the City’s otherwise exercising its monitoring rights and other professional fees incurred by the City in connection with the Stadium Project will be borne by the City. • The Stadium Lease and Development Agreement will include covenants between the parties on the construction schedule to include completion date, consequences of a delayed opening and construction completion guarantees. • The City and StadiumCo will put in place, manage and mutually agree upon a design process for the Stadium Project whereby the City and the StadiumCo will have direct input and will participate in developing a design that meets their respective requirements, satisfies all MLS requirements and achieves the best possible project within the agreed-upon program description and Budgeted Cost (see below). • The “Quality Sta...
Design and Construction. The Owner shall be responsible for ensuring that all design, construction supervision and inspection of all off-site civil works and site servicing is performed by a consulting civil engineer and all such work is subject to the approval of the City Engineer. The Owner shall ensure that all drawings conform to City standards and requirements. The Owner shall ensure that all engineering drawing submissions are in accordance with the City’s “Engineering Drawing Submission Requirements” Policy, including the required number of sets and drawings required for submissions. The Owner shall ensure that Quality Control and Assurance Plans are provided in accordance with the Subdivision, Development & Servicing Bylaw No. 7900 (refer to Part 5 and Schedule 3). The Owner shall ensure that a “Consulting Engineering Confirmation Letter” (City document ‘C’) is completed prior to submission of any designs.
Design and Construction. Without limiting the Subcontractor’s obligations under the Subcontract or otherwise at law or in equity, the Subcontractor must: design the parts of the Subcontract Works which the Subcontract requires it to design; and construct the Subcontract Works, in a manner which: complies with the requirements of the ESD and WOL Plan; and xxxxxxxxx the achievement of the ESD Principles and the WOL Objectives.