DESIGN REQUIREMENTS FOR SUPPLY OF RAW MATERIALS AND UTILITIES Sample Clauses

DESIGN REQUIREMENTS FOR SUPPLY OF RAW MATERIALS AND UTILITIES. The information contained in this section is provided to assist the Owner in the evaluation and design of the support facilities, including the supply of raw materials and utilities, yard piping, electric feeder system, etc. required for the operation of the plant at 665 STPD (~600 MTPD). Item: Ammonia (What are the conditions?) Conditions: Supplied at pipe rack elevation as either liquid at 200-220 psig and approximately 40 °F at, with a maximum water content of 0.5 wt.%., or as vapor from a proposed ammonia plant at XXX psig and YYY oF. Remarks: In normal operation, the required flow is approximately 26,486 lb/h, but the system should be sized for at least 30,500 lb/h. Item: High Pressure Steam Export Conditions: Supplied at pipe rack elevation at 600 psig and 750 °F. Remarks: In normal operation, the flow is approximately 74,644 lb/h. The system should be sized for 100,000 lb/h. Item: High Pressure Steam Import at Startup Conditions: Supplied at pipe rack elevation at 600 psig and 750 °F.
AutoNDA by SimpleDocs

Related to DESIGN REQUIREMENTS FOR SUPPLY OF RAW MATERIALS AND UTILITIES

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Solicitations for Subcontracts, Including Procurement of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Local Government for work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier will be notified by the Local Government of the Local Government’s obligations under this Agreement and the Acts and Regulations relative to Nondiscrimination on the grounds of race, color, or national origin.

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • Solicitations for Subcontracts, Including Procurements of Materials and Equipment In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Engineer of the Engineer's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

  • Minimum Customer Support Requirements for TIPS Sales Vendor shall provide timely and commercially reasonable support for TIPS Sales or as agreed to in the applicable Supplemental Agreement.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • Packaging Materials and Containers for Retail Sale 1. When packaging materials and containers in which a good is packaged for retail sales are classified in the Harmonized System with the good, they shall not be taken into account in determining whether all non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4.03. 2. When the good is subject to a requirement of regional value content, the value of these packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Packing Materials and Containers for Shipment Packing materials and containers in which the good is packed for shipment shall be disregarded in determining whether-- (i) the non-originating materials used in the production of the good undergo an applicable change in tariff classification set out in subdivision (t) of this note; and (ii) the good satisfies a regional value-content requirement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!