Detailed Specification Sample Clauses

Detailed Specification. A. Landing area slash 1. Machine pile all slash (except for slash that is too small to be effectively piled), this would be defined as at least 4 inches in diameter, and at least 4 feet long, that is on the cleared landing during skidding and decking operations. 2. Slash piles shall be located at least 35 feet from the bole of any dead, or live tree, or equal-distance between standing dead or live trees, whichever is greater. Piles shall be free of dirt and rocks. 3. Piles shall be a minimum of 4 feet in height and 12 feet in diameter, where practicable, and as compact as possible. Pile shall be free of dirt and rocks to facilitate clean and rapid consumption. 4. Do not include stumps from landing and decking area. Construction stumps shall be yarded into locations approved by the Forest Service. 5. All material extending beyond the general contour of the piled slash shall be trimmed off and added to the pile. 6. Slash shall be scattered in areas, where necessary to use for erosion control, or where minimum pile height cannot be met. 7. A fireline that is no less than 10 foot width, to bare mineral soil shall be constructed around each slash pile.
AutoNDA by SimpleDocs
Detailed Specification. Gas Suppression System
Detailed Specification. Item No 1 Carry out 1m x 1 m grid survey work by total station in reference to GTS benchmark or Benchmark suggested by engineer in charge along the corridor including marking of center line of alignment with GPS , taking ground level ,details of all existing structures, Electric poles, trees, overhead electrical lines including fixing necessary reference RCC pillars, establishing bench mark, establishing day light lines on ground and submission of Survey Drawing with readable spot level, longitudinal section, cross section and drawing report of survey work as directed. a) Item shall be executed as specified in the item description and specified as below. b) Conducting topographical survey in the specified area indicating all permanent features like Highways, Roads, Rivers, nallas, lakes, ponds, culverts, existing structures, transmission lines, telegraphs, telephones and electric poles, cross drainage works etc. and plotting the same showing true North including establishing survey reference stations including supply of all equipment, instruments, personnel, labours, etc., required to complete the work as directed by of Engineer - in - Charge. c) Spot level with respect to GTS benchmark of Survey of India or Benchmark suggested by engineer in charge in a grid of 1 meter both ways, showing true North including establishing survey reference stations and supply of equipment, instruments, personnel, labours, etc., required to complete the work. L-section, cross section shall be prepared and submitted. Centerline and all the day light lines with respect to GPS are marked on ground surface in prior to starts the work. d) Providing and constructing Pillars of 0.5 m x 0.5 m x 1 m at every 200m interval for TBM and PBM as required. e) All the Drawings and report containing all the details regarding survey shall be submitted in Hard copy and Soft copy (Drawing and PDF). f) Prepare and submit working drawings viz. i) Plan and Profile with daylight line, ii) cross sections (20m interval) for the entire corridor width including embankment, service lane, gutter etc. and iii) Longitudinal profile of side gutter in A2 drawings (both soft and hard copies) with the approval of Engineer in charge. Contractor has to submit as built drawings of all the components as directed by engineer in charge. g) The Item shall be measured in hectare. h) The rate includes all materials, labor, equipments, formwork, curing and painting, Printing etc. & everything required to complete this i...
Detailed Specification a. The details of the required services are outlined in the tender request email issued by SWT on [XXXX] June 2024]. b. The methods and outputs to be followed are as proposed ln the Contractor's Quote Ref: [XXXX] and c. sent to SWT on DATE. c. The documents described above form part of this contract.
Detailed Specification. Unless otherwise specified or authorized by the City, all labor, routine and extra work performed under this agreement shall include the furnishing of all labor, supervision, equipment, tools, fuel, materials (unless provided by the City in accordance with these documents), insurance, bonding, and all other items incidental thereto which are necessary to perform the work as specified, for Tree Pruning, Removal and Other Related Services that will promote the health, appearance, and safe management of the City’s urban forest. The Contractor shall provide a yard for parking, maintenance, and storage of all equipment at a site other than on City property and at no added cost to the City. For the convenience of the City, and only when space is available, the Contractor may be permitted to place a materials storage unit on City property. Any such storage unit so placed shall be removed from City property immediately when requested to do so by City representative
Detailed Specification. The RAF requires services of a suitable service provider to conduct an Organisational Structure Review and Skills Audit Assessment as a holistic service.

Related to Detailed Specification

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • The Specifications The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

  • Packing Specifications 7.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.