Common use of Developer Access Clause in Contracts

Developer Access. The easement to be granted to the Connecting Transmission Owner shall be subject to Developer’s rights to access its Developer’s Attachment Facilities within the Cricket Valley Substation, subject to the Connecting Transmission Owner’s reasonable rules and regulations regarding access to the Cricket Valley Substation, including the Connecting Transmission Owner’s security requirements. APPENDIX D SECURITY ARRANGEMENTS DETAILS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. APPENDIX E COMMERCIAL OPERATION DATE [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Consolidated Edison of New York, Inc. 0 Xxxxxx Xxxxx Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Notices: NYISO: APPENDIX F ADDRESSES FOR DELIVERY OF NOTICES AND XXXXXXXX Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 0000-X Xxx Xxxx, XX 00000 Attn: General Counsel Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx De Meyere Vice President, Development Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx X. Xxxxxxxxxxx, Senior Vice President and General Counsel Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx Xxxxx, V.P. Engineering and Construction, Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00 XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx De Meyere

Appears in 6 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

AutoNDA by SimpleDocs

Developer Access. The easement to be granted to the Connecting Transmission Owner shall be subject to Developer’s rights to access its Developer’s Attachment Facilities within the Cricket Valley Substation, subject to the Connecting Transmission Owner’s reasonable rules and regulations regarding access to the Cricket Valley Substation, including the Connecting Transmission Owner’s security requirements. APPENDIX D SECURITY ARRANGEMENTS DETAILS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. APPENDIX E COMMERCIAL OPERATION DATE [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Consolidated Edison of New York, Inc. 0 Xxxxxx Xxxxx Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Notices: NYISO: APPENDIX F ADDRESSES FOR DELIVERY OF NOTICES AND XXXXXXXX Notices: NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 0000-X Xxx Xxxx, XX 00000 Attn: General Counsel Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx De Meyere Vice President, Development Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx X. Xxxxxxxxxxx, Senior Vice President and General Counsel Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx Xxxxx, V.P. Engineering and Construction, Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00 XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx De MeyereMeyere Vice President, Development Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxx Xxxxxx, Controller Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00 XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx De Meyere Vice President, Development Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx X. Xxxxxxxxxxx, Senior Vice President and General Counsel Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx Xxxxx, V.P. Engineering and Construction, Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 Notice Concerning Engineering Services Pursuant to Section 5 of Appendix A Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 0X Xxx Xxxx, XX 00000 Attention: Xxxxx Xxxxxxxxxxx Project Engineer, Central Engineering Phone: (000) 000-0000 Email: xxxxxxxxxxxx@xxxxx.xxx Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx Xxx Xxxx, XX 00000 Attention: Xxxxxx Xxxxxx Section Manager, Transmission Planning Phone: (000) 000-0000 Developer: Cricket Valley Energy Center LLC c/o Advanced Power Services (NA) Inc. 00 Xxxx Xx., Xxxxx 0000 Xxxxxx, XX Attention: Xxxxxx De Meyere Phone: 000-000-0000 Email: xxxxxxxx@xxxxxxxxxxxxxxx.xxx With a copy to: Cricket Valley Energy center LLC c/o Advanced Power Services (NA) Inc. 00 Xxxx Xx., Xxxxx 0000 Xxxxxx, XX Attention: Xxxxxx Xxxxxxxxxxx Phone: 000-000-0000 Email: xxxxxxxxxxxx@xxxxxxxxxxxxxxx.xxx Developer Project Manager: Cricket Valley Energy center LLC c/o Advanced Power Services (NA) Inc. 00 Xxxx Xx., Xxxxx 0000 Xxxxxx, XX Attention: Xxxxxx XxXxxxxx Phone: 000-000-0000 Email: xxxxxxxxxx@xxxxxxxxxxxxxxx.xxx APPENDIX G INTERCONNECTION REQUIREMENTS FOR A WIND GENERATING PLANT Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections. Technical Standards Applicable to a Wind Generating Plant Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Appears in 5 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

AutoNDA by SimpleDocs

Developer Access. The easement to be granted to the Connecting Transmission Owner shall be subject to Developer’s rights to access its Developer’s Attachment Facilities within the Cricket Valley Substation, subject to the Connecting Transmission Owner’s reasonable rules and regulations regarding access to the Cricket Valley Substation, including the Connecting Transmission Owner’s security requirements. APPENDIX D SECURITY ARRANGEMENTS DETAILS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. APPENDIX E COMMERCIAL OPERATION DATE [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Consolidated Edison of New York, Inc. 0 Xxxxxx Xxxxx Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Notices: NYISO: APPENDIX F ADDRESSES FOR DELIVERY OF NOTICES AND XXXXXXXX Notices: NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 0000-X Xxx Xxxx, XX 00000 Attn: General Counsel Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx De Meyere Xx Xxxxxx Vice President, Development Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx X. Xxxxxxxxxxx, Senior Vice President and General Counsel Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx Xxxxx, V.P. Engineering and Construction, Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00 XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx De MeyereXx Xxxxxx Vice President, Development Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxx Xxxxxx, Controller Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 00 XX Xxx Xxxx, XX 00000 Attn: Vice President, System and Transmission Operations Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Xx Xxxxxx Vice President, Development Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx X. Xxxxxxxxxxx, Senior Vice President and General Counsel Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 With a copy to: Xxxxxx Xxxxx, V.P. Engineering and Construction, Advanced Power Services (NA) Inc. 00 Xxxx Xxxxxx, Xxxxx 0000 Xxxxxx, XX 00000 Phone: 000-000-0000 Fax: 000-000-0000 Notice Concerning Engineering Services Pursuant to Section 5 of Appendix A Connecting Transmission Owner: Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx, Xxxx 0X Xxx Xxxx, XX 00000 Attention: Xxxxx Xxxxxxxxxxx Project Engineer, Central Engineering Phone: (000) 000-0000 Email: xxxxxxxxxxxx@xxxxx.xxx Consolidated Edison Company of New York, Inc. 0 Xxxxxx Xxxxx Xxx Xxxx, XX 00000 Attention: Xxxxxx Xxxxxx Section Manager, Transmission Planning Phone: (000) 000-0000 Developer: Cricket Valley Energy Center LLC c/o Advanced Power Services (NA) Inc. 00 Xxxx Xx., Xxxxx 0000 Xxxxxx, XX Attention: Xxxxxx Xx Xxxxxx Phone: 000-000-0000 Email: xxxxxxxx@xxxxxxxxxxxxxxx.xxx With a copy to: Cricket Valley Energy center LLC c/o Advanced Power Services (NA) Inc. 00 Xxxx Xx., Xxxxx 0000 Xxxxxx, XX Attention: Xxxxxx Xxxxxxxxxxx Phone: 000-000-0000 Email: xxxxxxxxxxxx@xxxxxxxxxxxxxxx.xxx Developer Project Manager: Cricket Valley Energy center LLC c/o Advanced Power Services (NA) Inc. 00 Xxxx Xx., Xxxxx 0000 Xxxxxx, XX Attention: Xxxxxx XxXxxxxx Phone: 000-000-0000 Email: xxxxxxxxxx@xxxxxxxxxxxxxxx.xxx APPENDIX G INTERCONNECTION REQUIREMENTS FOR A WIND GENERATING PLANT Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections. Technical Standards Applicable to a Wind Generating Plant Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.