Diesel Particulate Filters (DPF’S), Exhaust Gas Recirculation (ERG) Valves, Refrigeration Units and Auxiliary Sample Clauses

Diesel Particulate Filters (DPF’S), Exhaust Gas Recirculation (ERG) Valves, Refrigeration Units and Auxiliary. Power Unit must be serviced according to Original Equipment Manufacturers (OEM) schedules.
AutoNDA by SimpleDocs

Related to Diesel Particulate Filters (DPF’S), Exhaust Gas Recirculation (ERG) Valves, Refrigeration Units and Auxiliary

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Unbundled Loop Concentration (ULC) System 2.5.1 BellSouth will provide to <<customer_name>> Unbundled Loop Concentration (ULC). Loop concentration systems in the central office concentrate the signals transmitted over local loops onto a digital loop carrier system. The concentration device is placed inside a BellSouth central office. BellSouth will offer ULC with a TR008 interface or a TR303 interface.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • AIR TRANSPORT 1. Profits derived by an enterprise of a Contracting State from the operation of aircraft in international traffic shall be taxable only in that State.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.

Time is Money Join Law Insider Premium to draft better contracts faster.