Common use of Draw Requisitions Clause in Contracts

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP Grant the Public Entity shall submit to MnDOT a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOT, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOT, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT unless the Public Entity shall advise MnDOT, in writing, of its intention to so store materials prior to their delivery and MnDOT has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The final Draw Requisition shall not be submitted before completion of the Project, including any correction of material defects in workmanship or materials (other than the completion of punch list items). At the time of submission of the final Draw Requisition the Public Entity shall submit to MnDOT: (I) such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, and

Appears in 4 contracts

Samples: Grant Agreement, Local Road Improvement, Local Road Improvement

AutoNDA by SimpleDocs

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP Grant G.O. Grant, which shall be no more often than once each calendar month, the Public Entity shall submit to MnDOT the State Entity a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition shall be submitted on or between the 1st day and the 15th day of the month in which an Advance is requested, and shall be submitted at least 7 calendar days before the date the Advance is desired. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOTthe State Entity, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOTthe State Entity, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT the State Entity unless the Public Entity shall advise MnDOTthe State Entity, in writing, of its intention to so store materials prior to their delivery and MnDOT the State Entity has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT the State Entity such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The At the time of submission of the final Draw Requisition which shall not be submitted before completion of the Project, including any all landscape requirements and off-site utilities and streets needed for access to the Real Property and, if applicable, Facility and correction of material defects in workmanship or materials (other than the completion of punch list items). At ) as provided in the time of submission of the final Draw Requisition Construction Contract Documents, the Public Entity shall submit to MnDOTthe State Entity: (Ii) such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities, and that all requisite certificates of occupancy and other approvals have been issued. If on the date an Advance is desired the Public Entity has complied with all requirements of this Agreement and the State Entity approves the relevant Draw Requisition and receives a current construction report from the Inspecting Engineer recommending payment, then the State Entity shall disburse the amount of the requested Advance to the Public Entity.

Appears in 4 contracts

Samples: mccmeetingspublic.blob.core.usgovcloudapi.net, Agreement, Grant Agreement

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP Grant Program Grant, which shall be no more often than once each calendar month, the Public Entity shall submit to MnDOT the State Entity a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition shall be submitted on or between the 1st day and the 15th day of the month in which an Advance is requested, and shall be submitted at least 7 calendar days before the date the Advance is desired. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOTthe State Entity, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOTthe State Entity, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT the State Entity unless the Public Entity shall advise MnDOTthe State Entity, in writing, of its intention to so store materials prior to their delivery and MnDOT the State Entity has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT the State Entity such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The At the time of submission of the final Draw Requisition which shall not be submitted before completion of the Project, including any all landscape requirements and off-site utilities and streets needed for access to the Real Property and, if applicable, Facility and correction of material defects in workmanship or materials (other than the completion of punch list items). At ) as provided in the time of submission of the final Draw Requisition Construction Contract Documents, the Public Entity shall submit to MnDOTthe State Entity: (Ii) such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities, and that all requisite certificates of occupancy and other approvals have been issued. If on the date an Advance is desired the Public Entity has complied with all requirements of this Agreement and the State Entity approves the relevant Draw Requisition and receives a current construction report from the Inspecting Engineer recommending payment, then the State Entity shall disburse the amount of the requested Advance to the Public Entity.

Appears in 3 contracts

Samples: Grant Agreement, mn.gov, mn.gov

Draw Requisitions. Whenever the Public Entity Grant Recipient desires a disbursement of a portion of the LRIP Grant, which shall be no more often than once each calendar month, the Grant the Public Entity Recipient shall submit to MnDOT the State Entity a Draw Requisition duly executed on behalf of the Public Entity Grant Recipient or its designee. Each Draw Requisition shall be submitted on or between the 1st day and the 15th day of the month in which an Advance is requested, and shall be submitted at least 7 calendar days before the date the Advance is desired. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity Grant Recipient and MnDOTthe State Entity, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property Project site in a manner acceptable to MnDOTthe State Entity, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property Project site will be made by MnDOT the State Entity unless the Public Entity Grant Recipient shall advise MnDOTthe State Entity, in writing, of its intention to so store materials prior to their delivery and MnDOT the State Entity has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity Grant Recipient shall submit to MnDOT the State Entity such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The At the time of submission of the final Draw Requisition which shall not be submitted before substantial completion of the Project, including any all landscape requirements and off-site utilities and streets needed for access to the Project and correction of material defects in workmanship or materials (other than the completion of punch list items). At ) as provided in the time of submission of Construction Contract Documents, the final Draw Requisition the Public Entity Grant Recipient shall submit to MnDOTthe State Entity: (Ii) such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities, and that all requisite certificates of occupancy and other approvals have been issued. If on the date an Advance is desired the Grant Recipient has complied with all requirements of this Agreement and the State Entity approves the relevant Draw Requisition and receives a current construction report from the Inspecting Engineer recommending payment, then the State Entity shall disburse the amount of the requested Advance to the Grant Recipient.

Appears in 3 contracts

Samples: Grant Agreement, Grant Agreement, Grant Agreement

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP LBRP Grant the Public Entity shall submit to MnDOT a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOT, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOT, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT unless the Public Entity shall advise MnDOT, in writing, of its intention to so store materials prior to their delivery and MnDOT has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The final Draw Requisition shall not be submitted before completion of the Project, including any correction of material defects in workmanship or materials (other than the completion of punch list items). At the time of submission of the final Draw Requisition the Public Entity shall submit to MnDOT: (I) such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, and

Appears in 2 contracts

Samples: Grant Agreement, Grant Agreement

Draw Requisitions. Whenever the Public Entity Grantee desires a disbursement of a portion of the LRIP Grant Council Grant, which shall be no more often than once each calendar month, the Public Entity Grantee shall submit to MnDOT the Council a Draw Requisition duly executed on behalf of the Public Entity Grantee or its designee. Each Draw Requisition shall be submitted on or between the 1st day and the 15th day of the month in which an Advance is requested, and shall be submitted at least 7 calendar days before the date the Advance is desired. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity Grantee and MnDOTthe Council, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOTthe Council, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT the Council unless the Public Entity Grantee shall advise MnDOTthe Council, in writing, of its intention to so store materials prior to their delivery and MnDOT the Council has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity Grantee shall submit to MnDOT the Council such supporting evidence as may be requested by MnDOT the Council to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The At the time of submission of the final Draw Requisition which shall not be submitted before completion of the Project, including any all landscape requirements and off-site utilities and streets needed for access to the Real Property and, if applicable, Facility and correction of material defects in workmanship or materials (other than the completion of punch list items). At ) as provided in the time of submission of Construction Contract Documents, the final Draw Requisition the Public Entity Grantee shall submit to MnDOTthe Council: (Ii) such supporting evidence as may be requested by MnDOT the Council to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities, and that all requisite certificates of occupancy and other approvals have been issued. If on the date an Advance is desired the Grantee has complied with all requirements of this Agreement and the Council approves the relevant Draw Requisition and receives a current construction report from the Inspecting Engineer recommending payment, then the Council shall disburse the amount of the requested Advance to the Grantee.

Appears in 1 contract

Samples: www.wspmn.gov

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP LBRP Grant the Public Entity shall submit to MnDOT a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOT, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOT, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT unless the Public Entity shall advise MnDOT, in writing, of its intention to so store materials prior to their delivery and MnDOT has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The final Draw Requisition shall not be submitted before completion of the Project, including any correction of material defects in workmanship or materials (other than the completion of punch list items). At the time of submission of the final Draw Requisition the Public Entity shall submit to MnDOT: (Ii) such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities and that all requisite certificates and other approvals have been issued. If on the date an Advance is desired the Public Entity has complied with all requirements of this Agreement and MnDOT approves the relevant Draw Requisition, then MnDOT shall disburse the amount of the requested Advance to the Public Entity.

Appears in 1 contract

Samples: Grant Agreement

AutoNDA by SimpleDocs

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP Grant Program Grant, which shall be no more often than twice each calendar month, the Public Entity shall submit to MnDOT the State Entity a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition must be submitted at least 7 calendar days before the date the Disbursement is desired. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOTthe State Entity, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOTthe State Entity, less (iii) any applicable retainage, and less (iv) all prior AdvancesDisbursements. Notwithstanding anything herein to the contrary, no Advances Disbursements for materials stored on or off the Real Property will be made by MnDOT the State Entity unless the Public Entity shall advise MnDOTthe State Entity, in writing, of its intention to so store materials prior to their delivery and MnDOT the State Entity has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT the State Entity such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The At the time of submission of the final Draw Requisition which shall not be submitted before completion of the Project, including any all landscape requirements and off-site utilities and streets needed for access to the Real Property and, if applicable, Facility and correction of material defects in workmanship or materials (other than the completion of punch list items). At ) as provided in the time of submission of the final Draw Requisition Construction Contract Documents, the Public Entity shall submit to MnDOTthe State Entity: (Ii) such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities, and that all requisite certificates of occupancy and other approvals have been issued. The State Entity will withhold ten percent of grant funds until reporting requirements outlined in 7.04 and 7.31 are met. If on the date a Disbursement is desired the Public Entity has complied with all requirements of this Agreement and the State Entity approves the relevant Draw Requisition and receives a current construction report from the Inspecting Engineer recommending payment, then the State Entity shall disburse the amount of the requested Disbursement to the Public Entity.

Appears in 1 contract

Samples: braham.com

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP Grant G.O. Grant, which shall be no more often than once each calendar month, the Public Entity shall submit to MnDOT the State Entity a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition shall be submitted on the 15th day of the month in which an Advance is requested. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOTthe State Entity, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOTthe State Entity, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT the State Entity unless the Public Entity shall advise MnDOTthe State Entity, in writing, of its intention to so store materials prior to their delivery and MnDOT the State Entity has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT the State Entity such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The At the time of submission of the final Draw Requisition which shall not be submitted before completion of the Project, including any all landscape requirements and off-site utilities and streets needed for access to the Real Property and, if applicable, Facility and correction of material defects in workmanship or materials (other than the completion of punch list items). At ) as provided in the time of submission of the final Draw Requisition Construction Contract Documents, the Public Entity shall submit to MnDOTthe State Entity: (Ii) such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities, and that all requisite certificates of occupancy and other approvals have been issued. If on the date an Advance is desired the Public Entity has complied with all requirements of this Agreement and the State Entity approves the relevant Draw Requisition and receives a current construction report from the Inspecting Engineer recommending payment, then the State Entity shall disburse the amount of the requested Advance to the Public Entity.

Appears in 1 contract

Samples: Grant Agreement

Draw Requisitions. Whenever the Public Entity Grant Recipient desires a disbursement of a portion of the LRIP Grant, which shall be no more often than once each calendar month, the Grant the Public Entity Recipient shall submit to MnDOT the State Entity a Draw Requisition duly executed on behalf of the Public Entity Grant Recipient or its designee. Each Draw Requisition shall be submitted on or between the 1st day and the 15th day of the month in which an Advance is requested, and shall be submitted at least 7 calendar days before the date the Advance is desired. Each Draw Requisition with respect to construction items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity Grant Recipient and MnDOTthe State Entity, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property Project site in a manner acceptable to MnDOTthe State Entity, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property Project site will be made by MnDOT the State Entity unless the Public Entity Grant Recipient shall advise MnDOTthe State Entity, in writing, of its intention to so store materials prior to their delivery and MnDOT the State Entity has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity Grant Recipient shall submit to MnDOT the State Entity such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The At the time of submission of the final Draw Requisition which shall not be submitted before substantial completion of the Project, including any all landscape requirements and off-site utilities and streets needed for access to the Project and correction of material defects in workmanship or materials (other than the completion of punch list items). At ) as provided in the time of submission of Construction Contract Documents, the final Draw Requisition the Public Entity Grant Recipient shall submit to MnDOTthe State Entity: (Ii) such supporting evidence as may be requested by MnDOT the State Entity to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, and

Appears in 1 contract

Samples: General Fund

Draw Requisitions. Whenever the Public Entity desires a disbursement of a portion of the LRIP LBRP Grant the Public Entity shall submit to MnDOT a Draw Requisition duly executed on behalf of the Public Entity or its designee. Each Draw Requisition with respect to construction and construction administration engineering items shall be limited to amounts equal to: (i) the total value of the classes of the work by percentage of completion as approved by the Public Entity and MnDOT, plus (ii) the value of materials and equipment not incorporated in the Project but delivered and suitably stored on or off the Real Property in a manner acceptable to MnDOT, less (iii) any applicable retainage, and less (iv) all prior Advances. Notwithstanding anything herein to the contrary, no Advances for materials stored on or off the Real Property will be made by MnDOT unless the Public Entity shall advise MnDOT, in writing, of its intention to so store materials prior to their delivery and MnDOT has not objected thereto. At the time of submission of each Draw Requisition, other than the final Draw Requisition, the Public Entity shall submit to MnDOT such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the relevant Draw Requisition or to substantiate all payments then made with respect to the Project. The final Draw Requisition shall not be submitted before completion of the Project, including any correction of material defects in workmanship or materials (other than the completion of punch list items). At the time of submission of the final Draw Requisition the Public Entity shall submit to MnDOT: (Ii) such supporting evidence as may be requested by MnDOT to substantiate all payments which are to be made out of the final Draw Requisition or to substantiate all payments then made with respect to the Project, andand (ii) satisfactory evidence that all work requiring inspection by municipal or other governmental authorities having jurisdiction has been duly inspected and approved by such authorities and that all requisite certificates and other approvals have been issued. If on the date an Advance is desired the Public Entity has complied with all requirements of this Agreement and MnDOT approves the relevant Draw Requisition, then MnDOT shall disburse the amount of the requested Advance to the Public Entity.

Appears in 1 contract

Samples: General Fund Grant Agreement