Drawings and Documents Sample Clauses

Drawings and Documents. Subject to Article 3, drawings and documents or copies thereof required for the Project shall be exchanged between the parties on a reciprocal basis. Documents prepared by the Engineer for the Client may be used by the Client, for the Project herein described, including "record” drawings. Subject to Article 1.5, the Client has ownership of the drawings and the client indemnifies the Engineer for unauthorized use of the documents and deliverables.
AutoNDA by SimpleDocs
Drawings and Documents. The Seller shall provide to the Buyer:
Drawings and Documents. Contractor shall make reasonable efforts to secure electronically formatted drawings and documents from all Subcontractors. When electronic formatting as noted in Sections 1.5.3 and 1.5.4, is not obtainable due to Subcontractor policies or procedures then Contractor shall have such materials scanned and submitted in portable document format (*.pdf).
Drawings and Documents. Consultant shall carry out the review work indicated in Section 4 of RFP document (page 8 to 12) based on the drawings provided by the Employer.
Drawings and Documents. Drawings and documents or copies thereof required for the Project shall be exchanged between the parties on a reciprocal basis. Documents prepared by the Consultant for the Town may be used by the Town for the Project herein described, including "as-built" drawings and the Town has ownership of any such drawings and documents. To the extent called for, the Consultant shall cooperate, assist, and collaborate with any other Consultant or third party to incorporate these drawings and documents into any larger or comparable document package applicable to the overall Project.
Drawings and Documents. 4.1 The Independent Engineer shall undertake a detailed review of the Drawings to be furnished by the Developer. The Independent Engineer shall complete such review and send its comments/observations and the Developer within 15 (fifteen) days of receipt of such Drawings. In particular, such comments shall specify the conformity or otherwise of such Drawings with the Scope of the Project and Specifications and Standards.
Drawings and Documents. Following drawings and documents shall be prepared based on TPNODL specifications and statutory requirements and shall be submitted with the bid: o Completely filled in Technical Particulars and compliance to each clause of the specification General Technical Requirements to Additional Details. o Description of the equipment and all components including brochures. o General Drawing arrangement of AB Switch. o Bill of material. o Experience Certificate and list. o Type test certificates. o List of makes of major components. o Current density calculation of tinned braided Copper. Drawings / documents to be submitted after the award of the contract are as under: List of Drawings/Parameters to be submitted: Initiator HOG (Engineering) TP NORTHERN ODISHA DISTRIBUTION LIMITED TECHNICAL SPECIFICATIONS Doc. Title SPECFICATION FOR 33kV (200A/400A/630A) Air Break Switches Doc. No ENG-LV-001 Eff. Date: 13.09.2021 Rev No. 00 Page 14 of 17 Prepared by: Engineering Department Reviewed by: Approved by: Issued by: o Technical Parameters as asked in Specification (General Technical Particulars, General Technical Requirements, Additional Details, Fittings, Type test Reports and Routine test certificates of bought out accessories). o General Arrangement Drawing of the AB Switch (Front view, Top view and both sides view. Complete list of fittings to be displayed and quantities to be mentioned with the drawing). o Terminal and connection drawings o Manual catalogue o Instructions for use o Transport/shipping dimension drawing o Type Test Certificates. o Installation/ Mounting Instructions/Drawing. o Quality Assurance plan.
AutoNDA by SimpleDocs
Drawings and Documents. The design and drawings, specifications, bills of quantities, calculations and similar documents and models (the “Material”) for the Works (in so far as they have been produced by the Contractor) may be used and copied free of charge for any purposes related to the Works including, but without limitation, the construction, completion, maintenance, modification, sale letting, promotion, advertisement, re-instatement, refurbishment, repair and extension of the Works and the Contractor grants the Beneficiary a non-exclusive, perpetual, irrevocable, royalty-free licence of the Material for this purpose and the right to grant sub-licences of the Material.
Drawings and Documents. Architect/Consultant shall carry out the review work indicated in Section 4 of RFP document (Pages 10 to 15) based on the drawings provided by the Employer.
Drawings and Documents. The SUPPLIER shall only be entitled to use SUNTEC INDUSTRIE FRANCE's drawings and documents for the fulfilment of the Order and shall not be empowered to disclose such information to third parties without the prior written consent of SUNTEC INDUSTRIES FRANCE.
Time is Money Join Law Insider Premium to draft better contracts faster.