ELECTRICAL & MECHANICAL Sample Clauses

ELECTRICAL & MECHANICAL. 13. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 14. All electrical installation shall be carried by authorised licensed contractor and client shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 15. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 16. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 17. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 18. No aluminum cable to be used. Only copper cables of ISI make to be used. 19. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 20. Only CFL & tubes with electronic chokes or LED to be used. No Aluminum / Copper chokes to be used. 21. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 22. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 23. Balancing of load should be proper in all 3 phases. 24. Coffee ma...
AutoNDA by SimpleDocs
ELECTRICAL & MECHANICAL engineering works
ELECTRICAL & MECHANICAL. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE.

Related to ELECTRICAL & MECHANICAL

  • Mechanical (i) Large scale mechanical details complete. (ii) Mechanical schedules for equipment completed. (iii) Completed electrical schematic for environmental cooling and exhaust equipment. (iv) Complete energy conservation calculations and report.

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!