Common use of ELECTRICAL & MECHANICAL Clause in Contracts

ELECTRICAL & MECHANICAL. 13. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 14. All electrical installation shall be carried by authorised licensed contractor and client shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 15. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 16. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 17. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 18. No aluminum cable to be used. Only copper cables of ISI make to be used. 19. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 20. Only CFL & tubes with electronic chokes or LED to be used. No Aluminum / Copper chokes to be used. 21. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 22. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 23. Balancing of load should be proper in all 3 phases. 24. Coffee machine / water cooler/ oven and any other Electrical appliances should be properly earthed and to be used with a proper rating of cable through ELCB. 25. For power output 15 amp plug; for lighting 5 amp plug and for AC industrial sockets to be used. 26. Small step down transformer on false ceiling for lighting to be properly secured. 27. No PVC pipes to be used for Electrical wiring, only XX xxxxx to be used. 28. Electrical panel wiring to be properly dressed and the gap between the phases to be proper. 29. CT provided in the electrical panel should be of proper size and should have a proper gap between the space and CT to be checked for any heating/ cracking. 30. One circuit should not have more than eight light point or two power points. 31. For neon signages, transformer should be placed outside safe place or LED signages to be used. 32. THE LESSEE to ensure that the electro-mechanical systems installed in the Said Premises is properly maintained during their interior works and at the time of operations. THE LESSEE to also ensure that no fire spreads from the premises. 33. THE LESSEE to have the audit of their entire Electrical systems done on a quarterly basis by a reputed Electrical consultant and provide a certificate certifying that all THE LESSEE’s installations including insulation resistance are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly basis. 34. THE LESSEE to have the audit of their entire HVAC systems done on a quarterly basis by a reputed HVAC consultant and provide a certificate certifying that all THE LESSEE’s installations are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly basis.

Appears in 2 contracts

Samples: Lease Deed (Virtusa Corp), Lease Deed (Virtusa Corp)

AutoNDA by SimpleDocs

ELECTRICAL & MECHANICAL. 1314. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith along with sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 1415. All electrical installation shall be carried by authorised authorized licensed contractor and client THE LESSEE shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 1516. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 1617. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 1718. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 1819. No aluminum cable to be used. Only copper cables of ISI make to be used. 1920. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 2021. Only CFL & tubes with electronic chokes or LED to be used. No Aluminum / Copper chokes to be used. 2122. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 2223. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 2324. Balancing of load should be proper in all 3 phases. 2425. Coffee machine / water cooler/ oven and any other Electrical appliances should be properly earthed and to be used with a proper rating of cable through ELCB. 2526. For power output 15 amp plug; for lighting 5 amp plug and for AC industrial sockets to be used. 2627. Small step down transformer on false ceiling for lighting to be properly secured. 2728. No PVC pipes to be used for Electrical wiring, only XX xxxxx to be used. 2829. Electrical panel wiring to be properly dressed and the gap between the phases to be proper. 2930. CT provided in the electrical panel should be of proper size and should have a proper gap between the space and CT to be checked for any heating/ cracking. 3031. One circuit should not have more than eight light point or two power points. 3132. For neon signages, transformer should be placed outside safe place or LED signages to be used. 3233. THE LESSEE to ensure that the electro-mechanical systems installed in the Said Demised Premises is properly maintained during their interior works and at the time of operations. THE LESSEE to also ensure that no fire spreads from the premisesDemised Premises. 3334. THE LESSEE to have the audit of their entire Electrical systems done on a quarterly half-yearly basis by a reputed Electrical consultant and provide a certificate certifying that all THE LESSEE’s installations including insulation resistance are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis. 3435. THE LESSEE to have the audit of their entire HVAC systems done on a quarterly half-yearly basis by a reputed HVAC consultant and provide a certificate certifying that all THE LESSEE’s installations are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis.

Appears in 2 contracts

Samples: Lease Deed (WNS (Holdings) LTD), Lease Deed (WNS (Holdings) LTD)

ELECTRICAL & MECHANICAL. 13. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 14. All electrical installation shall be carried by authorised licensed contractor and client THE LESSEE shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 15. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 16. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 17. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 18. No aluminum cable to be used. Only copper cables of ISI make to be used. Up to 16 sq mm, copper cable of ISI make to be used. Rest above shall be Aluminum Cable. 19. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 20. Only CFL & tubes with electronic chokes or LED to be used. No Aluminum / Copper chokes to be used. 21. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 22. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 23. Balancing of load should be proper in all 3 phases. 24. Coffee machine / water cooler/ oven and any other Electrical appliances should be properly earthed and to be used with a proper propter rating of cable through ELCB. 25. For power output 15 amp plug; for lighting 5 amp plug and for AC industrial sockets to be used. 26. Small step down transformer on false ceiling for lighting to be properly secured. 27. No PVC pipes to be used for Electrical wiring, only XX xxxxx to be used. 28. Electrical panel wiring to be properly dressed and the gap between the phases to be proper. 29. CT provided in the electrical panel should be of proper size and should have a proper gap between the space and CT to be checked for any heating/ cracking. 30. One circuit should not have more than eight light point or two power points. 31. For neon signages, signages transformer should be placed outside safe place or LED signages to be used. 32. THE LESSEE to ensure that the electro-mechanical systems installed in the Said Premises is properly maintained during their interior works and at the time of operations. THE LESSEE to also ensure that no fire spreads from the premises. 33. THE LESSEE to have the audit of their entire Electrical systems done on a quarterly bi-annual basis by a reputed Electrical consultant and provide a certificate certifying that all THE LESSEE’s installations including insulation resistance are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly bi-annual basis. 34. THE LESSEE to have the audit of their entire HVAC systems done on a quarterly bi-annual basis by a reputed HVAC consultant and provide a certificate certifying that all THE LESSEE’s installations are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly bi-annual basis.

Appears in 1 contract

Samples: Lease Deed (Cvent Inc)

ELECTRICAL & MECHANICAL. 1314. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 1415. All electrical installation shall be carried by authorised authorized licensed contractor and client shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 1516. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 1617. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 1718. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 1819. No aluminum cable to be used. Only copper cables of ISI make to be used. 1920. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 2021. Only CFL & tubes with electronic chokes or LED to be used. No Aluminum / Copper chokes to be used. 2122. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 2223. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 2324. Balancing of load should be proper in all 3 phases. 2425. Coffee machine / water cooler/ oven and any other Electrical appliances should be properly earthed and to be used with a proper rating of cable through ELCB. 2526. For power output 15 amp plug; for lighting 5 amp plug and for AC industrial sockets to be used. 2627. Small step down transformer on false ceiling for lighting to be properly secured. 2728. No PVC pipes to be used for Electrical wiring, only XX xxxxx to be used. 2829. Electrical panel wiring to be properly dressed and the gap between the phases to be proper. 2930. CT provided in the electrical panel should be of proper size and should have a proper gap between the space and CT to be checked for any heating/ cracking. 3031. One circuit should not have more than eight light point or two power points. 3132. For neon signages, transformer should be placed outside safe place or LED signages to be used. 3233. THE LESSEE to ensure that the electro-mechanical systems installed in the Said Demised Premises is properly maintained during their interior works and at the time of operations. THE LESSEE to also ensure that no fire spreads from the premisesDemised Premises. 3334. THE LESSEE to have the audit of their entire Electrical systems done on a quarterly half-yearly basis by a reputed Electrical consultant and provide a certificate certifying that all THE LESSEE’s installations including insulation resistance are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis. 3435. THE LESSEE to have the audit of their entire HVAC systems done on a quarterly half-yearly basis by a reputed HVAC consultant and provide a certificate certifying that all THE LESSEE’s installations are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis.

Appears in 1 contract

Samples: Lease Deed (Virtusa Corp)

ELECTRICAL & MECHANICAL. 1314. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 1415. All electrical installation shall be carried by authorised authorized licensed contractor and client shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 1516. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In , in case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 1617. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 1718. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 1819. No aluminum cable to be used. Only copper cables of ISI make to be used. 1920. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 2021. Only CFL & tubes with electronic chokes or LED to be used. No Aluminum / Copper chokes to be used. 2122. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 2223. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 2324. Balancing of load should be proper in all 3 phases. 2425. Coffee machine / water cooler/ oven and any other Electrical appliances should be properly earthed and to be used with a proper rating of cable through ELCB. 2526. For power output 15 amp plug; for lighting 5 amp plug and for AC industrial sockets to be used. 2627. Small step down transformer on false ceiling for lighting to be properly secured. 2728. No PVC pipes to be used for Electrical wiring, only XX xxxxx to be used. 2829. Electrical panel wiring to be properly dressed and the gap between the phases to be proper. 2930. CT provided in the electrical panel should be of proper size and should have a proper gap between the space and CT to be checked for any heating/ cracking. 3031. One circuit should not have more than eight light point or two power points. 3132. For neon signages, transformer should be placed outside safe place or LED signages to be used. 3233. THE LESSEE to ensure that the electro-mechanical systems installed in the Said Demised Premises is properly maintained during their interior works and at the time of operations. THE LESSEE to also ensure that no fire spreads from the premisesDemised Premises. 3334. THE LESSEE to have the audit of their entire Electrical systems done on a quarterly half-yearly basis by a reputed Electrical consultant and provide a certificate certifying that all THE LESSEE’s ’S installations including insulation resistance are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis. 3435. THE LESSEE to have the audit of their entire HVAC systems done on a quarterly half-yearly basis by a reputed HVAC consultant and provide a certificate certifying that all THE LESSEE’s ’S installations are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis.

Appears in 1 contract

Samples: Lease Deed (Cvent Inc)

AutoNDA by SimpleDocs

ELECTRICAL & MECHANICAL. 1314. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 1415. All electrical installation shall be carried by authorised authorized licensed contractor and client shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 1516. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 1617. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 1718. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 1819. No aluminum cable to be used. Only copper cables of ISI make to be used. 1920. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 2021. Only CFL & tubes with electronic chokes or LED to be used. No Aluminum / Copper chokes to be used. 2122. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 2223. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 2324. Balancing of load should be proper in all 3 phases. 2425. Coffee machine / water cooler/ oven and any other Electrical appliances should be properly earthed and to be used with a proper rating of cable through ELCB. 2526. For power output 15 amp plug; for lighting 5 amp plug and for AC industrial sockets to be used. 2627. Small step down transformer on false ceiling for lighting to be properly secured. 2728. No PVC pipes to be used for Electrical wiring, only XX xxxxx to be used. 2829. Electrical panel wiring to be properly dressed and the gap between the phases to be proper. 2930. CT provided in the electrical panel should be of proper size and should have a proper gap between the space and CT to be checked for any heating/ cracking. 3031. One circuit should not have more than eight light point or two power points. 3132. For neon signages, transformer should be placed outside safe place or LED signages to be used. 3233. THE LESSEE to ensure that the electro-mechanical systems installed in the Said Demised Premises is properly maintained during their interior works and at the time of operations. THE LESSEE to also ensure that no fire spreads from the premisesDemised Premises. 3334. THE LESSEE to have the audit of their entire Electrical systems done on a quarterly half-yearly basis by a reputed Electrical consultant and provide a certificate certifying that all THE LESSEE’s ’S installations including insulation resistance are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis. 3435. THE LESSEE to have the audit of their entire HVAC systems done on a quarterly half-yearly basis by a reputed HVAC consultant and provide a certificate certifying that all THE LESSEE’s ’S installations are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half-yearly basis.

Appears in 1 contract

Samples: Lease Deed (Cvent Inc)

ELECTRICAL & MECHANICAL. 13. For the operational usage THE LESSOR has provided the electrical tap-off in electrical room alongwith sub-meters installed for supply of power from grid/supplying agency and back-up power. THE LESSEE to tap-off electricity through proper distribution panel / board properly earthed. The distribution of electricity inside the premises during the interior works shall be responsibility of THE LESSEE. 14. All electrical installation shall be carried by authorised licensed contractor and client shall submit installation test certificate issued by same contractor and certificate of verification of these installation by a reputed electrical consultant. 15. During interior works Electrical supply for fitout to be given through portable DG/Building DG (if installed). In case power for fitouts is provided through temporary portable DG installed outside, THE LESSEE will have to take the tapping though a cable of suitable rating from outside the building. Lessee to take the electricity in a proper panel/fitted with MCB & ELCB with proper earthing. Cable of proper rating to be used as per load. No loose connection & joints in wires will be allowed. During interior works while using drilling/hammering machine or any other electrical equipment, THE LESSEE shall ensure that proper 3 pin plugs are used. No over loading of socket will be allowed. 16. All outgoing feeders single phase & 3 phase in Panels & DBs outlets shall be suitable of individual equipment rating and out going feeders must have a protection arrangement so that it should trip in the event of overload, short circuit & earth fault. 17. All material to be used should be of IS Standard & from reputed manufacturer. No sub standard material to be used. 18. No aluminum cable to be used. Only copper cables of ISI make to be used. 19. Under no circumstances during interiors / operations should the safety system in the circuit / MCB / ELCB be bypassed. THE LESSOR to ensure that this is adhered to under all circumstances. 20. Only CFL & tubes with electronic electronics chokes or LED to be used. No Aluminum / Copper chokes to be used. 21. Compressors of Split AC/ Precision AC shall be serviced regularly to avoid overheating / jamming of compressor / fan motor. Stabilizer sockets to be checked regularly for heating. 22. Supply from one socket to be used for one source only and 3 wire cable to be used rather than 3 different cables. No overloading of sockets. 23. Balancing of load should be proper in all 3 phases. 24. Coffee machine / water cooler/ oven and any other Electrical appliances should be properly earthed and to be used with a proper rating of cable through ELCB. 25. For power output 15 amp plug; for lighting 5 amp plug and for AC industrial sockets to be used. 26. Small step down transformer on false ceiling for lighting to be properly secured. 27. No PVC pipes to be used for Electrical wiring, only XX xxxxx to be used. 28. Electrical panel wiring to be properly dressed and the gap between the phases to be proper. 29. CT provided in the electrical panel should be of proper size and should have a proper gap between the space and CT to be checked for any heating/ cracking. 30. One circuit should not have more than eight light point or two power points. 31. For neon signages, signages transformer should be placed outside safe place or LED signages to be used. 32. THE LESSEE to ensure that the electro-mechanical systems installed in the Said Premises is properly maintained during their interior works and at the time of operations. THE LESSEE to also ensure that no fire spreads from the premises. 33. THE LESSEE to have the audit of their entire Electrical systems done on a quarterly half yearly basis by a reputed Electrical consultant and provide a certificate certifying that all THE LESSEE’s installations including insulation resistance are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half yearly basis. 34. THE LESSEE to have the audit of their entire HVAC systems done on a quarterly half yearly basis by a reputed HVAC consultant and provide a certificate certifying that all THE LESSEE’s installations are in good and safe working condition and does not have any possibility of short circuit and becoming a fire source. To be submitted to the facility manager on quarterly half yearly basis.

Appears in 1 contract

Samples: Lease Deed (WNS (Holdings) LTD)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!