END ITEM DELIVERY Sample Clauses

The END ITEM DELIVERY clause sets out the requirements and obligations for delivering the final product or completed goods under a contract. It typically specifies the delivery location, deadlines, and any conditions that must be met for the delivery to be considered complete, such as inspection or acceptance procedures. This clause ensures that both parties are clear on when and how the end item must be provided, helping to prevent disputes over delivery timing or quality and ensuring that contractual expectations are met.
POPULAR SAMPLE Copied 1 times
END ITEM DELIVERY. Upon delivery of an equipment, a subsystem or a spacecraft, the Contractor shall supply an End Item Data Pack (EIDP). As a minimum, the EIDP for each item shall contain: • the Certificate of Conformance for the item, signed by the Contractor’s Quality Assurance representative; • test reports and copies of as-run procedures; • the Configured Item Status List, identifying the “as-built” standard of the delivered item; • a reconciliation between the “as-built” and “as-designed” standard of the delivered item; • at equipment level, circuit schematics as defined in Section 8.2 of this Statement of Work, interconnection diagrams and the “as-built” parts list identifying all parts used in the equipment, together with the Top Assembly and the Interface Control Drawings; and • a summary of ‘open items’, plus copies of all Non-Conformance reports, Failure reports, Test Discrepancy reports, Requests for Waiver or Deviation and a copy of the appropriate Log Books.