Engineering Analyses and Reporting. The field and laboratory data will be summarized in an engineering report. Analyses of these data will be presented, and recommendations made in accordance with the Fort Bend County Engineering Guidelines. The following geotechnical information and recommendations will be provided: The field and laboratory data will be presented in a geotechnical report. Geotechnical analyses will be conducted using the field and laboratory test data to provide geotechnical data for the design and construction of the proposed improvements, including (but not limited to) the following: Generalized soils stratigraphy Piezometer installation and groundwater measurements Preliminary fault review based on the review of the available fault maps Excavation and trench construction and safety requirements Recommendations regarding bedding and backfill for utilities construction Loads on buried pipes including dead and live loads (vehicle loads) Recommendations regarding paving including thickness and reinforcement design, subgrade preparation and stabilization, pavement construction Storm sewer installations Construction consideration One (1) electronic PDF copy of the draft geotechnical report will be submitted. Once we have received the review comments, a final report addressing the review comments will be issued. One (1) copies of final report and an electronic copy (PDF) of the final report will also be issued.
Appears in 2 contracts
Samples: Professional Services, Professional Services
Engineering Analyses and Reporting. The field and laboratory data will be summarized in an engineering report. Analyses of these data will be presented, and recommendations made in accordance with the Fort Bend County Engineering Guidelines. The following geotechnical information and recommendations will be provided: The field and laboratory data will be presented in a geotechnical report. Geotechnical analyses will be conducted using the field and laboratory test data to provide geotechnical data for the design and construction of the proposed improvements, including (but not limited to) the following: • Generalized soils stratigraphy • Piezometer installation and groundwater measurements • Preliminary fault review based on the review of the available fault maps • Excavation and trench construction and safety requirements • Recommendations regarding bedding and backfill for utilities construction • Loads on buried pipes including dead and live loads (vehicle loads) • Recommendations regarding paving including thickness and reinforcement design, subgrade preparation and stabilization, pavement construction • Storm sewer installations • Construction consideration • Detention Pond – Slope stability analyses for short term, rapid drawdown and long-term conditions • Soil dispersiveness One (1) electronic PDF copy of the draft geotechnical report will be submitted. Once we have ATL has received the review comments, a final report addressing the review comments will be issued. One (1) copies of final report and an electronic copy (PDF) of the final report will also be issued.. We will perform the following Hydraulic and Hydrologic support services during the preliminary design phase. The scope of services includes the following tasks:
Appears in 2 contracts
Samples: Professional Services, Professional Services