Engineering and Project Delivery Sample Clauses
Engineering and Project Delivery. Your project will be delivered using our GeoReport system. Upon initiation, we will provide you and your design team the necessary link and password to access the website. Each project includes a calendar to track the schedule, an interactive site map, a listing of team members, access to all project documents as they are uploaded to the site, and a collaboration portal. A typical delivery process includes three basic stages: ■ Project Planning – Proposal information, schedule and exploration plan will be posted ■ Site Characterization – Findings of the site exploration ■ Geotechnical Engineering – Recommendations and geotechnical engineering report When services are complete, we will upload a printable version of our complete final geotechnical engineering report. You will be sent a draft of the report for review. The final report will address comments and will be sent to you directly and uploaded to the web site. Previous submittals, collaboration, and final report will be maintained in our system. This allows future reference and integration into subsequent aspects of our services, as the project goes through final design and construction. The final geotechnical engineering report provides the following: ■ Boring logs with field, laboratory data and groundwater observations ■ Site and boring location plans ■ Subsurface exploration procedures ■ Description of subsurface conditions ■ Recommendations for concrete pavement sections for the West and East Parking Lots ■ Recommendations for asphalt pavement sections for the Southern and Overflow Parking Lots ■ Subgrade preparation/earthwork recommendations Based upon our understanding of the site, the project as summarized in Exhibit A, and our planned Scope of Services outlined in Exhibit B, our unit fee is shown in the following table: Mobilization (Truck-mounted Drilling Rig) 1 400.00 each 400.00 Soil Sampling 80 16.00 foot 1,280.00 Site Cleanup and Disposal 8 115.00 boring 920.00 Parking Lot and Building Repair – Texas DPS Garland ■ Garland, Texas December 9, 2020 ■ Terracon Proposal No. P94205359 Rev.1 Utility Ticket 1 145.00 hour 145.00 Drilling/Field Services Coordinator 6 110.00 Hour 660.00 Private Utility Locate 1 1,000.00 each 1,000.00 Atterberg Limits 8 70.00 each 560.00 Moisture Content 40 7.00 each 280.00 Percent Passing No. 200 Sieve 2 30.00 each 60.00 Unconfined compression - Soil 8 60.00 each 480.00 Lime/pH Series 1 280.00 each 280.00 Soluble Sulfates 4 75.00 each 300.00 Project Engineer, P.E. ...
Engineering and Project Delivery. The results of our field and laboratory programs will be evaluated, and a geotechnical engineering report will be prepared under the supervision of a licensed professional engineer. The geotechnical engineering report will provide recommendations for the following: • Earthwork including site and subgrade preparation. • Bridge foundation design parameters and construction • Wincore capacity curves • LPILE parameters (LPILE analyses to be performed by others) • Settlement analyses for the bridge approach embankments • Global stability analyses for MSE retaining walls • External stability analyses for MSE retaining walls In addition to our signed and sealed Geotechnical Engineering report, we also plan to provide the following deliverables. • Wincore CLG files • Signed/sealed MSE design data (MSEDD) sheets (sheets prepared by others) • Signed/sealed soil boring data sheets (sheets prepared by others)
