Engineering Runs Sample Clauses

Engineering Runs. PDL shall have the right to request that GMN manufacture at the Facility engineering runs of Product (“Engineering Runs”). The Engineering Runs shall only be used for internal purposes. All requests for Engineering Runs shall be subject to acceptance by GMN pursuant to Section 3.1.4 and 3.2. GMN shall consider all such requests in good faith and shall use Commercially Reasonable Efforts to accommodate all such requests.
AutoNDA by SimpleDocs
Engineering Runs. Supplier will perform a minimum of [*]Engineering Runs ([*]) prior to manufacturing any cGMP batches. The Engineering Runs will take place on the Equipment located in the Dedicated Suite under non-GMP conditions. Assuming that Batches are run at Full Scale for [*] and at least equivalent batch size for the [*] presentation, the price of the Engineering Run(s) will be billed to Company at a rate of $[*]/[*]. All testing, raw materials (excluding [*] and [*]) and Batch Record Documentation of the Engineering Runs will be covered in this pricing. The price of these [*] will count toward the Preliminary Monthly Fee and Monthly Fees, covered in Section 10.7.
Engineering Runs. If called for in the Project Plan, Paragon shall perform Engineering Runs and manufacture Engineering Batches in accordance with the SOW/Project Plan. Paragon will provide the services to perform such Engineering Runs and produce such Engineering Batches in accordance with the SOW/Project Plan and Client shall make the payments pursuant to the Payment Schedule to purchase such services and manufacture as further set forth in Article 6. Paragon shall provide Client with any Engineering Batches requested by Client that results from any partial or completed Engineering Runs, except to the extent that Reference Material is to be retained for use in connection with manufacture of Product in one or more Manufacturing Runs. There will be no specifications for acceptance of Engineering Batches, but the Parties may mutually agree on certain target quality attributes to aim for, if set forth in the applicable SOW/Project Plan. Paragon shall provide analytical testing of the Engineering Batch as agreed by the Parties in each SOW/Project Plan and will report the results to Client. Client shall have the right to make whatever further use of such Engineering Batches as it shall determine, provided that such use does not violate any Applicable Laws. Paragon shall in no way be responsible for any claims, demands, losses, liabilities, expenses or damages, whatsoever, including but not limited to indirect or consequential damages, arising out of or in any way related to Client’s use of such Engineering Batches.
Engineering Runs. If called for in the Project Plan, Paragon shall perform Engineering Runs and manufacture Engineering Batches in accordance with the Project Plan. Paragon and Client may agree to include one or more Engineering Targets in the Project Plan for a Project. Paragon will provide the services to perform such Engineering Runs and produce such Engineering Batches in accordance with the Project Plan and Client shall make the payments pursuant to the Payment Schedule to purchase such services and manufacture as further set forth in Article 6. Paragon shall provide Client with any Engineering Batches requested by Client that results from any partial or completed Engineering Runs, except to the extent that Reference Material is to be retained for use in connection with manufacture of Product in one or more Production Runs. Except for the Engineering Targets, there will be no specifications for acceptance of Engineering Batches, but the parties may mutually agree on certain additional target quality attributes to aim for, if set forth in the applicable Project Plan. Mutually agreed Engineering Targets shall be the sole and exclusive basis for alleging any “failure” with respect to an Engineering Run. In the event (i) an Engineering Batch does not meet the Engineering Target(s), or (ii) Paragon proceeds with an Engineering Batch without stopping at any “go/no-go” decision point agreed to in the Project Plan or Master Batch Record and receiving written instructions from Client to proceed (which instructions can be provided by any writing, including email); then at Client’s written request Paragon will repeat the Engineering Run once at no additional charge to Client assuming Client previously paid all invoices and payments associated with the failed Engineering Run (if such invoices and payments had not been paid previously, they shall be due and paid pursuant to the Payment Schedule). Except as in the preceding sentence, Paragon shall have no obligation to repeat any Engineering Run unless Client and Paragon execute a Change Order for such additional Run and the appropriate additional costs. Except as provided in this Section 3.3, Client waives all other remedies at law or in equity in connection with asserted failures in any Engineering Runs. Paragon shall provide analytical testing of the batch as agreed by the parties in each Project Plan and will report the results to Client. Client shall have the right to make whatever further use of such Engineering Batches as it ...
Engineering Runs. Notwithstanding Section 4c) or any other provision of the Supply Agreement, the Parties acknowledge that Sponsor has cancelled the [***] and as such, Fujifilm shall no longer plan to perform such manufacture and Sponsor shall have no obligation to pay Fujifilm for such [***].

Related to Engineering Runs

  • Engineering Services Definition: Engineering Services includes any service or creative work, the adequate performance of which requires education, training and experience in the application of special knowledge in consulting, investigating, evaluating, planning and designing, engineering principles. Engineering Services covered by the Xxxxxx Architect-Engineers Act (40 U.S.C. 1102) are not covered in the primary scope of OASIS SB. Examples: Service areas that are included under the Engineering Services discipline include, but are not limited to the following: 1. Systems Engineering 2. Advanced Technology Pilots and Trials 3. Alternative Energy Sources and Engineering 4. Configuration Management 5. Concept Development

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Engineering Reports (a) Not less than 30 days prior to each Scheduled Borrowing Base Redetermination Date, commencing with the Scheduled Borrowing Base Redetermination to occur on or around March 15, 2007, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report. The Reserve Reports delivered in connection with each March 15 Scheduled Borrowing Base Redetermination, commencing March 15, 2007, shall be prepared by certified independent petroleum engineers or other independent petroleum consultant(s) acceptable to the Administrative Agent. The Reserve Reports delivered in connection with each September 15 Scheduled Borrowing Base Redetermination, commencing September 15, 2007, shall be prepared by or under the supervision of the chief engineer of the Borrower and a Responsible Officer shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Scheduled Borrowing Base Redetermination Reserve Report. (b) In the event of an unscheduled redetermination, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report prepared by or under the supervision of the chief engineer of the Obligors together with the certificate of a Responsible Officer who shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Reserve Report. For any unscheduled redetermination requested by the Lenders or the Borrower pursuant to Section 2.08(d), the Borrower shall provide such Reserve Report with an “as of” date as required by the Lenders as soon as possible, but in any event no later than 30 days following the receipt of the request by the Administrative Agent. (c) With the delivery of each Reserve Report, the Borrower shall provide, or cause to be provided, to the Administrative Agent and the Lenders, a certificate from a Responsible Officer certifying that, to the best of his knowledge and in all material respects: (i) the information contained in the Reserve Report and any other information delivered in connection therewith is true and correct, (ii) the Obligors and the Partnerships own good and marketable title to the Oil and Gas Properties evaluated in such Reserve Report and such Properties are free of all Liens except for Liens permitted by Section 9.03, (iii) except as set forth on an exhibit to the certificate, on a net basis there are no gas imbalances, take or pay or other prepayments with respect to its Oil and Gas Properties evaluated in such Reserve Report which would require any Obligor to deliver Hydrocarbons produced from such Oil and Gas Properties at some future time without then or thereafter receiving full payment therefor, (iv) none of Obligor’s or and the Partnerships’ Oil and Gas Properties have been sold since the date of the last Borrowing Base determination except as set forth on an exhibit to the certificate, which certificate shall list all of its Oil and Gas Properties sold and in such detail as reasonably required by the Administrative Agent, (v) attached to the certificate is a list of its Oil and Gas Properties added to and deleted from the immediately prior Reserve Report and a list showing any change in working interest or net revenue interest in its Oil and Gas Properties occurring and the reason for such change, (vi) attached to the certificate is a list of all Persons disbursing proceeds to the Obligors from their Oil and Gas Properties, and (vii) all of the Oil and Gas Properties evaluated by such Reserve Report are Mortgaged Property except as set forth on a schedule attached to the certificate.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Architect/Engineer (A/E) means a person registered as an architect pursuant to Tex. Occ. Code Xxx., Chapter 1051, as a landscape architect pursuant to Tex. Occ. Code Xxx., Chapter 1052, a person licensed as a professional engineer pursuant to Tex. Occ. Code Xxx., Chapter 1001 and/or a firm employed by Owner or a design-build contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • GMP The parties agree that the GMP for the Project is $ , consisting of the Preconstruction Fee, the Estimated Cost of the Work and the CM/GC Fee (stated as a fixed dollar lump sum amount), as follows: Preconstruction Fee: $ Estimated Cost of Work (Est. COW): $ CM/GC Fee ( % of Est. COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!