EPC Contractor shall Sample Clauses
EPC Contractor shall. 3.1.1.1 Receive, inspect, store, unload, maintain, erect, clean, align, and prepare all Materials in accordance with the manufacturer’s instructions.
3.1.1.2 Provide lifting lugs on all equipment components or system components requiring removal for maintenance and weighing over [***] lbs.
3.1.1.3 Design the facility [***] consistent with good engineering practice for solar generation facilities. However, it is understood that some of the equipment will require routine maintenance and possible replacement during the life of the facility.
