Common use of Equipment Installation Clause in Contracts

Equipment Installation. (a) If Customer purchases and installs Equipment and Communication Lines (other than Equipment and Communication Lines currently installed at each Facility as of the date hereof), then Customer shall comply with the parameters set forth below and the installation guidelines distributed by CIS from time to time (the "Installation Guidelines"). The Installation Guidelines describe the responsibilities and duties of CIS and Customer with respect to Communication Lines. Selection of the most appropriate installation site for any additional Equipment and Communication Lines within the Facility is Customer's responsibility. At Customer's request, CIS will assist Customer in identifying installation sites, provided that in giving such assistance, CIS makes no representation that any installation site is the appropriate site for Equipment. Proper installation may require the removal of walls or other alterations to the premises. Customer shall be responsible for any costs incurred in modifying the premises to accommodate the installation of any Equipment or Communication Lines. Any damage to Customer's Equipment and Software resulting from inadequate or incomplete site preparation may not be covered by applicable maintenance agreements. (b) With respect to any purchases and installations of new Equipment and Communication Lines, Customer shall perform the following to ensure adequate site preparation: (1) When required by CIS, provide the CIS representative with appropriate drawings indicating: i. the location and lay-out of the installation site; ii. the location of existing and proposed site wiring (power and communications) and the paths and lengths thereof; and iii. the location of other equipment capable of generating electrical noise, electromagnetic interference, heat, etc.; (2) Make alterations to the premises necessary to meet wiring and other site requirements; (3) Provide and install all communication cables, wall jacks, special connectors and associated hardware; (4) Install all necessary power distribution boxes, conduits, grounds, lightening protection and associated hardware; (5) Install all required auxiliary power protection and air conditioning; (6) Provide required storage or service areas; (7) Ensure the environmental requirements of the Equipment are met; (8) Provide floor coverings and environmental systems that control static electricity build-up and discharge; and (9) Comply with all applicable federal, state and municipal laws, codes and regulations (including, without limitation, electrical, building, safety and health laws). Clauses (1) through (9) above set forth only the minimum standards, are not intended to be comprehensive and do not modify the obligations of Customer described in the Installation Guidelines or the obligation of Customer to follow the instructions and recommendations of CIS relating to the use of the Software and the Systems.

Appears in 2 contracts

Samples: Computer and Data Processing Services Agreement (Lifepoint Hospitals LLC), Computer and Data Processing Services Agreement (Triad Hospitals LLC)

AutoNDA by SimpleDocs

Equipment Installation. (a) If Customer purchases and installs Equipment and Communication Lines (other than Equipment and Communication Lines currently installed at each Facility as of the date hereof), then Customer shall comply with the parameters set forth below and the installation guidelines in the Hospital Resource Guidelines distributed by CIS from time to time (the "Installation GuidelinesHospital Resource Guide"). The Installation Guidelines describe Hospital Resource Guide describes the responsibilities and duties of CIS and Customer with respect to Communication Lines. Selection of the most appropriate installation site for any additional Equipment and Communication Lines within the Facility is Customer's responsibility. At Customer's request, CIS will assist Customer in identifying installation sites, provided that in giving such assistance, CIS makes no representation that any installation site is the appropriate site for Equipment. Proper installation may require the removal of walls or other alterations to the premises. Customer shall be responsible for any costs incurred in modifying the premises to accommodate the installation of any Equipment or Communication Lines. Any damage to Customer's Equipment and Software resulting from inadequate or incomplete site preparation may not be covered by applicable maintenance agreements. (b) With respect to any purchases and installations of new Equipment and Communication Lines, Customer shall perform the following to ensure adequate site preparation: (1) When required by CIS, provide the CIS representative with appropriate drawings indicating: i. the location and lay-out of the installation site; ii. the location of existing and proposed site wiring (power and communications) and the paths and lengths thereof; and iii. the location of other equipment capable of generating electrical noise, electromagnetic interference, heat, etc.; (2) Make alterations to the premises necessary to meet wiring and other site requirements; (3) Provide and install all communication cables, wall jacks, special connectors and associated hardware; (4) Install all necessary power distribution boxes, conduits, grounds, lightening protection and associated hardware; (5) Install all required auxiliary power protection and air conditioning; (6) Provide required storage or service areas; (7) Ensure the environmental requirements of the Equipment are met; (8) Provide floor coverings and environmental systems that control static electricity build-up and discharge; and (9) Comply with all applicable federal, state and municipal laws, codes and regulations (including, without limitation, electrical, building, safety and health laws). Clauses (1) through (9) above set forth only the minimum standards, are not intended to be comprehensive and do not modify the obligations of Customer described in the Installation Guidelines Hospital Resource Guide or the obligation of Customer to follow the instructions and recommendations of CIS relating to the use of the Software and the Systems.

Appears in 1 contract

Samples: Computer and Data Processing Services Agreement (Triad Hospitals Inc)

AutoNDA by SimpleDocs

Equipment Installation. (a) If Customer purchases and installs Equipment and Communication Lines (other than Equipment and Communication Lines currently installed at each Facility as of the date hereof), then Customer shall comply with the parameters set forth below and the installation guidelines in the Hospital Resource Guidelines distributed by CIS from time to time (the "Installation GuidelinesHospital Resource Guide"). The Installation Guidelines describe Hospital Resource Guide describes the responsibilities and duties of CIS and Customer with respect to Communication Lines. Selection of the most appropriate installation site for any additional Equipment and Communication Lines within the Facility is Customer's responsibility. At Customer's request, CIS will assist Customer in identifying installation sites, provided that in giving such assistance, CIS makes no representation that any installation site is the appropriate site for Equipment. Proper installation may require the removal of walls or other alterations to the premises. Customer shall be responsible for any costs incurred in modifying the premises to accommodate the installation of any Equipment or Communication Lines. Any damage to Customer's Equipment and Software resulting from inadequate or incomplete site preparation may not be covered by applicable maintenance agreements. (b) With respect to any purchases and installations of new Equipment and Communication Lines, Customer shall perform the following to ensure adequate site preparation: (1) When required by CIS, provide the CIS representative with appropriate drawings indicating: i. the location and lay-out of the installation site; ii. the location of existing and proposed site wiring (power and communications) and the paths and lengths thereof; and iii. the location of other equipment capable of generating electrical noise, electromagnetic interference, heat, etc.; (2) Make alterations to the premises necessary to meet wiring and other site requirements; (3) Provide and install all communication cables, wall jacks, special connectors and associated hardware; (4) Install all necessary power distribution boxes, conduits, grounds, lightening lightning protection and associated hardware; (5) Install all required auxiliary power protection and air conditioning; (6) Provide required storage or service areas; (7) Ensure the environmental requirements of the Equipment are met; (8) Provide floor coverings and environmental systems that control static electricity build-up and discharge; and (9) Comply with all applicable federal, state and municipal laws, codes and regulations (including, without limitation, electrical, building, safety and health laws). Clauses (1) through (9) above set forth only the minimum standards, are not intended to be comprehensive and do not modify the obligations of Customer described in the Installation Guidelines Hospital Resource Guide or the obligation of Customer to follow the instructions and recommendations of CIS relating to the use of the Software and the Systems.

Appears in 1 contract

Samples: Computer and Data Processing Services Agreement (Lifepoint Hospitals Inc)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!